Top-rated basement remodelers.

Best basement remodelers near Sophia, NC

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Sophia, NC?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in Sophia - Updated Nov 2026

Avatar for Cransten Remodeling
Cransten Remodeling
4.5(
208
)
Basement - Remodel

Serving Sophia, NC and surrounding areas

Approved

Super Service Award Winner

In business since 2016

Free estimates

Emergency services offered

"Joseph remodeled our bathroom and did an amazing job. Extremely trustworthy and detail oriented. Great with communication as well, which I appreciated. I strongly recommend."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+18

Response time1 day
Response rate100%
4 neighbors recently requested a quote
Avatar for DHIM Construction INC
DHIM Construction INC
5.0(
1
)
Basement - Remodel

Serving Sophia, NC and surrounding areas

Approved

In business since 2016

Free estimates

Credit card accepted

We are a locally owned and operated company that values honesty and integrity and treats your home as if it were our own. Our services are customized to the individual project, paying close attention to the details of each project that we're involved with. We pride ourselves on the quality of our work as well as our commitment to outstanding results. We look forward to building lasting relationships and guaranteeing your satisfaction!

4 neighbors recently requested a quote
Avatar for New World United & Co.
New World United & Co.
5.0(
8
)
Basement - Remodel

Serving Sophia, NC and surrounding areas

In business since 2010

Free estimates

Warranties offered

"New World Utilities Moreno, LLC completed the remodel on my deck. They installed new support beams and metal railings within a reasonable time and price. I am incredibly pleased with their quality of work."
Remodeling - Kitchen & Bathroom Project
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+12

Response time12 hrs
Response rate100%
Recommended by100%of homeowners
Avatar for Deaton Builders Inc. - Ana Sayfa  Facebook
Deaton Builders Inc. - Ana Sayfa Facebook
5.0(
13
)
Basement - Remodel

Serving Sophia, NC and surrounding areas

In business since 1992

Free estimates

"David and Thomas came by my house and had with them many samples of floor covering. They took the time to explain the process of installing the flooring and helped us to decide what would look good in all the rooms."
Cabinets Before
Our deck projects
Installing Laminate
New addition and remodel
Kitchen Remodel

+30

Recommended by81%of homeowners
...
Showing 1-10 of 64
Basement Remodel FAQs, answered by experts

Professional remodelers streamline the process, manage permits, and handle renovations efficiently—significantly mitigating risk while maintaining standards.

Home improvements that increase value offer a high return on investment (ROI) and can enhance your quality of life. Upgrades to your home’s curb appeal often add the most value, with garage door replacement having one of the best ROIs at 93%. Other high-value exterior projects include replacing your front door, upgrading siding and roofing, installing a stone veneer, adding new windows, and landscaping. For interior renovations, a fresh coat of paint provides an excellent ROI. Major projects like a kitchen remodel or upgrading appliances and HVAC systems also add significant value, as potential buyers appreciate the peace of mind that new equipment provides.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

A finished basement does not always count as square footage, as this varies by state regulations. In areas that allow below-grade spaces to be included in a home's official square footage, the basement must typically meet certain conditions. These conditions often include having a functional egress and being a livable space with flooring, finished walls, and temperature control. To be certain, contact your local assessor to confirm your area's specific policies regarding basement square footage.

Installing a bathroom in a basement isn’t a project for most homeowners. Many parts—plumbing, electricity, and carpentry—go into this project, each requiring expert-level knowledge and tools. One miscalculation can lead to very expensive repairs. Plus, some homeowner’s insurance might not pay for damages caused by a homeowner DIYing this project. You can protect yourself by allowing the pros to complete this job for you. 

The Sophia, NC homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.