Top-rated basement remodelers.

Best basement remodelers near Dover, FL

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Dover, FL?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in Dover - Updated Nov 2026

Coastal GC Construction LLC
New to Angi
Basement - Remodel

Serving Dover, FL and surrounding areas

Approved

Free estimates

Credit card accepted

Offers commercial services

We invite you to experience a tradition of customer satisfaction that will exceed your greatest expectations. Our professionalism and quality workmanship will accurately reflect your taste and lifestyle. From conception to completion, we work with you until the job is done. We are ethical, honest, and easy to communicate with. \n \n \nCall us today you'll be pleased you did. Thank you \n \n-remodel \n-new construction \n-engineering services \n-drainage and erosion \n-permitting \n

10 neighbors recently requested a quote
Avatar for CER Design Build
CER Design Build
4.8(
21
)
Basement - Remodel

Serving Dover, FL and surrounding areas

In business since 2000

Free estimates

Emergency services offered

""I am very pleased with the work of Cer Custom Renovations. The guys did a quality job on Remodeling for my project. All work was completed on time without delays or shortcomings. I will recommend the company to my friends and business colleagues. Thank you for the good work!""
Custom cabinets
Chefs kitchen
Master bath
Theater
Additional Photos

+22

Recommended by95%of homeowners
Avatar for Tampa Bay Marble and Design
Tampa Bay Marble and Design
4.7(
174
)
Basement - Remodel

Serving Dover, FL and surrounding areas

In business since 2000

Free estimates

Credit card accepted

"Remodeling our kitchen was an interesting experience and we were very happy with the result. Since first day Jess was very helpful and transparent with the information we needed and was always available for any question we might had. He and his team did everything to make the experience as smooth and efficient as possible. It only took 2 weeks to complete the remodeling and they were very professional and always on time with the schedule."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+28

Recommended by94%of homeowners
...
Showing 1-10 of 71
Basement Remodel FAQs, answered by experts

You should plan on waiting at least a year and ideally two to three years after construction before finishing your basement. This will give the foundation time to settle in response to the weight of your home and the expansion of the surrounding soil. You can then repair your foundation and seal any cracks as needed before finishing it to reduce your risk of future leaks or other issues.

Whether it’s more affordable to gut a house than build a new one depends on the markets where you'd be buying and selling. However, it’s usually less expensive to renovate a home than to build new construction. 

Most homeowners pay between $100,000 and $200,000 for demolition and remodeling costs, whereas the average cost to build a new home is between $139,000 and $531,300.

Yes, adding a walkout basement will usually bump up your property value. Most homeowners prefer walk out basements because the exposed wall that’s level with the ground provides more utility via a ground-level exterior entrance, and they can fit full windows, which adds natural light and ventilation to the basement area. The only exception might be in areas prone to tornadoes, as walkout basements aren’t as safe as regular basements during a tornado, particularly if they include large windows or glass sliding doors.

Building up by adding square footage to the top of your home is often less expensive than adding a basement, but it depends on the specifics of your house, your property, and supply costs. Because building a basement requires excavation, it can be a more expensive option than building up.

Yes, most general contractors require an initial down payment, typically between 10% and 25% of the total project cost. This upfront payment helps cover the costs of materials, permits, and subcontractors. The remaining project costs are usually billed after specific project milestones are reached or on set completion dates, as outlined in your contract. Be wary of contractors who require a significant deposit of 50% or more upfront, as this could be a red flag for a scam.

The Dover, FL homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.