Top-rated backsplash installation pros.

Get matched with top backsplash installation pros in Hurtsboro, AL

Enter your zip and get matched with up to 5 pros

Need a pro for your backsplash installation project in Hurtsboro, AL?

Select your specific project to find the pro for you.

TRUSTED BY HURTSBORO, AL HOMEOWNERS

  • Average homeowner rating star icon4.2
    Average homeowner rating
  • Verified reviews icon10
    Verified backsplash installation services reviews

Find Backsplash installation pros in Hurtsboro

Avatar for Floorworks LLC
Floorworks LLC
5.0(
8
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For Business

Serving Hurtsboro, AL and surrounding areas

In business since 2000

Free estimates

Credit card accepted

"Great from start I was helped with choice of flooring in the store I was able to compare the coloring with my furniture and it is beautiful. The workers was polite they refused my offer for breakfast got right to work I had a bed that had to be unassembled no problem completed the job in a very timely manner. Reassemble the bed ,some one checked the work then they Cleaned everything afterwards and left unused pieces with me."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+17

Recommended by100%of homeowners
Avatar for Dream Baths Of Alabama
Dream Baths Of Alabama
4.1(
74
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For Business

Serving Hurtsboro, AL and surrounding areas

In business since 1992

Free estimates

"Great.  I had this work done just over a year ago (should have submitted review sooner).
Estimate.  Charlie examined bathroom, had plenty of samples of options to review, and provided firm fixed quote.  There were some material issues that I'll note below.  At no time did the final cost change.
Timeline.  Installation began about a month or so after I accepted the quote and paid half down for material.  I think Charile was ready in about 2 weeks, but I had business travel.  Working together to find a common acceptable period for installation was easy.
Installation.  The first day Charlie showed up with a crew of 4 to take care of the electrical work (did have another ceiling fan installed) and demolition.  Following that, there were 2 full time workers on site.  They worked long hours, well over 8 hour days.  Normall, the job would have taken about a week.  I'll give more detail on the one issue below that drew the task out longer.  The guys were good about taking care not to impact the rest of the house (carpet, etc.).  After install, they did a good job cleaning up.
During the install, there were a few minor options ... how to frame the door, orientation of tile, the color of the tile, etc.  The crew provided options and good advice (I'm no kind of interior decorator).  The part of the service was excellent.
Quality.  I have done basic carpentry and electrical work.  I believe the quality of the work to be good to excellent, both what you see and what was done "behind the dry wall."  The work that you can see is excellent.
Material.  I was a little worried about the material used for the walls as opposed to tile.  I'm pleased to say I'm more than happy with the "acrylic" (I think that's correct) walls as well as base and door.
Only issue.  The base received was not the correct one.  The second base received had a quality issue.  They guys pointed this out to me.  I'm sure it cost them money out of their pocket / profit to spend the extra time on site.  My take away from this was the guys were MY quality advocates and did what was necessary to ensure the highest quality product was used and the job was done right the first time!  Things happen.  The question is how well does your contractor support you.  While I wasn't crazy about the delay (about 3 days, not major for me).  I was thrilled the issue was immediately brought to my attention and resolved even though it took extra effort on their part.
Overall job outcome.  I feel what was quoted was provided.  Very satisfied.
1 year review ... I remain satisfied.  I have had zero issues.  Other than the glass doors (which are famous for requiring cleaning when used for bath doors - this was noted before installation).  Is the biggest maintenance job.  Caring for the bath itself has required average to minimal effort.
Give Dream Bath / Charlie a call before you have your bathroom remodeled!
"
Dream Baths

+15

Recommended by82%of homeowners
...
Showing 1-10 of 73
Backsplash Installation questions, answered by experts

Terracotta tile is a broad term for clay tile that’s been fired in a kiln, and Saltillo tile is a specific type of terracotta tile produced in Saltillo, Mexico. In addition to Saltillo, terracotta tile comes in a range of other shades and styles. You’ll often find it used in buildings throughout Mexico, southern Europe, and the western United States.

The difference between floor and wall tiles is that floor tiles generally have higher strength and porosity ratings than wall tiles. Wall tiles are typically weaker and more likely to crack or become damaged under sustained pressure like high foot traffic. 

For this reason, avoid using wall tiles on floors and vice versa.

The tile spacing you should use will depend on the tile and where you’re installing it. Choosing the right tile spacers to maintain a consistent gap between your tiles is tricky. Generally, tile spacing shouldn’t be less than 2 millimeters on walls and 3 millimeters on floors because of stress relief requirements. Getting it wrong can result in uneven tiles and early repairs.

Replacing tile flooring can take a few days for a pro, but larger rooms will need more time. It takes eight to 12 hours for a tiling pro to remove old grout and tiles across 100 square feet. Then, it will take about four hours to prep the subfloor for tiles and another eight to 10 hours for a pro to install new tiles. Your tiling project may take up to a week, depending on the size of the room.

Per the International Code Council, walk-in shower floors should have a minimum slope of 1/4-inch per foot (or a 2% slope) towards the drain. The slope should be no steeper than 1/2-inch per foot (or a 4% slope). This helps safely direct water into the drain rather than all over your bathroom.

The Hurtsboro, AL homeowners’ guide to backsplash installation services

From average costs to expert advice, get all the answers you need to get your job done.