Top-rated pool builders and installers.

Get matched with top pool builders and installers in Bolingbrook, IL

Enter your zip and get matched with up to 5 pros

Need a pro for your pool construction and installation project in Bolingbrook, IL?

Select your specific project to find the pro for you.

TRUSTED BY BOLINGBROOK, IL HOMEOWNERS

  • Average homeowner rating star icon3.9
    Average homeowner rating
  • Verified reviews icon85
    Verified pool constructions and installations reviews

Find Pool builders and installers in Bolingbrook

Avatar for APS Pools and Spas
APS Pools and Spas
4.5(
32
)
Swimming Pool: Fiberglass - Build or Install

Serving Bolingbrook, IL and surrounding areas

Approved

Super Service Award Winner

In business since 2003

Free estimates

Emergency services offered

"APS installed a River Pools 16x36 fiberglass pool in our backyard between May and July 2023. While there were some delays with some of the patio materials, we were very pleased with the final result and the pricing was competitive. Keith was very responsive and helped us with getting our pool balanced and ready for swimming."
Front View
Side View
Before Walkway
Before Patio
Holland Stone Patio

+74

Response time3 days
5 neighbors recently requested a quote
Recommended by51%of homeowners
...
Showing 1-10 of 59
Pool Construction and Installation questions, answered by experts

ALTA/ACSM surveys are the most comprehensive type of land survey and, as such, tend to be the most expensive. These surveys have standardized guidelines and reports and are used in many kinds of real estate transactions to ensure consistent and accurate information is available for properties.

If you or your mortgage lender think your land survey needs to be more accurate, double-check the survey report and get at least a second opinion from the original surveyor and an inspector, if possible. Although it’s unlikely, even reputable surveying companies can make mistakes. An inaccurate survey can cause problems down the road in the case of any property line disputes, so it’s best to resolve any inaccuracies as quickly as possible.

Construction typically takes 3-6 months, including site preparation and assembly.

This is fairly rare, but sometimes the local government or a group like a historical society will label a tree as a landmark, or historical item. These designations almost always come with a small, on-site plaque for identification, but you should also be able to look up protected trees in your area on a city website or similar list. If the tree in question is a landmark, call your local government and ask how to proceed before making any plans.

If a buyer pays for a survey, the surveyor they hired will only provide results to them. It’s up to the buyer whether they share the survey results with the seller or not, even if they ultimately walk away from the deal. It’s considered good faith to share the results with the seller, though, especially if you back out of the deal, as the seller can then provide that survey to future interested parties.

The Bolingbrook, IL homeowners’ guide to pool constructions and installations

From average costs to expert advice, get all the answers you need to get your job done.