Top-rated backsplash installation pros.

Get matched with top backsplash installation pros in Villisca, IA

Enter your zip and get matched with up to 5 pros

Need a pro for your backsplash installation project in Villisca, IA?

Select your specific project to find the pro for you.

TRUSTED BY VILLISCA, IA HOMEOWNERS

  • Average homeowner rating star icon4
    Average homeowner rating
  • Verified reviews icon19
    Verified backsplash installation services reviews

Find Backsplash installation pros in Villisca

Dave Navarro Construction
5.0(
2
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For Business

Serving Villisca, IA and surrounding areas

In business since 2010

Free estimates

We are a General contracting company. We perform all services involved in the completion of unfinished space. We do hire sub contractors when needed. We also stand by their work as well. Though we have only been in buisness for a short time. we have a combined 37 years construction experience.

Recommended by100%of homeowners
Avatar for A Cut Above The Rest Contractors
A Cut Above The Rest Contractors
1.3(
2
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For BusinessTile: Natural Stone (Granite, Marble, Slate, Quartz, etc) - Install+1 more

Serving Villisca, IA and surrounding areas

In business since 2012

Free estimates

Emergency services offered

Welcome to A Cut Above The Rest Contractors. We are the premier professional home improvement company. We offer the highest quality and most attentive customer service. We are known to pay exquisite attention to detail, while making customer satisfaction our top priority. Whether your project involves minor repairs or a completely new replacement or installation, we are glad to be your number one choice. \n\nPlease call us today to schedule your appointment!

Needs Updated
Completed Update
original 1980s bathroom
Renovated with modern ammenities
Tile Backsplash

+7

Response time4 hrs
Response rate100%
Backsplash Installation questions, answered by experts

If you’re handling your tile removal yourself, seal the room using painter’s tape and heavy-duty contractor bags to prevent dust and shards from escaping. Use a claw hammer or a pry bar and a mallet to get behind the tile and pry it away from the floor or wall. Once your tiles are all removed, sweep everything into contractor bags for disposal, being careful not to overfill them. Make sure you wear a dust mask, safety goggles, and work gloves to keep yourself safe from injury while you work.

No, you don’t technically need a cement backer board for a wall tiling project, but not using it risks disastrous moisture damage. Cement is naturally water-resistant, whereas drywall soaks it in, which can lead to warping or mold growth. Always use a backer board treated with a waterproof membrane for bathrooms and other chronically damp areas to ensure complete tile shower waterproofing.

The number of boxes of tile you need depends entirely on the amount of tile in each box or case. Different manufacturers package their tiles differently, and boxes contain different amounts of tile depending on the size, shape, and material. Often, the amount of area that a case will cover is listed in the product description. To calculate the number of boxes you need, take the total square feet of the space and divide it by the number of square feet the box will cover.

You can purchase natural stone tiles from your local home improvement store or stone distributor. 

Simply put, natural stone flooring is a high-end style that outlasts its wood and carpet counterparts. After finding a style you love, a stone flooring company near you can help source and install them for a reliably clean look.

The process takes two to four days, depending on the size of the area and your experience level. The first day involves assessing and prepping the existing tile, while the second day is for laying the new tile. This may take longer in complex areas. After letting the adhesive dry for 24 hours, grouting and sealing can be completed on day three. For larger projects or intricate tile patterns, expect the timeline to stretch a bit longer. Also, proper drying time between steps is essential for long-lasting results, which extends the project’s time.

The Villisca, IA homeowners’ guide to backsplash installation services

From average costs to expert advice, get all the answers you need to get your job done.