Top-rated subcontractors.

Best subcontractors near North Baltimore, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in North Baltimore, OH?

Select your specific project to find the pro for you.

TRUSTED BY NORTH BALTIMORE, OH HOMEOWNERS

  • Average homeowner rating star icon4.8
    Average homeowner rating
  • Verified reviews icon50
    Verified subcontracting services reviews

Top-Rated Subcontractors in North Baltimore - Updated Nov 2026

Avatar for Rock Roofing LLC
Rock Roofing LLC
4.4(
210
)
Major Home Repairs (General Contractor)

Serving North Baltimore, OH and surrounding areas

In business since 2004

Free estimates

Emergency services offered

"Exceptional service from first contact to quote, and job completion. Everything they told me was completed to superb standards. They didn’t cut corners. Cleanup was impeccable after the job. The roofers were friendly and polite. I would absolutely recommend them and I would use them again if needed."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+8

Recommended by94%of homeowners
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)
Major Home Repairs (General Contractor)

Serving North Baltimore, OH and surrounding areas

In business since 2006

Credit card accepted

"Once I sent her all the measurements, it took her a little while to get the options back to me.  Overall, they're good designs.  However, they're very simplistic and give general ideas for space planning.  I was hoping to have a better idea for sizes of furniture for the space and some variations on staging.  
Jill was very responsive when I did have a question.  I'm not sure how helpful it is to have a virtual design done.  If we lived in similar cities, I'd probably use her again for help with additional designs.
"
Recommended by55%of homeowners
Avatar for Dave's Handyman Express
Dave's Handyman Express
4.1(
62
)
Major Home Repairs (General Contractor)

Serving North Baltimore, OH and surrounding areas

In business since 2002

Emergency services offered

Credit card accepted

"We were able to come to terms on 3 bathroom painting projects.   Overall Dave is very responsive and punctual.  He definitely shows up when he says he will and that goes a long way.  Finish on paint is ok, but not the best.   I think that his dry wall work is very good and prep is pretty good.   Overall contractor I would give a good rating or a B.  Definitely not as bad as some of the contractors we have utilized so maybe with the market so busy he would be acceptable and does decent work for the price.   He definitely finishes his projects as well.   Overall B experience."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+23

Recommended by84%of homeowners
...
Showing 1-10 of 55
Subcontractors FAQs, answered by experts

Structural engineers draw structural plans, which include detailed drawings of the structural components of a home only. Complete house plans will require additional work from an architect or draftsperson, whose drawings will take the structural drawings into account. They’ll also include more details about the finishing materials and layout of a home, including everything from roofing and flooring materials to the position of furniture, light fixtures, switches, and plumbing fixtures.

Costs depend on material, size, design complexity, and additional features like lighting or seating.

Drawing your own floor plans is acceptable for many kinds of projects, including interior design and room layout. You can use floor plan software to create the plans but keep in mind that the floor plan will only be as accurate as the measurements you take and enter into the software.

How long it takes to build an in-law suite will vary by type. The time it takes to build an addition will typically be less than for completely new construction. Expect to spend about two months if you convert a basement, attic, or other existing room in your home. New structures can take up to five months, plus up to two months to receive the required permits.

Make sure you’re getting the right size to meet your space needs, including enough space both side to side and vertically to accommodate your RV’s features and allow you to safely move it in and out of the garage. 

If you’re building an attached and enclosed garage for your RV, you’ll also want to give some thought to whether you’d like to add workspace, water or electricity, or additional storage. If so, you’ll need a garage with larger dimensions.

The North Baltimore, OH homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.