Top-rated basement remodelers.

Get matched with top basement remodelers in Bisbee, AZ

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Bisbee, AZ?

Select your specific project to find the pro for you.

Find Basement remodelers in Bisbee

Avatar for Homemade Design
Homemade Design
3.7(
322
)

Serving Bisbee, AZ and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Double B Builders LLC
New to Angi

Serving Bisbee, AZ and surrounding areas

In business since 1998

Double B Builders specializes in renovations, remodels and construction. Dan Boveington has been building in the Tucson area for over 32 years.\n\nWe maximize value! Double B Builders provides premier quality and service and for less than our competitors. Double B Builders specializes in remodels, additions, and renovations. Our Remodel Management Specialists have an average of over 20 years construction and remodel experience and are led by Daniel Boveington, Founder, with over 32 years in the construction industry.

One Call For All LLC
New to Angi

Serving Bisbee, AZ and surrounding areas

In business since 2021

Free estimates

Credit card accepted

One Call For All LLC, is the premier answer to your home improvement needs. We are proud to be locally owned and operated. We offer you prompt response to your needs and ensure that you will be excited with your competed project. We bring over 10 years of professional experience to every project. Let us help you to make your house the place you want to come home to. Our ultimate goal is always your satisfaction. Call us today for your free estimate.

Thunder Ridge Industries, Inc.
New to Angi

Serving Bisbee, AZ and surrounding areas

In business since 2002

Thunder Ridge Industries, Inc., Is a licensed general contractor for both residential and small commercial business. We build custom homes, Monolithic Homes, additions, remodels, garages, decks, sunrooms, and all remodels. We build the future now with superior workmanship and materials, the newest technology with oldworld craftsmanship to last and last. Please see our website at www.domehomedepot.com

Showing 1-10 of 11
Basement Remodel questions, answered by experts

The cost of finishing a basement is about $18,400 on average. As you can see, the framing portion of this project costs less, because you’re essentially just dealing with laying the foundation for a finished basement. The finishing portion of the project involves a lot more intricate work and design, as well as high-end materials.

Rebar is an essential part of reinforcing a basement floor, as not having it can impact its structural integrity. It helps absorb the tension factors that contribute to cracks in your floor and strengthens its load-bearing capabilities by evenly distributing the weight. Not including rebar could lead to an unstable floor, so don’t skip it!

When choosing materials for finishing basement walls, consider factors such as moisture resistance, durability, and fire resistance. Opt for materials specifically designed for basement environments, like moisture-resistant drywall or cement board. Insulation with vapor barriers can help regulate temperature and prevent condensation. Consider using mold-resistant paints or coatings. 

Research and consult with experts to select materials that are suitable for your specific basement conditions and intended use. Prioritize quality and compatibility to achieve long-lasting and aesthetically pleasing results.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

If you have the woodworking experience to build a bar from scratch and you have the time, DIYing the work is a no-brainer and can save a few thousand dollars. However, if you’re looking to include a sink, additional lighting fixtures, or high-end bar tops and cabinets, it’s usually a better idea to call in a pro. It will cost more, but the finished product will likely be worth it.

The Bisbee, AZ homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.