Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Roberts, MT

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Roberts, MT?

Select your specific project to find the pro for you.

Find Above ground pool installation pros in Roberts

Install Above Ground Pools questions, answered by experts

It’s a good idea to wait at least 24 hours after opening your pool before you swim in it. Pool opening often involves shocking the water, and the chemical levels need to come down a bit before it’s safe to swim. You can continue testing your water pH and chlorine levels if you’re in a rush. It’s wise to wait until your chlorine levels drop to under four parts per million (ppm) and you have a water pH of between 7.2 and 7.8. You can artificially lower your water pH to speed up the process.

If your pool takes longer than one or two days to fill, you might be dealing with low water pressure. Using a water pressure gauge on your outdoor tap, you can check your water pressure. A reading of 40 psi or below is considered low. A leak, a nearby water shutoff, or several other reasons could cause this. 

If the water pressure isn’t a problem, you could have a low flow rate from clogs, corroded pipes, or other plumbing issues. It’s best to call in a local plumber to get to the root of the issue.

There are several affordable ways to chill your pool. A pool cover can help prevent the temperature of your pool from rising during the sun. You can also run your filter at night to help aerate the water. The next most wallet-friendly option is a DIY pool chiller or fountain that uses evaporation to cool your pool.

A solar cover can heat your pool anywhere from 5 to 15 degrees Fahrenheit over the course of 6 to 12 hours, depending on how much full sun your pool gets and how big it is. When used in conjunction with a solar pool heater, your pool will heat up even faster, all while using less energy than a traditional pool heater.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.