Top-rated subcontractors.

Get matched with top subcontractors in Tiffin, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Tiffin, OH?

Select your specific project to find the pro for you.

TRUSTED BY TIFFIN, OH HOMEOWNERS

  • Average homeowner rating star icon4.2
    Average homeowner rating
  • Verified reviews icon117
    Verified subcontracting services reviews

Find Subcontractors in Tiffin

Avatar for A - Z Construction
A - Z Construction
5.0(
4
)
Major Home Repairs (General Contractor)

Serving Tiffin, OH and surrounding areas

Approved

In business since 2016

Free estimates

Emergency services offered

"Anthony & crew were terrific They showed up on schedule & completed the job in the agreed upon timing. Anthony discussed all plans in advance, didn’t change plans or move ahead w/ a couple of things that came to light once the actual work started without talking to us first. He is very pleasant and easy to work with. I have a couple of other jobs that will head his way once we get them going. I will hire them again. No question."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+14

1 neighbors recently requested a quote
Recommended by50%of homeowners
Avatar for Miller & Sons Construction & Home Builders
Miller & Sons Construction & Home Builders
New to Angi
Major Home Repairs (General Contractor)

Serving Tiffin, OH and surrounding areas

Approved

Free estimates

Warranties offered

Small jobs welcome

🏡 Dedicated to transforming homes with expertise in earthworks, concrete, pole barn building, and underground drainage. We believe in honest pricing and integrity, taking pride in our community and the quality of our work.

1 neighbors recently requested a quote
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)
Major Home Repairs (General Contractor)

Serving Tiffin, OH and surrounding areas

In business since 2006

Credit card accepted

"Once I sent her all the measurements, it took her a little while to get the options back to me.  Overall, they're good designs.  However, they're very simplistic and give general ideas for space planning.  I was hoping to have a better idea for sizes of furniture for the space and some variations on staging.  
Jill was very responsive when I did have a question.  I'm not sure how helpful it is to have a virtual design done.  If we lived in similar cities, I'd probably use her again for help with additional designs.
"
Recommended by55%of homeowners
Avatar for Dave's Handyman Express
Dave's Handyman Express
4.1(
62
)
Major Home Repairs (General Contractor)

Serving Tiffin, OH and surrounding areas

In business since 2002

Emergency services offered

Credit card accepted

"They fixed the heater, and it broke again a couple of months later. The price was $600 the first time.  This time, I got a home warranty. They were prompt. They came quickly to fix it the same day, which was good. I don’t know if it was their fault, but the heater broke."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+23

Recommended by84%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Major Home Repairs (General Contractor)

Serving Tiffin, OH and surrounding areas

In business since 2006

Credit card accepted

"I never contacted the provider or used this service in anyway. I have to
write this review so that the request to write this review stops
popping up.
The rating is bogus as it is required to be able to submit.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
...
Showing 1-10 of 52
Subcontractors questions, answered by experts

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

Yes, such as using eco-friendly materials and energy-efficient designs for long-term savings.

The costs depend on the type of wood, labor, roofing material, permits, and whether additional storage or enclosed walls are included.

Above all, the downside to building a new house is a longer timeline. You need several months to finish the build, depending on the supply chain and labor availability in the meantime. Building a home compared to buying one is also more expensive, both in the building process and when it comes to mortgage rates and property taxes.

The cost to draw house plans typically ranges from $800 to $2,700, with standard blueprints averaging around $1,800. For a custom home, the cost is higher, with blueprints often falling between $5,000 and $20,000, and potentially more for very complex designs. Several factors influence the total price, including the project's size, the number of rooms, the type of drawings required, and the architect's experience level. You may also need to pay a structural engineer to ensure building safety, particularly for custom homes.

The Tiffin, OH homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.