Top-rated basement remodelers.

Get matched with top basement remodelers in Dover, FL

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Dover, FL?

Select your specific project to find the pro for you.

Find Basement remodelers in Dover

Avatar for CER Design Build
CER Design Build
4.8(
21
)

Serving Dover, FL and surrounding areas

In business since 2000

Free estimates

Emergency services offered

""I am very pleased with the work of Cer Custom Renovations. The guys did a quality job on Remodeling for my project. All work was completed on time without delays or shortcomings. I will recommend the company to my friends and business colleagues. Thank you for the good work!""
Custom cabinets
Chefs kitchen
Master bath
Theater
Additional Photos

+22

Recommended by95%of homeowners
Avatar for Tampa Bay Marble and Design
Tampa Bay Marble and Design
4.7(
174
)

Serving Dover, FL and surrounding areas

In business since 2000

Free estimates

Credit card accepted

"Remodeling our kitchen was an interesting experience and we were very happy with the result. Since first day Jess was very helpful and transparent with the information we needed and was always available for any question we might had. He and his team did everything to make the experience as smooth and efficient as possible. It only took 2 weeks to complete the remodeling and they were very professional and always on time with the schedule."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+28

Recommended by94%of homeowners
Restoration and Redesign, LLC
5.0(
3
)

Serving Dover, FL and surrounding areas

"They previously renovated 2 of my bathrooms, he takes pride of his work, and he was very considerate and I was very pleased with his work. He had done quite a number of things in my house, he has done it good, that's why I keep calling him for more additional works, in fact he is doing another project for me today. His pricing was reasonable."
Recommended by100%of homeowners
...
Showing 1-10 of 67
Basement Remodel questions, answered by experts

The average cost to remodel a basement is between $12,100 and $33,400. Depending on the project's complexity, the price can be as low as $3,500 or exceed $50,200. For a simple project like adding a home office, you might spend between $500 and $3,000. However, a more extensive project, such as adding a bathroom, can range from $6,600 to $16,500. The final cost is influenced by factors like the basement's size and condition, the type of remodel, material choices, your location, and accessibility. For an accurate price, it's best to consult with a basement remodeling team.

You technically can paint wires in a basement ceiling, but there are several important safety and code considerations. It's safe to paint non-metallic sheathed cable as long as the labeling remains visible. You can also paint low-voltage wires and conduit and junction boxes to help them blend into your basement. 

However, you should not paint damaged or deteriorated wiring is a fire hazard because it poses a fire hazard. The same goes for painting over high-heat wires that connect to heat-generating appliances or systems. Be sure to avoid painting multiple coats onto any wires, as that traps heat and poses fire risks.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Envision the type of bar experience you'd like to create for your guests. For example:

  • Does your basement have enough finished space for bar stools or seating?

  • What type of additional lighting would set the tone for the room?

  • Are there basement windows or an HVAC system?

  • Do you need new plumbing in your basement for a proper wet bar?

  • Could you be happy with a built-in wall cabinet bar rather than a full-scale wet bar?

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

The Dover, FL homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.