Top-rated subcontractors.

Get matched with top subcontractors in New Castle, VA

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in New Castle, VA?

Select your specific project to find the pro for you.

TRUSTED BY NEW CASTLE, VA HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon591
    Verified subcontracting services reviews

Find Subcontractors in New Castle

Avatar for B & B Services
B & B Services
4.5(
16
)
Major Home Repairs (General Contractor)

Serving New Castle, VA and surrounding areas

In business since 2018

Free estimates

Emergency services offered

"Our furnace motor was making a loud noise, and Chris Suttles came by and diagnosed the problem shortly after I called. He fixed the problem that afternoon, and the furnace is now quieter than it's ever been. I asked him to come by the next week and give the furnace a tune-up and clean the heating ducts. When Chris opened one of the supply ducts, he found the inside of the ducts had a sticky, oil-like coating. I decided to replace the ductwork, and he replaced all of the ductwork in 2 days. The air coming out of our vents is now cleaner, warmer, and stronger."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+4

Recommended by92%of homeowners
Avatar for Nesting Sensations
Nesting Sensations
5.0(
4
)
Major Home Repairs (General Contractor)

Serving New Castle, VA and surrounding areas

In business since 2013

Free estimates

"I had Will come to the house on two separate occasions to install baby gates and to pressure wash the front porch. He did such a good job and I look forward to hiring him for any jobs in the future!"
Underground plumbing and electrical building feeds
Handyman Services Project
Underground plumbing and electrical building feeds
Additional Photos
Additional Photos

+13

Recommended by100%of homeowners
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)
Major Home Repairs (General Contractor)

Serving New Castle, VA and surrounding areas

In business since 2006

Credit card accepted

"Once I sent her all the measurements, it took her a little while to get the options back to me.  Overall, they're good designs.  However, they're very simplistic and give general ideas for space planning.  I was hoping to have a better idea for sizes of furniture for the space and some variations on staging.  
Jill was very responsive when I did have a question.  I'm not sure how helpful it is to have a virtual design done.  If we lived in similar cities, I'd probably use her again for help with additional designs.
"
Recommended by55%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Major Home Repairs (General Contractor)

Serving New Castle, VA and surrounding areas

In business since 2006

Credit card accepted

"The man I talked to was very professional and timely. However, he explained that this particular job was beyond the scope of what their company does. I would certainly use them on another 'issue'.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 30
Subcontractors questions, answered by experts

Yes, designers collaborate with contractors and engineers to ensure a smooth construction process.

It usually takes around four to six months to build and install a modular home, although your timeline could go up to around eight months if there are delays in the manufacturing or permitting process. Heavy site preparation and foundation pouring can extend that timeline if you need them, as can customizations you want for your modular home. Your modular home company should be able to provide an estimate for the construction timeline before you sign any contracts or agree to any work.

Italianate architecture is a reinterpretation of Renaissance styles, combining elements of Italian farmhouses and villas with Victorian materials and construction. This home style emerged in the Victorian era, gaining popularity in the U.S. in the mid-to late-1800s. The style came about in response to what many then viewed as the too-rigid and stuffy Classical style designs. 

Costs depend on material, size, design complexity, and additional features like lighting or seating.

It can take anywhere from a few days to several months to draw up architectural plans, depending on the complexity of your project. Architectural plans are highly detailed documents that take time to complete, and any changes or alterations can significantly extend how long they take.

The New Castle, VA homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.