Top-rated basement remodelers.

Get matched with top basement remodelers in Bowling Green, FL

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Bowling Green, FL?

Select your specific project to find the pro for you.

Find Basement remodelers in Bowling Green

Avatar for Witty Innova Solutions
Witty Innova Solutions
4.8(
30
)
Basement - Remodel

Serving Bowling Green, FL and surrounding areas

In business since 2017

Emergency services offered

Credit card accepted

"Great experience with this company with the remodeling at my property, totally recommended, there were responsible, professional and diligent on timely manner, nothing bad to say, everything was as expected."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+352

Recommended by64%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Bowling Green, FL and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Aceves Construction llc
Aceves Construction llc
5.0(
3
)
Basement - Remodel

Serving Bowling Green, FL and surrounding areas

In business since 2020

Free estimates

Emergency services offered

Aceves construction llc we are a company with more than 25 years of experience in everything about general remodeling and repairs of Driwall and framing interior and exterior painting laminated floors kitchen installations and much more

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+8

Recommended by100%of homeowners
Avatar for Charles Schossler jr llc
Charles Schossler jr llc
4.8(
4
)
Basement - Remodel

Serving Bowling Green, FL and surrounding areas

In business since 2017

Free estimates

Emergency services offered

Specializing in HOME REMODELING! We always guarantee your satisfaction and won’t leave until the job is done right. We take pride in ourselves and on the quality work we provide, while always delivering great customer service! Check out our services offered, then call --or-- click to schedule a free estimate today! We do anything from home remodeling, kitchen and bath remodeling, drywall and finishing, power washing and interior and exterior painting.

Additional Photos
Additional Photos
Recommended by100%of homeowners
Showing 1-10 of 32
Basement Remodel questions, answered by experts

To determine if your basement walls are suitable for finishing, assess their structural integrity and moisture conditions. Look for any signs of damage, such as cracks, bowing, or excessive moisture. Ensure proper drainage and address any underlying issues before proceeding. 

Consult with a professional if you're uncertain about the structural stability or potential risks associated with finishing your basement walls.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Yes, you can install a summer kitchen or kitchenette in your basement. They serve similar purposes as outdoor kitchens, keeping the main floor of the house cool and providing another space to cook and congregate. Basement kitchens are also a worthwhile alternative for homeowners without much space in the backyard. They come with a few logistical questions to sort out, though, like ventilation and waterproofing.

Basements are commonly converted into game rooms. The potential challenges you may run into include controlling moisture, working with low ceilings, limited natural light, and the need for additional electrical or HVAC work. Addressing these issues can add to the total cost, but it ensures a comfortable and functional space.

You technically can paint wires in a basement ceiling, but there are several important safety and code considerations. It's safe to paint non-metallic sheathed cable as long as the labeling remains visible. You can also paint low-voltage wires and conduit and junction boxes to help them blend into your basement. 

However, you should not paint damaged or deteriorated wiring is a fire hazard because it poses a fire hazard. The same goes for painting over high-heat wires that connect to heat-generating appliances or systems. Be sure to avoid painting multiple coats onto any wires, as that traps heat and poses fire risks.

The Bowling Green, FL homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.