Top-rated bathtub replacement pros.

Get matched with top bathtub replacement pros in Clinton, MD

Enter your zip and get matched with up to 5 pros

Need a pro for your bathtub replacement project in Clinton, MD?

Select your specific project to find the pro for you.

TRUSTED BY CLINTON, MD HOMEOWNERS

  • Average homeowner rating star icon4.3
    Average homeowner rating
  • Verified reviews icon2.7k+
    Verified bathtub replacements reviews

Find Bathtub replacement pros in Clinton

Avatar for Five Star Bath Solutions of Annapolis
Five Star Bath Solutions of Annapolis
5.0(
17
)

Serving Clinton, MD and surrounding areas

Approved

In business since 1996

Free estimates

Emergency services offered

"I highly recommend Five Star Bath Solutions. They are first class, outstanding company that did wonderful job for me. The quality of their work was excellent, and their price was excellent. I did a major master bathroom upgrade (completely new shower, new soaking tub, new Wayne's coating). I got quotes from several competitors and Five Star Baths had by far the best design solution, the best materials (their Sentrel product had a far better look and feel than their competitor's acrylic), and a surprisingly lower cost. I was the most impressed with the quality of people I worked with from the sales person (Patrick), to the owner (Rob), to the designer/installer (Bo), to the office manager (Brittni). They were all very skilled, very experienced professionals, and wonderful to work with. I had tough schedule, and they went out of their way to accommodate me and get the work done on time. They are a great company with lots of depth. They exceeded my expectations in every area."
Walk-in tub
Remodel
Bathtub
Shower
Shower

+16

Response time12 hrs
293 neighbors recently requested a quote
Avatar for Renken Remodeling
Renken Remodeling
4.6(
43
)

Serving Clinton, MD and surrounding areas

Approved

Super Service Award Winner

In business since 2018

Free estimates

Warranties offered

"We hired Renken to replace a shattered glass shower door. Justin showed up right on time. He was very professional and friendly. He knew exactly what needed to be done and worked very efficiently and effectively. He ensured all the glass and debris was cleaned up. We highly recommend Renken, and particularly Justin, for any remodeling and/or repair job."
Full Bathroom Remodel Project
Before and After
Shower Expansion Before and After
Remodeling - Kitchen & Bathroom Project
Remodeling - Kitchen & Bathroom Project

+19

Response time2 days
Response rate100%
6 neighbors recently requested a quote
Avatar for West Shore Home Baltimore
West Shore Home Baltimore
4.9(
412
)

Serving Clinton, MD and surrounding areas

Approved

In business since 2006

Free estimates

Credit card accepted

"The Westshore installation team of Ryan, Dante and Kevin took out our master bathroom bathtub and installed a roll in shower. The team was on time, friendly, efficient and effective. They completed this large job in 7 hours. The new shower looks great. They were very careful in our house and cleaned everything up completely. We were very impressed and happy with their work. The foreman Ryan was especially skilled at his craft. I would recommend Westshore without hesitation."
After
Before
After
Before
After

+4

1250 neighbors recently requested a quote
Recommended by97%of homeowners
Avatar for DMV Kitchen & Bath Inc
DMV Kitchen & Bath Inc
4.8(
321
)

Serving Clinton, MD and surrounding areas

Approved

Super Service Award Winner

In business since 2010

Free estimates

Warranties offered

"We selected DMV based on our previous experience with the company, starting with Rolando who successfully remodeled our kitchen and 3 baths back in 2015. This time we had an emergency and Javier responded quickly, asking his men to remove a cracked tub and demolish the surrounding tiles. In their place they installed a new tub and plumbing plus beautiful new tiles for the surrounding wall, adding 2 grab bars, one for the tub and the other for the Master shower to prevent our slipping and falling. They cleaned the grout in our Master shower and Hall tub, applied silicone and sealant, and painted the baseboard and wall near the tub. Aside from the work in the bathroom and shower, they replaced the screen in an exterior window, secured some areas in the garage ceiling with screws, and removed, painted and reinstalled our exterior shutters. Muchas gracias to David and David! Bon trabajo! During the early, uncertain days of the Pandemic when we were nervous to have anyone do remodeling inside our house, we asked Javier to do some work outdoors. He ordered a wood storage shed from Home Depot and it was delivered to our front yard without telling anyone. The DMV men unpacked the box and discovered some necessary parts were missing so returned to Home Depot to buy them. They leveled the slope in our backyard and set the foundation for the shed. Then they added shingles, windows, doors, and a ramp. They painted the outside of the shed and added a ramp, selecting a sturdier paint for the latter. They installed a screen all around the bottom edge of the shed to provide ventilation and keep the animals out. Finally they moved the items to be stored from our garage to the new shed, opening up more space in the garage for the remodeling of the 1st and 2nd floors of our house. Muchas gracias to Jose, Carmina, Orlando, and Wilmer! Bon trabajo! Finally after a long wait due to the Pandemic we remodeled the 1st and 2nd floors of our house with Javier once again in charge. The workmen skillfully disassembled and/or moved furniture, file cabinets, supplies, and 100s of books and other items to different locations in the house and garage. Then they installed new lighting: 53 recessed lights, 9 dimmers, and a new electrical outlet near the vanity. When a bookcase was added on the right side of my new digital organ they moved the organ to the left along with 2 recessed lights shining above the organ to more effectively illuminate the music rack. And finally they installed a special circuit breaker for the organ. They installed cabling for 3 internet connections to the computer network giving access to the basement, living room, and 2nd floor. They installed the wiring for electrical power to 3 printers, one on each floor. Next they replaced our carpet with beautiful hardwood floors in 7 rooms, a small hallway, and a stairway. They removed 5 single doors on the 2nd floor and replaced them with solid core doors. They installed and painted 2 bi-folding doors for our utility closets. They painted the walls in 7 rooms, a small hallway, and a stairway first removing wallpaper in one room and 2 wall borders. They took special care in the den, repairing one wall and a big hole in the ceiling before painting. They did a great job of painting the ceilings, touching up 4 textured ceilings and smoothing out 3 others in a more elaborate process that included repairing drywall and removing texture, preparing the ceiling for painting, and then actually painting it. They installed and painted shoe molding in 7 rooms. And last but not least they repaired bathroom door frame and painted the nearby wall and a baseboard that had some paint splotches from a previous job. The DMV workmen did some additional jobs not related to repairing and painting walls and ceilings, or installing hardwood floors. The installed 5 smoke detectors, 7 curtain rods, a new Bosch dishwasher, and new blinds to replace blinds accidently damaged. They caulked a bathtub, cleaned grout in a shower and caulked the area near its door. In order to prevent heavy bookcases from toppling over they secured 10 bookcases to the wall. And in a final visit they even tightened screws in the kitchen cabinets installed by the previous DMV contractor. Muchas gracias to the 2 Maynors, Geovany, Jesus, David, Danillo, Diego and the flooring team, Grover, Luis, Orlando, and Fairo. Bon travajo! The quality of materials and workmanship on the outdoor shed and remodeling of bathroom, first and second floors was exceptional. Because we are an elderly couple we really appreciated the extra help in moving things around throughout the projects. The workmen were punctual, polite, honest, skilled, hardworking, and flexible in adjusting to changes from time to time. They always took care in sealing off work areas, covering floors, and cleaning up at the end of the day. The price seems reasonable because sometimes they did extra work not previously budgeted like extra painting or changes when were not satisfied or had new ideas. Javier is great at planning, communicating and executing the work, but could certainly benefit from having a right-hand man to assist him when he is not immediately available. We would highly recommend DMV and have already signed a contract for remodeling our basement that includes vinyl flooring, lighting, painting, and installation of storage shelves. We selected DMV based on our previous experience with the company, starting with Rolando who successfully remodeled our kitchen and 3 baths back in 2015. This time we had an emergency and Javier responded quickly, asking his men to remove a cracked tub and demolish the surrounding tiles. In their place they installed a new tub and plumbing plus beautiful new tiles for the surrounding wall, adding 2 grab bars, one for the tub and the other for the Master shower to prevent our slipping and falling. They cleaned the grout in our Master shower and Hall tub, applied silicone and sealant, and painted the baseboard and wall near the tub. Aside from the work in the bathroom and shower, they replaced the screen in an exterior window, secured some areas in the garage ceiling with screws, and removed, painted and reinstalled our exterior shutters. Muchas gracias to David and David! Bon trabajo! During the early, uncertain days of the Pandemic when we were nervous to have anyone do remodeling inside our house, we asked Javier to do some work outdoors. He ordered a wood storage shed from Home Depot and it was delivered to our front yard without telling anyone. The DMV men unpacked the box and discovered some necessary parts were missing so returned to Home Depot to buy them. They leveled the slope in our backyard and set the foundation for the shed. Then they added shingles, windows, doors, and a ramp. They painted the outside of the shed and added a ramp, selecting a sturdier paint for the latter. They installed a screen all around the bottom edge of the shed to provide ventilation and keep the animals out. Finally they moved the items to be stored from our garage to the new shed, opening up more space in the garage for the remodeling of the 1st and 2nd floors of our house. Muchas gracias to Jose, Carmina, Orlando, and Wilmer! Bon trabajo! Finally after a long wait due to the Pandemic we remodeled the 1st and 2nd floors of our house with Javier once again in charge. The workmen skillfully disassembled and/or moved furniture, file cabinets, supplies, and 100s of books and other items to different locations in the house and garage. Then they installed new lighting: 53 recessed lights, 9 dimmers, and a new electrical outlet near the vanity. When a bookcase was added on the right side of my new digital organ they moved the organ to the left along with 2 recessed lights shining above the organ to more effectively illuminate the music rack. And finally they installed a special circuit breaker for the organ. They installed cabling for 3 internet connections to the computer network giving access to the basement, living room, and 2nd floor. They installed the wiring for electrical power to 3 printers, one on each floor. Next they replaced our carpet with beautiful hardwood floors in"
Kitchen Remodeling-Medallion Cabinets
contemporary microwave installed on the kitchen island
Vienna -VA Kitchen
Bathroom Brookeville-MD
Kitchen Remodeling-Medallion Cabinets

+50

Response time11 hrs
43 neighbors recently requested a quote
Recommended by96%of homeowners
Avatar for Penate Home Improvement LLC
Penate Home Improvement LLC
4.9(
141
)

Serving Clinton, MD and surrounding areas

Approved

In business since 2006

Free estimates

Warranties offered

"Very well! Ronal tiled the the bathtub/shower walls and the bathroom floor, as well as the backsplash in the kitchen. He is very professional, conscientious, meticulous, and worked with us to achieve our desired outcome. We were very pleased with the results."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+701

Response time3 days
6 neighbors recently requested a quote
Recommended by95%of homeowners
Avatar for Long Home
Long Home
4.3(
211
)

Serving Clinton, MD and surrounding areas

Approved

Super Service Award Winner

In business since 1945

Free estimates

Credit card accepted

"Long Baths is simply great. They installed the shower of my dream that through no fault of their own succumbed to a manufactures defect. Chris Reynard and Long Baths worked fast and replaced my shower covered by my warranty at no additional charge. I am thankful to know I worked with a company that stood by their work and lifetime warranty."
Wet Area Replacement
Wet Area Replacement
Response time6 hrs
650 neighbors recently requested a quote
Recommended by89%of homeowners
Avatar for Third Generation Ceramic Tile & Plumbing
Third Generation Ceramic Tile & Plumbing
4.7(
67
)

Serving Clinton, MD and surrounding areas

Approved

In business since 1952

Free estimates

Emergency services offered

"Robert saved me a ton of money by informing me that I did NOT need to completely replace our shower handle units and in turn redo a bathtub. He found a simple solution to a problem I had previously been told need intensive work. He was readily available to come and give an estimate for the work. He was pleasant, punctual, informative, and followed through on the work discussed. He even agreed to recaulk our shower that I had tried to do myself. I found him to be honest and efficient at solving problems and giving advice on future work. I will utilize his services from now on all home improvement fronts before seeking out others."
Kitchen Refrigerator
Kitchen Counter
Kitchen Sink
Shower After
Vanity After

+3

Response time1 day
9 neighbors recently requested a quote
Recommended by87%of homeowners
Avatar for United Carpet, Floorz, Kitchen & Bath
United Carpet, Floorz, Kitchen & Bath
4.8(
25
)

Serving Clinton, MD and surrounding areas

Approved

In business since 1972

Free estimates

Warranties offered

"United Kitchen and Bath remodeled both bathrooms in 2023. Alex and his workers performed an exceptional job on my bathrooms. Both bathrooms turned out gorgeous. Alex is very professional and has excellent customer service. This year, I worked with Max on recarpeting. He is very skilled and very professional in carpet, and he has a very wide selection of carpet in the store. The carpet is gorgous, My family loves it. I would recomend Max and Alex to everyone."
OUR SHOWROOM IN WALDORF
Up to 18 Months NO INTEREST FINANCING available
Kitchen
Master Bath
Family room

+5

Response time12 hrs
Response rate97%
17 neighbors recently requested a quote
Avatar for Renuity
Renuity
4.4(
30
)

Serving Clinton, MD and surrounding areas

Approved (Corporate)

In business since 2000

Free estimates

Warranties offered

"Replaced a bow window and a patio slider. They accomplished it all in one day. They were clean, covered everything up when they were working so there was minimal dust. Vacuumed when they finished. Pleasant and professional. I highly recommend Rite Window."
Entry Door
Doors
Doors
Doors
During Installation

+55

Response time6 hrs
1098 neighbors recently requested a quote
Recommended by85%of homeowners
...
Showing 1-10 of 810
Bathtub Replacement questions, answered by experts

Alcove tubs come in fiberglass, acrylic, or enameled steel. Fiberglass is the most affordable but least durable, while acrylic is the highest-end and most durable (as long as you don’t go with a poor grade of acrylic, which will be prone to scratches). Enameled steel, where a steel tub is coated in a layer of porcelain, is a wallet-friendly middle ground. This material is highly durable but prone to chips.

Technically, yes, you can put a shower on a Roman tub, but it's not common. The vast majority of Roman tubs are standalone models. Adding a shower would involve installing a ceiling-mounted curtain rod or a custom glass enclosure, as well as redoing the plumbing, making it neither easy nor budget-friendly.

Yes, a bathroom remodel is a worthwhile home improvement project that typically adds value to your home, offering a return on investment (ROI) between 60% and 70%. Potential buyers look closely at bathrooms and kitchens, as these are often the most expensive rooms to renovate. A modern, updated bathroom is more appealing and assures buyers that the plumbing, fixtures, and flooring have a long, useful life ahead. Beyond the financial return, a remodel can also greatly increase your day-to-day satisfaction by creating a more inviting, spa-like space. Even a basic refresh with new paint and accessories can make a significant difference.

Start by gutting the old fixtures and features that need to be removed, such as the tile, vanity, and flooring. You may benefit by removing the toilet, even if you intend to use the same one. Next, install the new shower or tub, followed by the flooring, and then the drywall, which you should then paint. After that, install your new cabinets, vanity, countertop, sink, and faucet, in that order. Replace your light fixture next. Lastly, reconnect the toilet.

The plumbing industry has standardized the sizes for bathtub drains. They are 1 1/2 inches wide to fit all standard bathtubs from 14 to 26 inches deep. The standard sizing is to ensure that the drain fits into the P trap, a special part of your piping that prevents sewer water from bubbling up into your home (yuck).

The Clinton, MD homeowners’ guide to bathtub replacements

From average costs to expert advice, get all the answers you need to get your job done.