Top-rated basement remodelers.

Get matched with top basement remodelers in Tombstone, AZ

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Tombstone, AZ?

Select your specific project to find the pro for you.

Find Basement remodelers in Tombstone

Avatar for Shepherd Contracting
Shepherd Contracting
5.0(
15
)
Basement - Remodel

Serving Tombstone, AZ and surrounding areas

Approved

In business since 2019

Free estimates

Credit card accepted

"Shepherd Contracting goes above and beyond- Thomas and his team were polite, efficient, and did outstanding work on a home remodel for a design client. My client and I were thrilled with the quality and attention to detail. An added bonus-they finished on time and within the budget!"
My jobs
My jobs
My jobs
My jobs
My jobs

+40

5 neighbors recently requested a quote
Avatar for Valetta Contract Building Remodeling & Repair LLC
Valetta Contract Building Remodeling & Repair LLC
5.0(
5
)
Basement - Remodel

Serving Tombstone, AZ and surrounding areas

Approved

In business since 2023

Free estimates

Warranties offered

"I found Valetta on yelp and George came out to give me an estimate for a deck when wanted around our swim spa. I was hesitant after learning George only had his general contracting license for a short time, however, after meeting him, I was very impressed. So glad we took a chance because the results are amazing. We could not be more pleased with the look and quality of the deck. In addition, George was great to work with and put up with our last minute changes and updates. He is a true professional and cannot stress enough that he puts quality into his jobs. Hire Valetta Contract Building Remodeling and Repair. You will not be sorry!"
top view
top view
top view
Stairway
framing

+19

Response time2 days
Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Tombstone, AZ and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Double B Builders LLC
New to Angi
Basement - Remodel

Serving Tombstone, AZ and surrounding areas

In business since 1998

Double B Builders specializes in renovations, remodels and construction. Dan Boveington has been building in the Tucson area for over 32 years.\n\nWe maximize value! Double B Builders provides premier quality and service and for less than our competitors. Double B Builders specializes in remodels, additions, and renovations. Our Remodel Management Specialists have an average of over 20 years construction and remodel experience and are led by Daniel Boveington, Founder, with over 32 years in the construction industry.

Showing 1-10 of 14
Basement Remodel questions, answered by experts

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Although it’s not required, air ventilation in a finished basement can help improve the air quality, prevent moisture and mold issues, keep musty odors away, and also maintain the air quality throughout the rest of your home. Proper ventilation will help maintain the value of your investment in finishing your basement. Try basement ventilation methods like installing vents or a dehumidifier for best results.

Any bowing in a basement wall indicates a problem that needs to be addressed by a professional. If your basement wall bows more than 1 inch, it's time for an inspection. Generally, a wall can bow up to 30% of its thickness (around 2.5 inches for an 8-inch-thick wall) before it becomes an urgent situation. Bowing of 2 to 4 inches is more straightforward to fix than bowing of more than 4 inches, which will require significant repairs. If the bowing is more than 6 inches, the wall will likely need to be replaced. The sooner you address the problem, the easier and less expensive the repair will be.

Yes, you can add a bathroom to an unfinished basement, but you’ll want to take proper precautions if doing so. As with any bathroom addition, you’ll need to make sure that it’s approved by local building authorities first. With unfinished basements, you especially need to keep an eye on proper ventilation practices.

If you don’t have a crawl space but have a partial basement you want to make deeper, you can expect to spend a little less—between $40,000 and $90,000 on average. However, if you’re not adding new finished square footage, you won’t see much in the way of ROI.

The Tombstone, AZ homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.