Top-rated excavation pros.

Get matched with top excavation pros in Tigard, OR

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Tigard, OR?

Select your specific project to find the pro for you.

TRUSTED BY TIGARD, OR HOMEOWNERS

  • Average homeowner rating star icon4.7
    Average homeowner rating
  • Verified reviews icon167
    Verified excavation services reviews

Find Excavation pros in Tigard

Avatar for Dirt Road Excavation & Debris, LLC
Dirt Road Excavation & Debris, LLC
4.7(
35
)
Building Site - Preparation and ClearingExcavation - Major Grading or ReslopingLandscape - Minor Grading or Resloping+2 more

Serving Tigard, OR and surrounding areas

Approved

Super Service Award Winner

In business since 2020

Free estimates

Emergency services offered

"I was very happy with Dirt Road Excavation & Debris. They were easy to reach very accommodating on my schedule needs, quick and efficient. I had no problems with them at all and it was a relieve to have the big junk we needed gone after doing renos gone without any hassle."
Response time11 hrs
11 neighbors recently requested a quote
Recommended by90%of homeowners
Avatar for WB Excavation
WB Excavation
4.9(
17
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping

Serving Tigard, OR and surrounding areas

Approved

In business since 2019

Free estimates

Credit card accepted

"They put in new drains and a dry well for our driveway, carport, and front yard. When the first dry well wasn't large enough to hold all the runoff from a heavy storm, they came back and added a second for free. Excellent customer service, very responsive, good work."
Gallery
2 neighbors recently requested a quote
Recommended by80%of homeowners
Avatar for North Woods Tree Service
North Woods Tree Service
4.9(
127
)
Building Site - Preparation and Clearing

Serving Tigard, OR and surrounding areas

Approved

In business since 1988

Free estimates

Emergency services offered

"Excellent service. The pruning of the 2nd oak tree and the Hawthorne tree was done one day, and all other work done the next day. The 4-person crew was very professional, kind, and respectful of the property. The large oak I had removed was right up against a new fence, and not far from the side of my house. And, it was not in an area to get a bucket truck nearby. They arrived right on time at the start of the day and worked hard with minimal breaks - very impressive. They ground the stump from the large oak as well as grinding a couple of leftover stumps from previously removed holly trees. Their cleanup was superb! They even blew stuff off the top of my roof! And the wood cut down was nicely rolled together - not just dumped into a large messy clump! And, they were cheaper than another bid I got from a company here on Angie. I cannot recommend them high enough."
50 Feet From Tip To Top
Almost To The Top
Another View Of The Trunk
Arrival Of Crane
Base Log Was Sectioned

+104

4 neighbors recently requested a quote
Recommended by94%of homeowners
Avatar for Eric's Quality Building, Inc.
Eric's Quality Building, Inc.
4.9(
43
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+1 more

Serving Tigard, OR and surrounding areas

Approved

In business since 2010

Free estimates

Small jobs welcome

"Had a retaining wall done? Eric was great in keeping me informed of all steps up to the very end and was easy to work with. His team did an outstanding job and the wall looks great. It is nice to have a company that shows pride in its work and cares about the customer. I highly recommend them."
 grape arbor done with rough cut material
New Deck
Stair and Fence
Portland ADU (framing siding roofing)
  grape arbor done with rough cut material

+122

4 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for JA Holland Construction, LLC
JA Holland Construction, LLC
4.8(
20
)
Excavation - Major Grading or Resloping - For BusinessBuilding Site - Preparation and Clearing - For Business

Serving Tigard, OR and surrounding areas

Approved

Super Service Award Winner

In business since 2020

Free estimates

Credit card accepted

"Replacement 830 sq ft driveway for $9400 J. A. Holland construction gave me a new amazing, perfect, flawless driveway of 830sqft for $9400. This included a drainage system under the driveway from gutter downspouts detouring water away from the driveway, a light grey tint added to the concrete, demo removing the old driveway, correcting a slope, inspections, the concrete and a finish with a brushed texture. Reasons why I chose this company out of 6 bidders: 1. By checking CCB license through Oregon Construction Contractors Board using google. Thomas Holland, owner, has had the same license, unblemished, for over 10 years. Some of the others had their license for less than a year or had consumer complaints, problems attached to their license. 2. Thomas has an eye for potential problems and was the only one to suggest a drainage system under the driveway to collect water from the gutter of this old home. 3. Thomas does the work along with his crew, very important to me as I have had bad experiences with the contractor who has multiple jobs, sends a crew unsupervised. Example: One plumber decided he was not going to do a section of plumbing, signed off the job and had I not been there reporting him, that section of plumbing I paid for would have not been done. 4. I found over 10 great 'real' reviews on J.A. Holland Construction. could find no reviews or very little on the other bidders. 5. First impression of Thomas is an all around 'good' guy, straight forward, no phony sales pitch. 6. The price. Thomas came in low, tied exactly with another low bid, and this great price with the under driveway drainage system. The job: Demo: Took only 2 days and what a performance as neighbors also watched in awe, the street lined with heavy machinery in order of use and so organized as as the old concrete was lifted, put in the vehicle to be disposed of, gravel was put in place. Thomas is a master of heavy vehicle machinery, used a generous amount of gravel and had the job cleaned up by 5pm both days. 2. Forms installed, passed inspection. 3. The concrete pour was just as smooth and also passed inspection without incident. On one walkway I had done by another company, very little gravel was used and I noticed later a slight yellowish tan stain had appeared, found none of this with the work from Thomas, and believe it is because of the generous layer of gravel. In fact, I can not find one irregularity in the concrete."
Se. Salem driveway
Block retaining wall
Block retaining wall
Block retaining wall drivway
Response time3 hrs
Response rate97%
1 neighbors recently requested a quote
...
Showing 1-10 of 169
Excavating questions, answered by experts

A perc test can take anywhere from one to eight hours to complete. The total time depends on factors like the amount of excavation required, the depth and width of the holes, and whether multiple test holes are needed. For a single hole, the process of filling it with water and monitoring the drainage rate usually takes less than an hour. Professionals can often complete the entire test in a single day. While it's possible to get results the same day, some companies may take a few days to provide the official report.

Professional installers often include a deep layer of crushed gravel under permeable pavers to allow more runoff to soak through into the soil below. Many installations will include multiple layers of gravel, with coarser aggregate at the base and finer aggregate that sits on top of that bottom layer. Above the gravel, you’ll often find coarse sand that helps reduce paver shifting over time. Some permeable paver designs include a water collection system set into the gravel layer to route runoff to a safe area for disposal.

Completion time ranges from days to weeks, contingent on project size, environmental conditions, and regulatory approvals.

Yes, chipmunk holes may have two or more entrances. Chipmunks can create an entire network of burrows. Having multiple entrances makes it easier for them when trying to escape from a predator, such as a snake, or if an entrance collapses due to flooding. Each entrance leads to the nesting chamber underground, which is where the chipmunk spends the majority of its time sleeping.

To drill a shallow well, you may be able to use a drive well point. This is a tapered point that is driven into the ground. A drill bit at the end of PVC pipe may be another option to consider. A lot of the cost depends on what tools are available near you.

The Tigard, OR homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.