Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Columbus, MT

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Columbus, MT?

Select your specific project to find the pro for you.

Find Above ground pool installation pros in Columbus

Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,689
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Columbus, MT and surrounding areas

In business since 1971

Credit card accepted

"One oven doesn't work at all ( my choice, see above), the "working" oven was never calibrated properly so using it is hit or miss. It's time to call American Home Shield to see about replacing the entire unit. I'm waiting to finish other home projects before calling them. I don't know if I'll request Greenway again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Install Above Ground Pools questions, answered by experts

Customization options may include different pool shapes, sizes, decks, and additional accessories like ladders or pool lights.

Building a pool yourself will take at least eight to 12 weeks. After all, this is the building timeline after hiring a pool contractor who knows how to draw up plans, analyze your landscape, and apply for proper permits. If you choose to tackle any part of the process alone, assume building a pool will take two to three months at a minimum.

A black tarp will indeed heat your pool. Black absorbs more heat than other colors. This heat will transfer down to the water in your pool and help increase the temperature. It will not be extremely effective at raising the overall temperature, but it can help maintain the current temperature.

Yes. A pool pH too high may result in a rash, red, or stinging eyes for swimmers. It means chlorine isn't as abundant as it needs to be to neutralize germs. A pH that is too low means the water is too acidic, which can cause similar bodily irritation and damage to your pool's lining and the surrounding plaster, stone, or tile.

Your contractor will need several days to several weeks as far as a timeline to install your semi-inground pool goes. Adapting an aboveground pool to be semi-inground by excavating and partially burying the liner, for example, will only take three to five days, while installing an in-ground pool with a poured concrete liner and building up the land around it will require several weeks. Keep in mind that the process of hiring a pool contractor and applying for permits can add several additional weeks to the total timeline.

The Columbus, MT homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.