Top-rated subcontractors.

Get matched with top subcontractors in Genoa, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Genoa, OH?

Select your specific project to find the pro for you.

TRUSTED BY GENOA, OH HOMEOWNERS

  • Average homeowner rating star icon4.3
    Average homeowner rating
  • Verified reviews icon75
    Verified subcontracting services reviews

Find Subcontractors in Genoa

Avatar for Miller & Sons Construction & Home Builders
Miller & Sons Construction & Home Builders
New to Angi

Serving Genoa, OH and surrounding areas

Approved

Free estimates

Warranties offered

Small jobs welcome

🏡 Dedicated to transforming homes with expertise in earthworks, concrete, pole barn building, and underground drainage. We believe in honest pricing and integrity, taking pride in our community and the quality of our work.

1 neighbors recently requested a quote
Avatar for Rock Roofing LLC
Rock Roofing LLC
4.4(
210
)

Serving Genoa, OH and surrounding areas

In business since 2004

Free estimates

Emergency services offered

"Exceptional service from first contact to quote, and job completion. Everything they told me was completed to superb standards. They didn’t cut corners. Cleanup was impeccable after the job. The roofers were friendly and polite. I would absolutely recommend them and I would use them again if needed."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+8

Recommended by94%of homeowners
Avatar for Real Deal Remodeling
Real Deal Remodeling
4.4(
42
)

Serving Genoa, OH and surrounding areas

In business since 2007

Free estimates

Emergency services offered

"The attic above the garage was remodeled to into a spacious room, with insulation drywall and air conditioning. An excellent job was done with attention to details. A very dependable contractor."
Remodeling - General Project
Custom fireplace
Remodeling - General Project
Custom fireplace
Custom fireplace

+163

Response time3 days
Response rate100%
Recommended by92%of homeowners
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)

Serving Genoa, OH and surrounding areas

In business since 2006

Credit card accepted

"Once I sent her all the measurements, it took her a little while to get the options back to me.  Overall, they're good designs.  However, they're very simplistic and give general ideas for space planning.  I was hoping to have a better idea for sizes of furniture for the space and some variations on staging.  
Jill was very responsive when I did have a question.  I'm not sure how helpful it is to have a virtual design done.  If we lived in similar cities, I'd probably use her again for help with additional designs.
"
Recommended by55%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)

Serving Genoa, OH and surrounding areas

In business since 2006

Credit card accepted

"The man I talked to was very professional and timely. However, he explained that this particular job was beyond the scope of what their company does. I would certainly use them on another 'issue'.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
...
Showing 1-10 of 65
Subcontractors questions, answered by experts

Most Greek Revival architecture homes are one and a half to two stories, depending on the footprint, which sets them apart from some Federal architecture homes that are three stories. The gabled roof on the second floor can sometimes cut into the living space, especially on smaller homes of this style, which leaves a much smaller living area upstairs.

A floor plan is a less detailed illustration showing a building or room's layout from above, including elements like windows, doors, walls, and fixtures. It offers a simplified view for homeowners. In contrast, a blueprint is a more detailed, to-scale architectural drawing that includes all parts of the building plans, such as structural elements, construction details, and utility schematics. While a floor plan can be a type of view within a blueprint, the complete blueprint contains all the necessary details to turn the plan into a reality.

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

The process typically takes 2-6 weeks, depending on the project size and level of customization.

While possible for small projects, professional designers ensure compliance with building codes and structural integrity.

The Genoa, OH homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.