Top-rated backsplash installation pros.

Get matched with top backsplash installation pros in Shorter, AL

Enter your zip and get matched with up to 5 pros

Need a pro for your backsplash installation project in Shorter, AL?

Select your specific project to find the pro for you.

TRUSTED BY SHORTER, AL HOMEOWNERS

  • Average homeowner rating star icon4.3
    Average homeowner rating
  • Verified reviews icon98
    Verified backsplash installation services reviews

Find Backsplash installation pros in Shorter

Wilber Flooring
5.0(
1
)

Serving Shorter, AL and surrounding areas

Approved

In business since 2015

Free estimates

Offers commercial services

Wilber Floors is committed to excellence every aspect of our business. We uphold a standard of integrity bound by fairness, honesty and responsibility in all of our jobs. We are a locally owned and operated business with more than 5 years of experience serving AL and surrounding areas. There is no job too big, or too small for our team. Call today and let us put our experience to work for you!\n

Recommended by100%of homeowners
JAC Tile
New to Angi

Serving Shorter, AL and surrounding areas

Approved

In business since 1993

Free estimates

Offers commercial services

We take great pride in our experience, expertise, quality, and customer service that we provide to meet the consumer's needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on service, safety, and quality, regardless of how large or small the job.\n\n

Response time1 hour
Complete Home Repair
4.9(
38
)

Serving Shorter, AL and surrounding areas

In business since 1995

Free estimates

"Mr Webb's work is very good and my wife and I are very pleased with his work, cost and work time.  We have used Complete Home Repair for several small repairs this year and have always been very pleased.  He shows up when he says he will and gets the job done.  So when we planned this latest project, we did not hesitate to call them and in fact did not even think about any one else.
We have in mind some other projects around here and will certainly call them first.  We found Complete Home Repair on Angie's list and have even found others for HVAC etc.
"
luxury
warmth
durable
Recommended by93%of homeowners
Avatar for Dream Baths Of Alabama
Dream Baths Of Alabama
4.1(
74
)

Serving Shorter, AL and surrounding areas

In business since 1992

Free estimates

"Great.  I had this work done just over a year ago (should have submitted review sooner).
Estimate.  Charlie examined bathroom, had plenty of samples of options to review, and provided firm fixed quote.  There were some material issues that I'll note below.  At no time did the final cost change.
Timeline.  Installation began about a month or so after I accepted the quote and paid half down for material.  I think Charile was ready in about 2 weeks, but I had business travel.  Working together to find a common acceptable period for installation was easy.
Installation.  The first day Charlie showed up with a crew of 4 to take care of the electrical work (did have another ceiling fan installed) and demolition.  Following that, there were 2 full time workers on site.  They worked long hours, well over 8 hour days.  Normall, the job would have taken about a week.  I'll give more detail on the one issue below that drew the task out longer.  The guys were good about taking care not to impact the rest of the house (carpet, etc.).  After install, they did a good job cleaning up.
During the install, there were a few minor options ... how to frame the door, orientation of tile, the color of the tile, etc.  The crew provided options and good advice (I'm no kind of interior decorator).  The part of the service was excellent.
Quality.  I have done basic carpentry and electrical work.  I believe the quality of the work to be good to excellent, both what you see and what was done "behind the dry wall."  The work that you can see is excellent.
Material.  I was a little worried about the material used for the walls as opposed to tile.  I'm pleased to say I'm more than happy with the "acrylic" (I think that's correct) walls as well as base and door.
Only issue.  The base received was not the correct one.  The second base received had a quality issue.  They guys pointed this out to me.  I'm sure it cost them money out of their pocket / profit to spend the extra time on site.  My take away from this was the guys were MY quality advocates and did what was necessary to ensure the highest quality product was used and the job was done right the first time!  Things happen.  The question is how well does your contractor support you.  While I wasn't crazy about the delay (about 3 days, not major for me).  I was thrilled the issue was immediately brought to my attention and resolved even though it took extra effort on their part.
Overall job outcome.  I feel what was quoted was provided.  Very satisfied.
1 year review ... I remain satisfied.  I have had zero issues.  Other than the glass doors (which are famous for requiring cleaning when used for bath doors - this was noted before installation).  Is the biggest maintenance job.  Caring for the bath itself has required average to minimal effort.
Give Dream Bath / Charlie a call before you have your bathroom remodeled!
"
Dream Baths

+15

Recommended by82%of homeowners
Avatar for Top Tier Property Group
Top Tier Property Group
4.8(
17
)

Serving Shorter, AL and surrounding areas

In business since 2021

Free estimates

Warranties offered

"EXCELLENT SERVICE! As an ARMY Veteran I appreciate effective and efficient work. I recently had this company replace my roof, repair water damaged walls, repair/ replace plumbing, new flooring, new shower installation and drywall work. Their expertise allowed them to find an open pipe leaking water in my walls! Open communication about timelines and a basic breakdown of exactly what work is performed makes them easy to work with. Here’s why I recommend this company. 1. Price- Best Price when compared 2. Speed- They started the next day / worked quickly. 3. Professionalism- return customer for this reason. 4. Quality of Work- I’ve had so much done by Top Tier Property Group because of the great quality of their work. Try them out and you won’t be disappointed."
Remodeling - Kitchen & Bathroom Project
Remodeling - Kitchen & Bathroom Project
Additional Photos
Additional Photos
Additional Photos

+26

Response time2 days
Recommended by94%of homeowners
...
Showing 1-10 of 77
Backsplash Installation questions, answered by experts

One major drawback of a concrete tile roof is that the material is heavier than most other roofing materials, so there’s a good chance you’ll need structural reinforcements for your home before you can install the roofing material. Concrete tile roofs are also twice as expensive as asphalt shingle roofs, so even though they last much longer, you’ll see higher up-front costs and lower overall value from concrete roof tiles.

The best trowel for penny tile is a 3/16-inch-by-5/32-inch V-notch trowel. Because of the small size of the penny tile, you want a trowel with small notches that can lay a thin layer of mortar on the surface you’re tiling. If the notches are too wide, you risk applying too thick of a layer of mortar, and it can squeeze out between the penny tiles.

The lifespan of tile flooring can vary significantly based on the material and maintenance. Generally, tile flooring can last anywhere from 10 to 30 years, but high-quality, well-maintained ceramic tile can last 75 to 100 years. To achieve a longer lifespan, you should clean the tiles and grout regularly, reseal the grout annually, keep the floor dry, and avoid placing extremely heavy items on it to prevent cracking. Choosing a high-quality tile (Grade 1) will also contribute to its longevity.

It’s best to start with tiling the shower floor before moving on to the walls for the most visually-pleasing results. When taking on any tiling project, you’ll want the wall tiles to “sit” neatly on the floor tiles rather than overlapping them. Finishing your floor tiles first will allow you to place your wall tiles without any gaps, holes, or awkward intersections.

The process takes two to four days, depending on the size of the area and your experience level. The first day involves assessing and prepping the existing tile, while the second day is for laying the new tile. This may take longer in complex areas. After letting the adhesive dry for 24 hours, grouting and sealing can be completed on day three. For larger projects or intricate tile patterns, expect the timeline to stretch a bit longer. Also, proper drying time between steps is essential for long-lasting results, which extends the project’s time.

The Shorter, AL homeowners’ guide to backsplash installation services

From average costs to expert advice, get all the answers you need to get your job done.