Top-rated basement remodelers.

Get matched with top basement remodelers in Westchase, FL

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Westchase, FL?

Select your specific project to find the pro for you.

Find Basement remodelers in Westchase

Avatar for AAA Certified Restoration & Construction, LLC
AAA Certified Restoration & Construction, LLC
5.0(
24
)

Serving Westchase, FL and surrounding areas

Approved

In business since 1995

Customers say: Quick response

"Excellent customer service Ann and her crew were professional and made our kitchen remodeling simple and it turnd out beautiful. We will definitely use them again for future projects"
Hutch Area Cabinet Grouping
Family Room Entertainment Center
View of Family Room to Kitchen and Dining Room
Dining Room TIle floor to match Kitchen
Response time8 hrs
Response rate94%
9 neighbors recently requested a quote
Avatar for Martin Day Construction LLC
Martin Day Construction LLC
5.0(
2
)

Serving Westchase, FL and surrounding areas

Approved

In business since 2018

Free estimates

Credit card accepted

We have a single mission: Complete Customer Satisfaction! We have consistently focused on the needs of our customers, providing personalized attention and a stress-free experience.\nYou will find us to be competitively priced with close attention to the details.\nOur reputation is based on service, safety, and quality, regardless of how large or small the job.\nWe look forward to building a lasting relationship and guarantee your satisfaction!\n

Bathroom Remodel
Response time1 day
Response rate100%
Avatar for CER Design Build
CER Design Build
4.8(
21
)

Serving Westchase, FL and surrounding areas

In business since 2000

Free estimates

Emergency services offered

""I am very pleased with the work of Cer Custom Renovations. The guys did a quality job on Remodeling for my project. All work was completed on time without delays or shortcomings. I will recommend the company to my friends and business colleagues. Thank you for the good work!""
Custom cabinets
Chefs kitchen
Master bath
Theater
Additional Photos

+22

Recommended by95%of homeowners
Avatar for Tampa Bay Marble and Design
Tampa Bay Marble and Design
4.7(
174
)

Serving Westchase, FL and surrounding areas

In business since 2000

Free estimates

Credit card accepted

"Remodeling our kitchen was an interesting experience and we were very happy with the result. Since first day Jess was very helpful and transparent with the information we needed and was always available for any question we might had. He and his team did everything to make the experience as smooth and efficient as possible. It only took 2 weeks to complete the remodeling and they were very professional and always on time with the schedule."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+28

Recommended by94%of homeowners
Avatar for JC DRYWALL & TEXTURE SOLUTION LLC
JC DRYWALL & TEXTURE SOLUTION LLC
4.8(
27
)

Serving Westchase, FL and surrounding areas

Emergency services offered

"I recommend this company they are very professional I have worked several times in the past and I have no complain everything has gone smoothly very professional and ethical"
Drywall Project
Plaster Project
Drywall Project
Drywall Project
Remodeling - Kitchen & Bathroom Project

+165

Recommended by100%of homeowners
Restoration and Redesign, LLC
5.0(
3
)

Serving Westchase, FL and surrounding areas

"They previously renovated 2 of my bathrooms, he takes pride of his work, and he was very considerate and I was very pleased with his work. He had done quite a number of things in my house, he has done it good, that's why I keep calling him for more additional works, in fact he is doing another project for me today. His pricing was reasonable."
Recommended by100%of homeowners
...
Showing 1-10 of 81
Basement Remodel questions, answered by experts

Yes, most general contractors require an initial down payment. A reasonable deposit is typically between 10% and 25% of the total project cost, although this can vary by project size and location. This upfront payment helps the contractor cover initial costs like materials, permits, licensing, and hiring subcontractors. The remaining balance is usually billed according to a schedule outlined in your contract, often tied to project milestones or completion dates. Be cautious of contractors who ask for a large deposit of 50% or more, as this could be a red flag for a scam.

You should plan on waiting at least a year and ideally two to three years after construction before finishing your basement. This will give the foundation time to settle in response to the weight of your home and the expansion of the surrounding soil. You can then repair your foundation and seal any cracks as needed before finishing it to reduce your risk of future leaks or other issues.

Adding a bathroom to your basement can increase your home value since homes with multiple bathrooms sell for more. The return on investment (ROI) for a basement bathroom is 50% to 75%. The actual return varies with your home and location. Adding a half bath to your home increases the value by 2.9% while finishing a basement increases the home value by 6.6%.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

The Westchase, FL homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.