Top-rated above ground pool installation pros.

Best above ground pool installation pros near Sagle, ID

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Sagle, ID?

Select your specific project to find the pro for you.

Top-Rated Above ground pool installation pros in Sagle - Updated Nov 2026

Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,689
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Sagle, ID and surrounding areas

In business since 1971

Credit card accepted

"One oven doesn't work at all ( my choice, see above), the "working" oven was never calibrated properly so using it is hit or miss. It's time to call American Home Shield to see about replacing the entire unit. I'm waiting to finish other home projects before calling them. I don't know if I'll request Greenway again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Avatar for DSA Remodel
DSA Remodel
4.3(
2
)
Swimming Pool - Above Ground, Build or Install - Have Materials

Serving Sagle, ID and surrounding areas

In business since 2021

Free estimates

Emergency services offered

Here at DSA Remodel, we sustain our business on quality and integrity. We are experts in our trade and our commitment to quality from beginning to end of your project. We look forward to earning your business. Call us anytime with any questions you may have. Thanks for your time and have a great day.

Texture the entire home 2
Texture the entire home 2
Texture the entire home 2
Texture the entire home 2
Texture

+1

Response time10 hrs
Recommended by100%of homeowners
Install Above Ground Pools FAQs, answered by experts

The process involves selecting a site, preparing the ground, setting up a supportive frame, and securely installing the liner and water filtration system.

Your contractor will need several days to several weeks as far as a timeline to install your semi-inground pool goes. Adapting an aboveground pool to be semi-inground by excavating and partially burying the liner, for example, will only take three to five days, while installing an in-ground pool with a poured concrete liner and building up the land around it will require several weeks. Keep in mind that the process of hiring a pool contractor and applying for permits can add several additional weeks to the total timeline.

Building a pool yourself will take at least eight to 12 weeks. After all, this is the building timeline after hiring a pool contractor who knows how to draw up plans, analyze your landscape, and apply for proper permits. If you choose to tackle any part of the process alone, assume building a pool will take two to three months at a minimum.

The steps to fill a swimming pool will depend on your local building codes. However, it starts with draining the pool of all water using a submersible pump. Then your pro will lift the pool shell from the ground or break it into pieces for individual removal. The next step is filling the cavity with dirt and gravel and topping it with topsoil. Once a structural engineer deems the site safe, landscaping can start.

Fiberglass pools last the longest because they need the least amount of maintenance and do not have liners that can affect a pool's integrity. Concrete pools last the longest, next to fiberglass.

The Sagle, ID homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.