Top-rated backsplash installation pros.

Get matched with top backsplash installation pros in Villisca, IA

Enter your zip and get matched with up to 5 pros

Need a pro for your backsplash installation project in Villisca, IA?

Select your specific project to find the pro for you.

TRUSTED BY VILLISCA, IA HOMEOWNERS

  • Average homeowner rating star icon4
    Average homeowner rating
  • Verified reviews icon19
    Verified backsplash installation services reviews

Find Backsplash installation pros in Villisca

Avatar for Top Notch Renovations  Facebook
Top Notch Renovations Facebook
4.6(
9
)

Serving Villisca, IA and surrounding areas

In business since 2014

Free estimates

Offers commercial services

"I hired them to do a full kitchen remodel and it turned out fantastic I'm very happy with the result the towel work looks great also thanks you have a customer for life!!!"
Response time3 hrs
Response rate100%
Recommended by100%of homeowners
Avatar for A Cut Above The Rest Contractors
A Cut Above The Rest Contractors
1.3(
2
)

Serving Villisca, IA and surrounding areas

In business since 2012

Free estimates

Emergency services offered

Welcome to A Cut Above The Rest Contractors. We are the premier professional home improvement company. We offer the highest quality and most attentive customer service. We are known to pay exquisite attention to detail, while making customer satisfaction our top priority. Whether your project involves minor repairs or a completely new replacement or installation, we are glad to be your number one choice. \n\nPlease call us today to schedule your appointment!

Needs Updated
Completed Update
original 1980s bathroom
Renovated with modern ammenities
Tile Backsplash

+7

Response time4 hrs
Response rate100%
Backsplash Installation questions, answered by experts

Replacing tile flooring can take a few days for a pro, but larger rooms will need more time. It takes eight to 12 hours for a tiling pro to remove old grout and tiles across 100 square feet. Then, it will take about four hours to prep the subfloor for tiles and another eight to 10 hours for a pro to install new tiles. Your tiling project may take up to a week, depending on the size of the room.

The tile spacing you should use will depend on the tile and where you’re installing it. Choosing the right tile spacers to maintain a consistent gap between your tiles is tricky. Generally, tile spacing shouldn’t be less than 2 millimeters on walls and 3 millimeters on floors because of stress relief requirements. Getting it wrong can result in uneven tiles and early repairs.

Flooring transition strips can be secured to the subfloor using glue, nails, or screws. For a more secure installation, especially in high-traffic areas, using screws or nails is recommended as it reduces the risk of slippage. However, if aesthetic appeal is a priority, glue provides a cleaner, more seamless finish without any visible holes or screw heads.

Here’s another instance of where the answer is you could, but that doesn’t mean you should. Yes, part of the issue is getting the drywall to stay in place on the tiles, and it’s understandable that screws will crack the tiles and cause them to crumble. That’s why it’s a much better idea to screw drywall into studs, not your porcelain or ceramic tile. But aside from issues with attaching the drywall, it’s also about ensuring a smooth application without trapping moisture inside.

Yes, it would be best if you waterproofed your shower walls before tiling. The cement backing board behind the tile is not waterproof; it’s only water-resistant. On top of your tile backing board, be sure to use a waterproof shower membrane before you start installing your shower tiles.

The Villisca, IA homeowners’ guide to backsplash installation services

From average costs to expert advice, get all the answers you need to get your job done.