Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Hood River, OR

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Hood River, OR?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Hood River

Avatar for Luna Masonry LLC
Luna Masonry LLC
5.0(
30
)
Brick and Stone Driveways & Floors - InstallInterlocking Pavers for Driveways & Floors - Install

Serving Hood River, OR and surrounding areas

Approved

Super Service Award Winner

In business since 2024

Free estimates

Small jobs welcome

"Scope of project: 1) reset/regrade pavers stones in front walkway and back patio area that were displaced by new driveway and trenches, 2) install drain in low spot connecting to an existing drain, 3) demo a platform of pavers next to the garage to make even with the rest of the patio. I had a wonderful experience hiring Jose with Luna Masonry from beginning to end. I chose him over other bids because he seemed very knowledgeable, easy to communicate with, and well versed in the scope of my project. His estimate also seemed like a fair fee. Jose and crew were able to schedule right away and completed my project in a timely fashion. The end result was very impressive and they cleaned up the work area well. Jose also had some good tips on maintenance. I couldn't be happier. https://photos.app.goo.gl/VKARHX6dfxthL2Ni8"
After picture
After picture
After picture
Before picture
Before picture

+15

Response time11 hrs
Response rate99%
3 neighbors recently requested a quote
Avatar for Elias Construction Services LLC
Elias Construction Services LLC
4.4(
9
)
Concrete Driveways - Install

Serving Hood River, OR and surrounding areas

Approved

In business since 2008

Free estimates

Emergency services offered

"Elias Contruction provided a detailed estimate after inspecting the roof and making some qualified recommendations. The project required a few change orders that were not clarified in writing. I would recommend hiring Elias if you get changes in writing. They cleaned up pretty well although they missed a few things due to finishing in the dark. Overall satisfied with the job and cost was 60% of other bids due to sheathing adjustment."
After
IKO Cambridge Earthtone C
IKO Dual Grey Dynasty
3 Tab
3 Tab

+24

Response time1 day
3 neighbors recently requested a quote
Recommended by14%of homeowners
Busser contractors LLC
New to Angi
Concrete Driveways - Install

Serving Hood River, OR and surrounding areas

Approved

Free estimates

Credit card accepted

\nWe take great pride in our experience, expertise, quality, and customer service that we provide to meet the consumer’s needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on service, safety, and quality, regardless of how large or small the job.\n

11 neighbors recently requested a quote
Avatar for Penney excavating
Penney excavating
5.0(
5
)
Gravel or Loose Fill Paving - Install, Spread or ScrapeGravel or Loose Fill Paving - Install, Spread or Scrape - For Business

Serving Hood River, OR and surrounding areas

In business since 2020

Free estimates

Emergency services offered

"It went great he did such a good job it turned out way better then I expected most definitely would give Penney Excavating 5 STARS if I ever have anything else for him to do again Austin will be the first and only person I call he is super good at what he does and really kind and caring so are the people that work for him they always put a smile on my face and super polite thanks again Penney excavating you guys are the best"
Driveway repair
Driveway repair
Driveway repair
Driveway repair
Driveway repair

+7

Recommended by100%of homeowners
Showing 1-10 of 38
Asphalt Driveways questions, answered by experts

Wet cutting is usually the preferred method. It controls dust, which helps protect your lungs and makes for a cleaner working environment. Plus, the water cools the blade, preventing overheating and prolonging its life while providing smoother, more precise cuts. The downside is the mess—water and asphalt sludge can be messy to clean. Dry cutting, though convenient if water isn’t available, creates a lot of dust, which can be harmful. This also increases the risk of blade damage due to overheating. So, if you have the option, wet cutting is the better method for most asphalt jobs.

Even with regular maintenance, most driveways don’t last much longer than 30 years. Alligator cracking is a clear warning sign that your driveway’s foundation is failing, and cracks that are deep and wide can let water in, causing more damage. Standing water is another red flag. If your driveway doesn’t drain properly, it’s going to degrade slowly. Finally, if you’re seeing dips or uneven patches, that’s a sign the base layer or soil is shifting. If these issues pop up, it’s time to replace your driveway.

You should not attempt to install your own driveway. Whether working with asphalt or pavement, this is a complicated project that requires special equipment. Talk to some nearby asphalt or paving professionals and discuss your particular needs—it’s a good idea to get a few quotes and look at the company’s past work.

The answer to whether or not you need to get a permit before you start your driveway can vary widely based on local ordinances and the scope of your driveway ideas. In most urban and suburban areas, a permit is needed before building a new driveway to ensure that a homeowner is using safe materials and proper drainage practices while designing and constructing a new driveway. In some rural areas, a homeowner may not be required to apply for a permit. When building a new driveway on your own, always check with your local building department to see if you need to request a permit. When hiring a driveway contractor, verify that the right permits are being used before driveway construction begins.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

The Hood River, OR homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.