Top-rated excavation pros.

Get matched with top excavation pros in Vancouver, WA

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Vancouver, WA?

Select your specific project to find the pro for you.

TRUSTED BY VANCOUVER, WA HOMEOWNERS

  • Average homeowner rating star icon4.7
    Average homeowner rating
  • Verified reviews icon88
    Verified excavation services reviews

Find Excavation pros in Vancouver

Avatar for Dirt Road Excavation & Debris, LLC
Dirt Road Excavation & Debris, LLC
4.7(
35
)
Building Site - Preparation and ClearingExcavation - Major Grading or ReslopingLandscape - Minor Grading or Resloping+2 more

Serving Vancouver, WA and surrounding areas

Approved

Super Service Award Winner

In business since 2020

Free estimates

Emergency services offered

"I was very happy with Dirt Road Excavation & Debris. They were easy to reach very accommodating on my schedule needs, quick and efficient. I had no problems with them at all and it was a relieve to have the big junk we needed gone after doing renos gone without any hassle."
Response time11 hrs
30 neighbors recently requested a quote
Recommended by90%of homeowners
Avatar for North Woods Tree Service
North Woods Tree Service
4.9(
127
)
Building Site - Preparation and Clearing

Serving Vancouver, WA and surrounding areas

Approved

In business since 1988

Free estimates

Emergency services offered

"Darryl sent a good crew and his price was reasonable. He needs to work on communicating with his clients but otherwise we were satisfied. $600.00, original tasks $800.00, removal of leaning maple (behind shed) $350.00, "tree" cluster -$87.50, Senior Discount $ 49.88, 3% charge card surcharge $1712.38, Total"
50 Feet From Tip To Top
Almost To The Top
Another View Of The Trunk
Arrival Of Crane
Base Log Was Sectioned

+104

8 neighbors recently requested a quote
Recommended by94%of homeowners
Avatar for Valley Pacific Construction INC
Valley Pacific Construction INC
4.6(
9
)
Landscape - Minor Grading or ReslopingBuilding Site - Preparation and ClearingExcavation - Major Grading or Resloping+2 more

Serving Vancouver, WA and surrounding areas

Approved

Super Service Award Winner

In business since 1972

Credit card accepted

Offers commercial services

"Daniel was awesome to work with. He came out and provided a solid estimate in a timely fashion. We had an unexpected sprinkler line that was in the middle of our excavation area and he took care of that. He also provided the materials for a retaining wall that we hadn't initially planned for, and he added that to the project scope without issue. I will definitely reach out to Daniel if we have another project like this one."
storm
underground
tree falling
storm
detention system

+2

Response time1 day
Response rate92%
6 neighbors recently requested a quote
...
Showing 1-10 of 148
Excavating questions, answered by experts

Call 811 to locate and mark the gas lines at least three days before digging. In many areas, you can dig within 18 inches of the lines, though in some locations, the distance may be further. Check local regulations, as you may need a utility company representative onsite when digging. Document your calls to 811 and precautions taken to avoid gas lines. A homeowner can be held liable for hitting a gas line in some cases, but contacting the proper authorities and following all guidelines can offer protection.

Yes, trenchers can go through gravel. Gravel is made up of smaller, softer rocks that certain trenchers are able to cut through. Just be sure to use a rock wheel trencher or chain trencher, both of which are made to cut through rocky landscapes and gravel pathways without dulling the teeth or chain.

The time it takes to build a pool—and dig out the area—varies based on the pool size and type. A professional excavator will take between four and eight hours to dig a pool. The process will take longer if they encounter large boulders or tree roots. Keep in mind that this is a small part of the process in the long run. You will need between eight and 12 weeks to build a pool from start to finish, including the time to apply for permits.

A walk-behind trencher can cut through roots as long as they’re not too thick, making a project much easier than digging with a shovel and other hand tools. Assess your terrain and the number of trees in the surrounding area to determine if a walk-behind trencher will ease the job. Digging a trench by hand is much more time-consuming and labor-intensive. 

In the United States, a depth of 36 inches (three feet) for underground water lines is the accepted industry standard. This depth varies from location to location based on local conditions. In areas with colder winters, they may be buried deeper to prevent frozen well water pipes : This is usually at least six inches below the frost level. The International Plumbing Code calls for a minimum of 12 inches below grade.

The Vancouver, WA homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.