Top-rated basement remodelers.

Get matched with top basement remodelers in Wesley Chapel, FL

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Wesley Chapel, FL?

Select your specific project to find the pro for you.

Find Basement remodelers in Wesley Chapel

Avatar for CER Design Build
CER Design Build
4.8(
21
)
Basement - Remodel

Serving Wesley Chapel, FL and surrounding areas

In business since 2000

Free estimates

Emergency services offered

""I am very pleased with the work of Cer Custom Renovations. The guys did a quality job on Remodeling for my project. All work was completed on time without delays or shortcomings. I will recommend the company to my friends and business colleagues. Thank you for the good work!""
Custom cabinets
Chefs kitchen
Master bath
Theater
Additional Photos

+22

Recommended by95%of homeowners
Avatar for Tampa Bay Marble and Design
Tampa Bay Marble and Design
4.7(
174
)
Basement - Remodel

Serving Wesley Chapel, FL and surrounding areas

In business since 2000

Free estimates

Credit card accepted

"Remodeling our kitchen was an interesting experience and we were very happy with the result. Since first day Jess was very helpful and transparent with the information we needed and was always available for any question we might had. He and his team did everything to make the experience as smooth and efficient as possible. It only took 2 weeks to complete the remodeling and they were very professional and always on time with the schedule."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+28

Recommended by94%of homeowners
Sequoia Builders Group Inc
4.6(
36
)
Basement - Remodel

Serving Wesley Chapel, FL and surrounding areas

In business since 1994

Free estimates

Emergency services offered

"They remodeled my kitchen. They finished the work in about a week. They were very clean. They respected my house. They are always putting drop cloths down and cleaning up behind themselves. Matt was very receptive to changes and ideas that I had which helped the job go better. I have used them before."
Recommended by100%of homeowners
...
Showing 1-10 of 61
Basement Remodel questions, answered by experts

Kitchens and bathrooms are typically the most expensive rooms to renovate. The high cost is due to several factors, including expensive appliances like ranges, hoods, and refrigerators, as well as costly fixtures. The 'bones' of the room, such as electrical and plumbing, are also expensive to move or replace. Because of the vast amount of prep work, finishing, and specialized labor involved in a relatively small footprint, these projects can cost double or more than a living space remodel. Even when trying to renovate on a budget, kitchens and bathrooms will likely carry a hefty price tag.

Roughing in and connecting utilities are the hardest parts of finishing a basement, and they’re the parts we typically don’t recommend doing as a DIY project. Unfortunately, your finishing timeline can be extended by weeks while you wait for contractors and inspectors to install electrical wiring, plumbing lines, and heating/cooling equipment and carry out inspections.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Efficient appliance positioning, optimizing existing plumbing, and sourcing energy-efficient materials reduce financial impact and increase sustainability.

Egress windows or doors are required in finished basements to meet safety and building codes. If your basement is unfinished and used as a storage space, egress windows are not required, but anything considered a habitable space must have an additional point of egress in addition to the stairs.

The Wesley Chapel, FL homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.