Top-rated basement remodelers.

Get matched with top basement remodelers in Elfrida, AZ

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Elfrida, AZ?

Select your specific project to find the pro for you.

Find Basement remodelers in Elfrida

Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Elfrida, AZ and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Double B Builders LLC
New to Angi
Basement - Remodel

Serving Elfrida, AZ and surrounding areas

In business since 1998

Double B Builders specializes in renovations, remodels and construction. Dan Boveington has been building in the Tucson area for over 32 years.\n\nWe maximize value! Double B Builders provides premier quality and service and for less than our competitors. Double B Builders specializes in remodels, additions, and renovations. Our Remodel Management Specialists have an average of over 20 years construction and remodel experience and are led by Daniel Boveington, Founder, with over 32 years in the construction industry.

One Call For All LLC
New to Angi
Basement - Remodel

Serving Elfrida, AZ and surrounding areas

In business since 2021

Free estimates

Credit card accepted

One Call For All LLC, is the premier answer to your home improvement needs. We are proud to be locally owned and operated. We offer you prompt response to your needs and ensure that you will be excited with your competed project. We bring over 10 years of professional experience to every project. Let us help you to make your house the place you want to come home to. Our ultimate goal is always your satisfaction. Call us today for your free estimate.

Basement Remodel questions, answered by experts

A finished basement does not always count as square footage, as this varies by state regulations. In areas that allow below-grade spaces to be included in a home's official square footage, the basement must typically meet certain conditions. These conditions often include having a functional egress and being a livable space with flooring, finished walls, and temperature control. To be certain, contact your local assessor to confirm your area's specific policies regarding basement square footage.

Adding a bathroom to your basement can increase your home value since homes with multiple bathrooms sell for more. The return on investment (ROI) for a basement bathroom is 50% to 75%. The actual return varies with your home and location. Adding a half bath to your home increases the value by 2.9% while finishing a basement increases the home value by 6.6%.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Anything having to do with the structure of your home, such as raising the ceiling, is usually the most expensive part of finishing a basement. Another project component that could be a surprisingly high expense is adding an exterior entrance. 

The cost of a walkout basement can be anywhere from $5,000 to $35,000.

While bathrooms and kitchens are nearly equal in terms of renovation difficulty, kitchens are the most challenging. Kitchen design, layout, electrical, and plumbing needs all depend on each other for the success of the entire project, and mistakes early in the project can cause trouble later on.

The Elfrida, AZ homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.