Top-rated backsplash installation pros.

Get matched with top backsplash installation pros in Hope Hull, AL

Enter your zip and get matched with up to 5 pros

Need a pro for your backsplash installation project in Hope Hull, AL?

Select your specific project to find the pro for you.

TRUSTED BY HOPE HULL, AL HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon97
    Verified backsplash installation services reviews

Find Backsplash installation pros in Hope Hull

JAC Tile
New to Angi
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For BusinessTile: Natural Stone (Granite, Marble, Slate, Quartz, etc) - Install+1 more

Serving Hope Hull, AL and surrounding areas

Approved

In business since 1993

Free estimates

Offers commercial services

We take great pride in our experience, expertise, quality, and customer service that we provide to meet the consumer's needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on service, safety, and quality, regardless of how large or small the job.\n\n

Response time1 hour
Avatar for Dream Baths Of Alabama
Dream Baths Of Alabama
4.1(
74
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For Business

Serving Hope Hull, AL and surrounding areas

In business since 1992

Free estimates

"Great.  I had this work done just over a year ago (should have submitted review sooner).
Estimate.  Charlie examined bathroom, had plenty of samples of options to review, and provided firm fixed quote.  There were some material issues that I'll note below.  At no time did the final cost change.
Timeline.  Installation began about a month or so after I accepted the quote and paid half down for material.  I think Charile was ready in about 2 weeks, but I had business travel.  Working together to find a common acceptable period for installation was easy.
Installation.  The first day Charlie showed up with a crew of 4 to take care of the electrical work (did have another ceiling fan installed) and demolition.  Following that, there were 2 full time workers on site.  They worked long hours, well over 8 hour days.  Normall, the job would have taken about a week.  I'll give more detail on the one issue below that drew the task out longer.  The guys were good about taking care not to impact the rest of the house (carpet, etc.).  After install, they did a good job cleaning up.
During the install, there were a few minor options ... how to frame the door, orientation of tile, the color of the tile, etc.  The crew provided options and good advice (I'm no kind of interior decorator).  The part of the service was excellent.
Quality.  I have done basic carpentry and electrical work.  I believe the quality of the work to be good to excellent, both what you see and what was done "behind the dry wall."  The work that you can see is excellent.
Material.  I was a little worried about the material used for the walls as opposed to tile.  I'm pleased to say I'm more than happy with the "acrylic" (I think that's correct) walls as well as base and door.
Only issue.  The base received was not the correct one.  The second base received had a quality issue.  They guys pointed this out to me.  I'm sure it cost them money out of their pocket / profit to spend the extra time on site.  My take away from this was the guys were MY quality advocates and did what was necessary to ensure the highest quality product was used and the job was done right the first time!  Things happen.  The question is how well does your contractor support you.  While I wasn't crazy about the delay (about 3 days, not major for me).  I was thrilled the issue was immediately brought to my attention and resolved even though it took extra effort on their part.
Overall job outcome.  I feel what was quoted was provided.  Very satisfied.
1 year review ... I remain satisfied.  I have had zero issues.  Other than the glass doors (which are famous for requiring cleaning when used for bath doors - this was noted before installation).  Is the biggest maintenance job.  Caring for the bath itself has required average to minimal effort.
Give Dream Bath / Charlie a call before you have your bathroom remodeled!
"
Dream Baths

+15

Recommended by82%of homeowners
Avatar for Top Tier Property Group
Top Tier Property Group
4.8(
17
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For Business

Serving Hope Hull, AL and surrounding areas

In business since 2021

Free estimates

Warranties offered

"EXCELLENT SERVICE! As an ARMY Veteran I appreciate effective and efficient work. I recently had this company replace my roof, repair water damaged walls, repair/ replace plumbing, new flooring, new shower installation and drywall work. Their expertise allowed them to find an open pipe leaking water in my walls! Open communication about timelines and a basic breakdown of exactly what work is performed makes them easy to work with. Here’s why I recommend this company. 1. Price- Best Price when compared 2. Speed- They started the next day / worked quickly. 3. Professionalism- return customer for this reason. 4. Quality of Work- I’ve had so much done by Top Tier Property Group because of the great quality of their work. Try them out and you won’t be disappointed."
Remodeling - Kitchen & Bathroom Project
Remodeling - Kitchen & Bathroom Project
Additional Photos
Additional Photos
Additional Photos

+26

Response time2 days
Recommended by94%of homeowners
...
Showing 1-10 of 91
Backsplash Installation questions, answered by experts

Technically, you can start tiling in a corner and work your way out. However, it's not traditionally how tiling is done. Instead, work from the bottom middle of the wall. Tile out the entire row with whole tiles before moving on to the next row. Once you finish installing all of the whole tiles, then you focus on tiling the corners.

Yes, even if you’re being careful, removing tile can damage your drywall to some degree. However, you can minimize the damage done to it by eliminating a majority of the grout and taking your time prying each tile off. Also, it's worth noting that you might have more drywall damages to deal with if your tile is set into the mortar.

The choice of whether to tile or use an acrylic tub surround is up to you and can be based on a number of factors, including aesthetics, cost, waterproofing, ease of cleaning, and maintenance.

Tile is a beautiful, classic bathtub surround choice; while tile installation cost is higher, it’s customizable and offers visual appeal. Tile is also harder to clean and presents waterproofing problems because of grout lines. Acrylic surrounds can be more affordable, don’t require much maintenance, and are easier to clean. However, they aren’t usually as visually appealing and may need to be replaced if they become damaged.

It’s important to leave a gap in the corner when tiling to allow room for tile expansion. Leaving between one eighth of an inch to one tenth of an inch is enough space. 

Yes, it would be best if you waterproofed your shower walls before tiling. The cement backing board behind the tile is not waterproof; it’s only water-resistant. On top of your tile backing board, be sure to use a waterproof shower membrane before you start installing your shower tiles.

The Hope Hull, AL homeowners’ guide to backsplash installation services

From average costs to expert advice, get all the answers you need to get your job done.