Top-rated subcontractors.

Get matched with top subcontractors in Smithville, MO

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Smithville, MO?

Select your specific project to find the pro for you.

TRUSTED BY SMITHVILLE, MO HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon1.1k+
    Verified subcontracting services reviews

Find Subcontractors in Smithville

Avatar for Anthony Plumbing, Heating & Cooling
Anthony Plumbing, Heating & Cooling
4.7(
1,467
)

Serving Smithville, MO and surrounding areas

Approved (Corporate)

In business since 1951

Free estimates

Emergency services offered

"The sink had very thick and longtime build-up that was mostly clogging a big section of pipe and not able to be opened with a "snake". Several feet of pipe had to be removed and replaced. Once the occluded piece was removed, Kyle showed me the ends of the pipe after it was removed and why just trying to shift the caked in debris wouldn't work in this case. I appreciated him showing me (including some photos, as I have a crawl space) along with explaining so I had a better understanding. He was considerate in explanations of the work, wearing a mask, punctuality and in cleaning up after."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+38

359 neighbors recently requested a quote
Recommended by94%of homeowners
Avatar for LBA Air Conditioning, Heating & Plumbing, Inc.
LBA Air Conditioning, Heating & Plumbing, Inc.
4.9(
192
)

Serving Smithville, MO and surrounding areas

Approved

Super Service Award Winner

In business since 1985

Free estimates

Emergency services offered

"Originally called for a servicing, unfortunately the parts for my A/C were no longer being made since the coolant had been phased out a year before. Ended up with a great deal on a new system, house is much cooler!"
Refitting Cooper
Measuring new length
Attaching Copper
Attaching Copper
Attaching filter housing

+22

Response time10 mins
Response rate100%
13 neighbors recently requested a quote
Avatar for Decker Service Professionals
Decker Service Professionals
4.5(
56
)

Serving Smithville, MO and surrounding areas

Approved

Super Service Award Winner

In business since 2017

Free estimates

Warranties offered

"I contacted Decker because we had some staining of ceilings in several rooms due to a roof leak. Jason did an excellent job repairing and painting the ceilings and walls. He was easy to work with. I also had the outside of the house painted. Juan and his crew did an excellent job, also. They paid attention to detail and were also easy to work with."
During repair
Exterior after staining
Attaching a new exterior rim joist
Discolored and faded due to weather and sun
Deck detached from inside rim joist.

+66

Response time1 day
Response rate96%
8 neighbors recently requested a quote
Avatar for MHK General Services
MHK General Services
4.5(
73
)

Serving Smithville, MO and surrounding areas

Approved

In business since 2008

Free estimates

Emergency services offered

"MHK General Services did a fabulous job doing a custom build new staircase. The owner , Mark and his team not onlydid everything that they said they would, but they also went above and beyond to Make sure that we were satisfied.. You get great value with the quality of work and fair pricing. I willbe hiring them again for future projects!!"
Response time1 day
26 neighbors recently requested a quote
Recommended by83%of homeowners
...
Showing 1-10 of 617
Subcontractors questions, answered by experts

Costs vary depending on project complexity and scope. Architects generally charge a percentage of the total budget or an hourly rate for their services.

While possible for small projects, professional designers ensure compliance with building codes and structural integrity.

The average build timeline for a home is between six and 12 months, with timelines pushing toward the upper end of that range if you’re creating a custom design or need a lot of land preparation before getting started. Hiring a general contractor or a custom homebuilder will help speed up the process, as you’ll see fewer delays between different parts of the build process getting done.

Universal design costs can be minimal when you add them during construction; however, adding universal design principles to existing homes can sometimes increase renovation costs. For example, a mid-grade bathroom remodel is estimated to cost around $30,000, while a standard universal design remodel can cost closer to $40,000. Adding accessible design components can include widening hallways ($500 to $2,000), curbless showers ($2,000 to $8,000), and widening doors ($400 to $800). Keep in mind that these increased costs can lead to higher resale values because universal homes may appeal to a wider variety of buyers.

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

The Smithville, MO homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"