Top-rated subcontractors.

Get matched with top subcontractors in Helena, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Helena, OH?

Select your specific project to find the pro for you.

TRUSTED BY HELENA, OH HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon118
    Verified subcontracting services reviews

Find Subcontractors in Helena

Avatar for Miller & Sons Construction & Home Builders
Miller & Sons Construction & Home Builders
New to Angi
Major Home Repairs (General Contractor)

Serving Helena, OH and surrounding areas

Approved

Free estimates

Warranties offered

Small jobs welcome

🏡 Dedicated to transforming homes with expertise in earthworks, concrete, pole barn building, and underground drainage. We believe in honest pricing and integrity, taking pride in our community and the quality of our work.

1 neighbors recently requested a quote
Avatar for Dave's Handyman Express
Dave's Handyman Express
4.1(
62
)
Major Home Repairs (General Contractor)

Serving Helena, OH and surrounding areas

In business since 2002

Emergency services offered

Credit card accepted

"We were able to come to terms on 3 bathroom painting projects.   Overall Dave is very responsive and punctual.  He definitely shows up when he says he will and that goes a long way.  Finish on paint is ok, but not the best.   I think that his dry wall work is very good and prep is pretty good.   Overall contractor I would give a good rating or a B.  Definitely not as bad as some of the contractors we have utilized so maybe with the market so busy he would be acceptable and does decent work for the price.   He definitely finishes his projects as well.   Overall B experience."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+23

Recommended by84%of homeowners
Peter J Kane Custom Builder, LLC
5.0(
4
)
Major Home Repairs (General Contractor)

Serving Helena, OH and surrounding areas

In business since 2005

Free estimates

"Pete was very professional and thorough!!  He was came when he said he would and did what he said he would.  He made recommendations without any pressure for additional work/cost.  The estimate was what I paid. 
The windows look great.  He was careful of details.  I would hire him again.   VERY GOOD WORK!!"
Additional Photos
Additional Photos
Additional Photos
Recommended by100%of homeowners
...
Showing 1-10 of 55
Subcontractors questions, answered by experts

The longest part of building a custom home is the design phase. It takes multiple professionals and a ton of work to bring your vision for your dream home to life while sticking to a homebuilding budget and also ensuring everything is built to code. Expect the design phase for a custom home build to take six months to a year.

When conducting space planning, building codes and regulations need to be considered. As long as you are taking them into account and discussing them with the architect, you should be able to do your space planning appropriately.

You have three options in terms of professionals who can draw up blueprints: a draftsperson, an architect, or a structural engineer. A draftsperson can sometimes draw up plans for new construction, but they more often work from approved plans for alterations or to provide 3D drawings. Architects are usually the best option for standard residential construction projects. Structural engineers might be necessary for custom home builds or for alterations that could affect your home’s structural integrity. Draftsmen cost the least of the three, followed by architects and then structural engineers.

Structural engineers draw structural plans, which include detailed drawings of the structural components of a home only. Complete house plans will require additional work from an architect or draftsperson, whose drawings will take the structural drawings into account. They’ll also include more details about the finishing materials and layout of a home, including everything from roofing and flooring materials to the position of furniture, light fixtures, switches, and plumbing fixtures.

Designing a building takes 2-6 months, depending on project size, required permits, and revisions.

The Helena, OH homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.