Top-rated backsplash installation pros.

Get matched with top backsplash installation pros in Titus, AL

Enter your zip and get matched with up to 5 pros

Need a pro for your backsplash installation project in Titus, AL?

Select your specific project to find the pro for you.

TRUSTED BY TITUS, AL HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon86
    Verified backsplash installation services reviews

Find Backsplash installation pros in Titus

Wilber Flooring
5.0(
1
)

Serving Titus, AL and surrounding areas

Approved

In business since 2015

Free estimates

Offers commercial services

Wilber Floors is committed to excellence every aspect of our business. We uphold a standard of integrity bound by fairness, honesty and responsibility in all of our jobs. We are a locally owned and operated business with more than 5 years of experience serving AL and surrounding areas. There is no job too big, or too small for our team. Call today and let us put our experience to work for you!\n

Recommended by100%of homeowners
Avatar for Alabama Construction Pros, LLC
Alabama Construction Pros, LLC
5.0(
12
)

Serving Titus, AL and surrounding areas

Free estimates

Credit card accepted

"James is a very capable construction person and helped me with several projects the main being tiling the bathroom shower and bathroom floor. He does outstanding work and a very pleasant young man."
Master Bathroom Remodel
Master Bathroom Remodel
Master Bathroom Remodel
Master Bathroom Remodel
Master Bathroom Remodel

+73

Recommended by100%of homeowners
Avatar for Dream Baths Of Alabama
Dream Baths Of Alabama
4.1(
74
)

Serving Titus, AL and surrounding areas

In business since 1992

Free estimates

"Great.  I had this work done just over a year ago (should have submitted review sooner).
Estimate.  Charlie examined bathroom, had plenty of samples of options to review, and provided firm fixed quote.  There were some material issues that I'll note below.  At no time did the final cost change.
Timeline.  Installation began about a month or so after I accepted the quote and paid half down for material.  I think Charile was ready in about 2 weeks, but I had business travel.  Working together to find a common acceptable period for installation was easy.
Installation.  The first day Charlie showed up with a crew of 4 to take care of the electrical work (did have another ceiling fan installed) and demolition.  Following that, there were 2 full time workers on site.  They worked long hours, well over 8 hour days.  Normall, the job would have taken about a week.  I'll give more detail on the one issue below that drew the task out longer.  The guys were good about taking care not to impact the rest of the house (carpet, etc.).  After install, they did a good job cleaning up.
During the install, there were a few minor options ... how to frame the door, orientation of tile, the color of the tile, etc.  The crew provided options and good advice (I'm no kind of interior decorator).  The part of the service was excellent.
Quality.  I have done basic carpentry and electrical work.  I believe the quality of the work to be good to excellent, both what you see and what was done "behind the dry wall."  The work that you can see is excellent.
Material.  I was a little worried about the material used for the walls as opposed to tile.  I'm pleased to say I'm more than happy with the "acrylic" (I think that's correct) walls as well as base and door.
Only issue.  The base received was not the correct one.  The second base received had a quality issue.  They guys pointed this out to me.  I'm sure it cost them money out of their pocket / profit to spend the extra time on site.  My take away from this was the guys were MY quality advocates and did what was necessary to ensure the highest quality product was used and the job was done right the first time!  Things happen.  The question is how well does your contractor support you.  While I wasn't crazy about the delay (about 3 days, not major for me).  I was thrilled the issue was immediately brought to my attention and resolved even though it took extra effort on their part.
Overall job outcome.  I feel what was quoted was provided.  Very satisfied.
1 year review ... I remain satisfied.  I have had zero issues.  Other than the glass doors (which are famous for requiring cleaning when used for bath doors - this was noted before installation).  Is the biggest maintenance job.  Caring for the bath itself has required average to minimal effort.
Give Dream Bath / Charlie a call before you have your bathroom remodeled!
"
Dream Baths

+15

Recommended by82%of homeowners
Avatar for Top Tier Property Group
Top Tier Property Group
4.8(
17
)

Serving Titus, AL and surrounding areas

In business since 2021

Free estimates

Warranties offered

"EXCELLENT SERVICE! As an ARMY Veteran I appreciate effective and efficient work. I recently had this company replace my roof, repair water damaged walls, repair/ replace plumbing, new flooring, new shower installation and drywall work. Their expertise allowed them to find an open pipe leaking water in my walls! Open communication about timelines and a basic breakdown of exactly what work is performed makes them easy to work with. Here’s why I recommend this company. 1. Price- Best Price when compared 2. Speed- They started the next day / worked quickly. 3. Professionalism- return customer for this reason. 4. Quality of Work- I’ve had so much done by Top Tier Property Group because of the great quality of their work. Try them out and you won’t be disappointed."
Remodeling - Kitchen & Bathroom Project
Remodeling - Kitchen & Bathroom Project
Additional Photos
Additional Photos
Additional Photos

+26

Response time2 days
Recommended by94%of homeowners
...
Showing 1-10 of 75
Backsplash Installation questions, answered by experts

When working on your bathroom floor tiling, you should always tile the floor first and then refit the toilet afterward. This has both practical and visual advantages—the tile will have a better seal, and the installation will look cleaner.

On the other hand, when you try to cut the tiles to fit around the toilet, you’re putting yourself at a disadvantage. It’s a lot more work, it’s hard to be precise, and mistakes or miscalculations can lead to future moisture damage to the tiling, grout, and subfloor.

Ideally, you should remove tile before installing hardwood floors, but there are good reasons not to. Removing stubborn tile can be a labor-intensive job that adds days to the project. The subfloor beneath the tiles could also be damaged during the process, meaning you’d have to repair the subfloor before installing the new hardwood floor. 

If you’re out of spacers for your tile installation, you can use pennies. Each time you place a tile, stick the pennies around the edges (on the sides and the corners). Like working with spacers, you’ll want the same amount of space around each tile before they set.

The number of boxes of tile you need depends entirely on the amount of tile in each box or case. Different manufacturers package their tiles differently, and boxes contain different amounts of tile depending on the size, shape, and material. Often, the amount of area that a case will cover is listed in the product description. To calculate the number of boxes you need, take the total square feet of the space and divide it by the number of square feet the box will cover.

Yes. You can tile over tile if the old tile is in good shape, but this will also create a thicker floor. As a result, you may have to remove and readjust baseboards and other room trimmings and potentially even raise door heights to work with the higher floors. In most projects, it’s best to remove the old tile before installing a new tile floor.

The Titus, AL homeowners’ guide to backsplash installation services

From average costs to expert advice, get all the answers you need to get your job done.