Top-rated backsplash installation pros.

Get matched with top backsplash installation pros in Dadeville, AL

Enter your zip and get matched with up to 5 pros

Need a pro for your backsplash installation project in Dadeville, AL?

Select your specific project to find the pro for you.

TRUSTED BY DADEVILLE, AL HOMEOWNERS

  • Average homeowner rating star icon4.3
    Average homeowner rating
  • Verified reviews icon30
    Verified backsplash installation services reviews

Find Backsplash installation pros in Dadeville

Avatar for BCS Custom Kitchens and Baths
BCS Custom Kitchens and Baths
4.2(
5
)

Serving Dadeville, AL and surrounding areas

Approved

In business since 1980

Free estimates

Warranties offered

"Floyd Baker, the owner, is involved in every aspect of the job. He has experience and knowledge in all facets of the trades. Whenever a glitch shows up, which is often the case, he is quick to offer options and solutions. He not only did the tile work, but installed laminate flooring, new cabinet hardware, painting, built a coffee station in the kitchen, etc. Communication was flawless. I would definitely use him again."
Response time4 hrs
Response rate100%
8 neighbors recently requested a quote
Wilber Flooring
5.0(
1
)

Serving Dadeville, AL and surrounding areas

Approved

In business since 2015

Free estimates

Offers commercial services

Wilber Floors is committed to excellence every aspect of our business. We uphold a standard of integrity bound by fairness, honesty and responsibility in all of our jobs. We are a locally owned and operated business with more than 5 years of experience serving AL and surrounding areas. There is no job too big, or too small for our team. Call today and let us put our experience to work for you!\n

Recommended by100%of homeowners
Josh Bishop Construction
New to Angi

Serving Dadeville, AL and surrounding areas

Approved

In business since 2016

Free estimates

Credit card accepted

We are committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.

Response time3 days
Complete Home Repair
4.9(
38
)

Serving Dadeville, AL and surrounding areas

In business since 1995

Free estimates

"Mr Webb's work is very good and my wife and I are very pleased with his work, cost and work time.  We have used Complete Home Repair for several small repairs this year and have always been very pleased.  He shows up when he says he will and gets the job done.  So when we planned this latest project, we did not hesitate to call them and in fact did not even think about any one else.
We have in mind some other projects around here and will certainly call them first.  We found Complete Home Repair on Angie's list and have even found others for HVAC etc.
"
luxury
warmth
durable
Recommended by93%of homeowners
Avatar for Alabama Construction Pros, LLC
Alabama Construction Pros, LLC
5.0(
12
)

Serving Dadeville, AL and surrounding areas

Free estimates

Credit card accepted

"James is a very capable construction person and helped me with several projects the main being tiling the bathroom shower and bathroom floor. He does outstanding work and a very pleasant young man."
Master Bathroom Remodel
Master Bathroom Remodel
Master Bathroom Remodel
Master Bathroom Remodel
Master Bathroom Remodel

+73

Recommended by100%of homeowners
Avatar for Dream Baths Of Alabama
Dream Baths Of Alabama
4.1(
74
)

Serving Dadeville, AL and surrounding areas

In business since 1992

Free estimates

"Great.  I had this work done just over a year ago (should have submitted review sooner).
Estimate.  Charlie examined bathroom, had plenty of samples of options to review, and provided firm fixed quote.  There were some material issues that I'll note below.  At no time did the final cost change.
Timeline.  Installation began about a month or so after I accepted the quote and paid half down for material.  I think Charile was ready in about 2 weeks, but I had business travel.  Working together to find a common acceptable period for installation was easy.
Installation.  The first day Charlie showed up with a crew of 4 to take care of the electrical work (did have another ceiling fan installed) and demolition.  Following that, there were 2 full time workers on site.  They worked long hours, well over 8 hour days.  Normall, the job would have taken about a week.  I'll give more detail on the one issue below that drew the task out longer.  The guys were good about taking care not to impact the rest of the house (carpet, etc.).  After install, they did a good job cleaning up.
During the install, there were a few minor options ... how to frame the door, orientation of tile, the color of the tile, etc.  The crew provided options and good advice (I'm no kind of interior decorator).  The part of the service was excellent.
Quality.  I have done basic carpentry and electrical work.  I believe the quality of the work to be good to excellent, both what you see and what was done "behind the dry wall."  The work that you can see is excellent.
Material.  I was a little worried about the material used for the walls as opposed to tile.  I'm pleased to say I'm more than happy with the "acrylic" (I think that's correct) walls as well as base and door.
Only issue.  The base received was not the correct one.  The second base received had a quality issue.  They guys pointed this out to me.  I'm sure it cost them money out of their pocket / profit to spend the extra time on site.  My take away from this was the guys were MY quality advocates and did what was necessary to ensure the highest quality product was used and the job was done right the first time!  Things happen.  The question is how well does your contractor support you.  While I wasn't crazy about the delay (about 3 days, not major for me).  I was thrilled the issue was immediately brought to my attention and resolved even though it took extra effort on their part.
Overall job outcome.  I feel what was quoted was provided.  Very satisfied.
1 year review ... I remain satisfied.  I have had zero issues.  Other than the glass doors (which are famous for requiring cleaning when used for bath doors - this was noted before installation).  Is the biggest maintenance job.  Caring for the bath itself has required average to minimal effort.
Give Dream Bath / Charlie a call before you have your bathroom remodeled!
"
Dream Baths

+15

Recommended by82%of homeowners
...
Showing 1-10 of 67
Backsplash Installation questions, answered by experts

The rule tells you how to cut tile to install it in a corner. The 3/4/5 rule recommends that you should have 3 feet across on one straight line, four feet on the other perpendicular line, and 5 feet of length from the end of one of the lines to the other. You’re making a right triangle with the tile, and the hypotenuse (the line across from where the 3-foot lie and 4-foot line meet) should be 5 feet long.

No, painting shower tile doesn’t last and is better reserved as a temporary solution to refreshing the look of old tiles. Shower tile paint may last around one to five years, depending on how well you prep the surface before painting, the type of paint you use, the type of tile in your shower, and how often you use the shower.

You can lay tile directly on a plywood countertop, but if it’s a high-traffic surface in a kitchen, it’s better to add a moisture-resistant base. Plywood is susceptible to moisture, so if dampness seeps through from the surface around the sink or where you prep food, it can cause the plywood to warp, leading to grout damage, cracked tiles, or mold growth under the surface. 

When working on your bathroom floor tiling, you should always tile the floor first and then refit the toilet afterward. This has both practical and visual advantages—the tile will have a better seal, and the installation will look cleaner.

On the other hand, when you try to cut the tiles to fit around the toilet, you’re putting yourself at a disadvantage. It’s a lot more work, it’s hard to be precise, and mistakes or miscalculations can lead to future moisture damage to the tiling, grout, and subfloor.

It’s easiest to start from an edge as it gives you a straight line. A problem may arise if your edge doesn’t line up perfectly, in which case it’s best to start from the center. Some think that starting tile from the center adds a focal point in the center of the hearth. 

The Dadeville, AL homeowners’ guide to backsplash installation services

From average costs to expert advice, get all the answers you need to get your job done.