Top-rated above ground pool installation pros.

Best above ground pool installation pros near Post Falls, ID

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Post Falls, ID?

Select your specific project to find the pro for you.

TRUSTED BY POST FALLS, ID HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon21
    Verified above ground pool installation services reviews

Top-Rated Above ground pool installation pros in Post Falls - Updated Nov 2026

Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,689
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Post Falls, ID and surrounding areas

In business since 1971

Credit card accepted

"One oven doesn't work at all ( my choice, see above), the "working" oven was never calibrated properly so using it is hit or miss. It's time to call American Home Shield to see about replacing the entire unit. I'm waiting to finish other home projects before calling them. I don't know if I'll request Greenway again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Install Above Ground Pools FAQs, answered by experts

Yes, pools provide a safe, covered, and cool environment for frogs to lay eggs. Frogs also require calm water to lay their eggs, so having a constant flow of water from a pool pump or water feature will deter frogs from laying eggs in your pool.

Your contractor will need several days to several weeks as far as a timeline to install your semi-inground pool goes. Adapting an aboveground pool to be semi-inground by excavating and partially burying the liner, for example, will only take three to five days, while installing an in-ground pool with a poured concrete liner and building up the land around it will require several weeks. Keep in mind that the process of hiring a pool contractor and applying for permits can add several additional weeks to the total timeline.

The amount of time your fiberglass pool project will take depends on the size of the pool and whether you are installing add-ons like decking and landscaping. Overall, you should expect it to take four to six weeks to install. If you are dreaming of summer pool parties, make sure to budget enough time into the installation schedule to have your pool up and running in time for the swimming season.

In-ground pools are more durable and have a longer lifespan, but aboveground pools are an excellent option for homeowners on a budget. Aboveground pools are also easier to remove if you no longer want to maintain one.

The cost of an aboveground pool is $800 to $5,000 for materials and $1,000 to $3,000 for labor. Before deciding, weigh the pros and cons of each pool.

The number of gallons in your pool will determine how much chlorine you’ll need to add to your pool for the first time. Chlorine levels should fall between 1 and 3 ppm. It's crucial to read the instructions on your chlorine packet to determine the number of tablets to put in the water based on your pool's capacity.

The Post Falls, ID homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.