Top-rated home builders.

Get matched with top home builders in Enumclaw, WA

Enter your zip and get matched with up to 5 pros

Need a pro for your home building project in Enumclaw, WA?

Select your specific project to find the pro for you.

TRUSTED BY ENUMCLAW, WA HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon43
    Verified home building services reviews

Find Home builders in Enumclaw

Near Me Roofing Company
5.0(
74
)
Find a Custom Home Builder

Serving Enumclaw, WA and surrounding areas

Approved

In business since 2012

Free estimates

Credit card accepted

"I am very satisfied with Near Me Roofing Company with the brand new roof they have done for my home. They are very professional and respond well and fast to all your questions and concerns. They have good prices and good quality! They get to work right away and get it done right as well. Their work is definitely worth every penny! I am very happy with the end result living under a safe and well put together roof."
Response time4 days
Recommended by80%of homeowners
Avatar for Legacy Construction Group LLC
Legacy Construction Group LLC
4.6(
8
)
Find a Custom Home Builder

Serving Enumclaw, WA and surrounding areas

Approved

In business since 2000

Free estimates

Credit card accepted

"Arcenio is excellent and precise. He has excellent customer service. He reassured me and made me feel confident in the results throughout the project."
des moines
des moines
des moines
des moines
stair case

+40

Response time2 days
3 neighbors recently requested a quote
Recommended by28%of homeowners
Avatar for Big Dog Handyman Services
Big Dog Handyman Services
4.9(
8
)
Shelter or Outbuilding - Build

Serving Enumclaw, WA and surrounding areas

Approved

In business since 2021

Free estimates

Small jobs welcome

"Big Dog Handyman is honest, thoughtful, skilled, kind, fair, trustworthy, and will bring fresh eggs from his chickens!! I hire him when I have several projects to repair and he approaches each of them with intelligence, timeliness, and thoughtfulness. My home & life is better off because of Big Dog!"
Opening up the wall to see what we're dealing
The space we have to work with
Pantry shelves
Sheetrock, lighting, and framed doorway
Building the door

+8

Response time1 day
Recommended by87%of homeowners
Avatar for Warrior Construction Services
Warrior Construction Services
5.0(
11
)
Find a Custom Home BuilderFind a Modular Home Builder

Serving Enumclaw, WA and surrounding areas

In business since 2018

Free estimates

Credit card accepted

"I got ahold of Warrior Construction after suffering damage to my home. I spoke with Thomas, the company owner, and he was on top of it from the beginning. The bid and review process was quick and well done. After agreeing to the project, work commenced. I was very happy with the professionalism of Thomas and his crew. They respected my home and did an amazing job. I would not hesitate to call them again if in need of another restoration or a remodel."
Award Winning Serendipity
Divine Open Concept
Firehouse Farmhouse
Majestic
Serenity

+227

Recommended by100%of homeowners
Avatar for Sami Construction, LLC
Sami Construction, LLC
5.0(
14
)
Find a Custom Home Builder

Serving Enumclaw, WA and surrounding areas

In business since 2020

Free estimates

Warranties offered

"We hired Sami Construction to remodel a bathroom, re-tile a fireplace, replace carpet throughout our house and replace some water damaged siding on the outside of our house. They were reasonably priced, responsive, completed the projects quickly and delivered quality results. They were pleasant to work with. I highly recommend them and would hire them again for any work inside or outside my house."
Response time1 day
Recommended by81%of homeowners
Your Decks Next
4.6(
66
)
Shelter or Outbuilding - Build

Serving Enumclaw, WA and surrounding areas

In business since 1991

"Scott Lewis/Home Enhancements was great. We found Scott on Angie’s list and then also identified that he had successfully performed work for our neighbor. Always sensitive to our budget, he took our desire to replace, expand, and cover our deck and turned it into a backyard space that we have received nothing but complements on. Beginning first with his own initial ideas, he listened thoughtfully to what we were looking for and completed a design that matched that. During construction he was really easy to work with including helping us with a couple changes that we made after construction started. We highly recommend Scott and his work."
Additional Photos
Recommended by100%of homeowners
Avatar for SJ Paint and Renovation
SJ Paint and Renovation
4.9(
16
)
Shelter or Outbuilding - Build

Serving Enumclaw, WA and surrounding areas

In business since 2016

Free estimates

"The service was awesome. They were able to find what we wanted, price point. They worked within the budget. The job was done professionally and they cleaned up after themselves. They were very respectful of our home."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+17

Recommended by100%of homeowners
Avatar for JD BERGEVIN HOMES
JD BERGEVIN HOMES
4.3(
19
)
Find a Custom Home BuilderFind a Modular Home BuilderShelter or Outbuilding - Build

Serving Enumclaw, WA and surrounding areas

In business since 2005

Free estimates

Credit card accepted

"TLDR; Driving progress is up to you.  Painter is incompetent.  Will miss every deadline.  No green building acumen.
  I hired Joe to add a bedroom to my house and pour a concrete pad for another room.   It was a straightforward project he estimated would take 2.5 months (10/1-12/15).  He volunteered the 12/15 completion date so I put fines in the contract if substantial work was not completed by 12/25.  From the architectural drawings, the only thing that changed during the project was the size of one window and the additional removal of a 3 foot interior wall.
  10/1, the work started and within the first two weeks, excavation was done, the foundations were poured, the framing was done and the windows and trusses were ordered.  Within a month the trusses and roof were on and the windows were installed.  So far, so good, but this was all done by one sub.
  Then things started going in slow motion.  I moved out for the month of November so they could get the dusty indoor work done without disturbing my family.  There were only 3 things completed in November, the electrical was roughed in, two small (5 foot and 3 foot) non-load bearing walls were removed and there was a day or two of digging on a retaining wall.  Disappointed in the progress I asked him twice for a schedule with the remaining tasks and dates.  Although he said he could provide one, he never did.
  He was supposed to have the drywall and insulation done by December 1st (a date again volunteered by him), so my HVAC contractor could install a ductless heat pump.  I had to push out that date by 2 weeks.  Also due to him missing the schedule, I was heating an uninsulated room for 3 days.
  For the siding, outsulation and exterior window trim, he set up 3 meetings to go over it with my architect.  The first one, the sider didn?t show.  I wasn?t around for the 2nd one.  The third time he sent a sider who had never worked with outsulation before.  To his credit, he paid for the 3rd meeting.  Although the architectural drawings went into explicit detail, the sider required handholding to understand them.  My architect was visibly frustrated explaining the installation process to him over the language barrier.   The sider charged $8000 for 4 days of work.  It was $2900 over Joe?s original bid.   This seemed high for 2 reasons.  1. A bid from a competitor who specialized in green building, had worked with my architect before and was familiar with outsulation bid $5600.   2. When I asked the sider why the caulk job was so bad, he revealed he had used a random day laborer to help.  When I asked Joe about the price, he stated that the price was fair because there were several surprises, and he had asked the sider to come down in price.  Not buying this explanation, I called the sider myself.  I asked him if he had provided Joe with a bid before he started working and he said no.  I asked him if Joe had asked him to come down in price and he said no.  So Joe essentially wrote him a blank check with my money.
  By the beginning of January, electrical still hadn?t been hooked up, there were no doors or gutters and the porta-potty and trash heap remained.  I?d had enough of Joe?s work and I wanted him to tie up the loose ends, give me the final bill and get out.  I handled all of the interior work, hanging the doors, doing the trim, painting, patching the drywall and installing the flooring to wrap this up as quickly as possible.  Unfortunately, after the initial bit of electrical was done on 1/6/15, I stopped the fines.  Joe went back into slow motion.  I?ve attached a full timeline so you can get a taste of this.
  Probably the biggest debacle of the project was the exterior painting.  I had told Joe I wanted to have him do the exterior painting, but I wanted it done when the weather was nice.  Ignoring my request, his guys came out to paint on 1/15/15. It was sprinkling when they arrived, but they shrugged it off with ?It wasn?t raining in Federal Way.?  More and more rain kept coming, so they covered their sprayer to protect it while they continued painting.  Then it started a downpour.  All the paint washed off.  They returned the next day to continue.  It rained again that day.  They didn?t prime any of the bare wood and painted it while it was soaking wet.  Not surprisingly, very little of it adhered to the wood.  I fired the sub in charge of the painters because he was supposed to do some work inside like hanging the doors and doing trim work and I didn't want him trashing my house any more. They came out again to paint, this time it wasn?t raining.  But the paint job looks terrible.  There remain bubbles, drips, uneven coloration and almost bare wood in places.  (There is one picture from the first day and all the remaining are as it looks today) I told Joe to hold payment for this until they did it right.  Joe has repeatedly told me he would make it right, but hasn?t delivered.  I scheduled a meeting with the painters to come out and review their work, but they never showed.  Also telling is Joe didn?t look at the paint job himself when he came to collect the final payment.
  Twice during the project I was approached by his subs asking for money.  Although I paid Joe the day he asked, it was clear there was a considerable delay with money flowing to his subs.  First the concrete guy showed up at my door and I got a lien notice from the company, the second was the door guy.  The door guy said, it takes a long time for Joe to pay.  It took over Joe over 2 months after his last day to collect the invoices and present me with the final bill.
  Something as simple as grading a 20 foot driveway and hauling out the trash, spanned 2 weeks to complete.  The worker trashed the retaining wall and left a bunch of concrete debris which I had to get hauled out myself (see picture).  Also of note, my circular saw mysteriously disappeared after the driveway guy used my table saw.
Here is the timeline:
Before work starts pay 1/3
10/1 Project and excavation starts
10/7 Concrete pads poured
10/10 Room, framed and sheathed
10/17 Trusses on
10/25 Roof on
10/31 Windows in
11/4 Pay second 1/3
11/5 Retaining wall digging starts
11/10 Remind Joe I need the insulation and drywall done by 11/30 for a scheduled HVAC install.
11/11 I provided my door choices to order.
11/12 Rough in of electrical
11/20 Small interior walls removed
11/23 Retaining wall ordered
11/25 Retaining wall arrives
11/28 Checked on doors, still hadn?t been ordered.
12/1 I return to my home and there is no drywall or insulation.
12/3 Insulation is done
12/9 Drywall starts
12/12 Drywall is done
12/13 Retaining wall digging ends
12/15 They come out to look at siding with architect
12/16 Retaining wall done
12/17 Doors actually ordered
12/19 Siding starts
12/22 Doors supposed to arrive
12/24 Siding done
1/6/15 Electrical finish starts
1/7/15 Asked to grade the driveway and finish up
1/10/15 Gutters on
1/15/15 Awful paint job done in the rain
1/16/15 Bare wet wood painted without priming, doors come in, wrong size
1/17/15 Driveway grading starts
1/20/15 Paint job touched up but not fixed, barely painted wood, bubbles, drips, uneven coloration remains
1/21/15 Electrical finish completed
1/26/15 Doors finally come in the correct size
1/27/15 Driveway graded
4/6/15 Get and pay final bill
4/18/15 Schedule painter 4/24 to review work
4/24/15 Painter doesn?t show up
"
Recommended by71%of homeowners
Avatar for Kairos Enterprises Inc
Kairos Enterprises Inc
4.4(
77
)
Shelter or Outbuilding - Build

Serving Enumclaw, WA and surrounding areas

In business since 2008

"Kairos is owned and run by women which we appreciated when we worked with them as two women.  They were punctual, and communicative, and also just great people that I was happy and comfortable with having in my home.  All of the staff are experts in many skills, and they have extended experts- i.e. a journeyman electrician- on staff to help/consult if they run in to anything hairy at your hours- ours is old, and of course this happened.  They also educated me so that in the future I could do a lot of these jobs myself, or even related jobs based on the same skills.  When we ran in to things, I never felt like they were short cutting, or anything that would compromise the quality of the work, and rather that they were going out of their way to make sure that the work was done in a way that they would want done in their own homes.  I'd definitely use them again, and I know it'd be a great job, with some great women.
"
Before picture
Completed picture
Close-up of new cabinet
Recommended by85%of homeowners
...
Showing 1-10 of 114
Home Building questions, answered by experts

A-frame homes are on the smaller side. While there’s no set square footage amount it has to be, it will usually come in around 1,000 square feet or smaller.

The average build timeline for a home is between six and 12 months, with timelines pushing toward the upper end of that range if you’re creating a custom design or need a lot of land preparation before getting started. Hiring a general contractor or a custom homebuilder will help speed up the process, as you’ll see fewer delays between different parts of the build process getting done.

Local regulations dictate how big an ADU can be, and there may also be restrictions on the percentage of the main residence’s square footage an ADU can have. In most cases, an ADU must be smaller than the main residence, but check with your local building authority to confirm restrictions on ADU size.

Remodeling a house is often less expensive than building a new house. You can expect to pay an average of $100 per square foot when you are remodeling. The cost to build a house averages about $150 per square foot. When remodeling, though, some rooms cost more than $100 per square foot and some cost less. Use a home renovation cost estimator to accurately estimate your remodeling costs.

Check reviews, compare quotes, and verify licensing. Ensure the builder has experience with modular construction.

The Enumclaw, WA homeowners’ guide to home building services

From average costs to expert advice, get all the answers you need to get your job done.