Top-rated excavation pros.

Get matched with top excavation pros in Lowry City, MO

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Lowry City, MO?

Select your specific project to find the pro for you.

Find Excavation pros in Lowry City

Meiners Mechanical
New to Angi
Building Site - Preparation and ClearingExcavation - Major Grading or Resloping

Serving Lowry City, MO and surrounding areas

Approved

Excavation is in our blood. With over 40 years of hands-on experience, passed down from father to son, we bring unmatched knowledge and work ethic to every job. From small repairs to large-scale projects, no job is too big or too small. We pride ourselves on fair pricing, honest service, and quality work you can trust. When you hire us, you’re getting dependable professionals who stand behind what we do.

Showing 1-10 of 48
Excavating questions, answered by experts

You can dig 60 to 80 linear feet by hand per day depending on the depth. Digging a 100-foot trench by hand will take you two work days, but it can take longer if you have heavy or rocky soil. If you’re digging a deep trench or one that’s over 100 feet, consider renting a mechanical trencher, such as a walk-behind or ride-on, or calling a pro for help. 

While general contractors sometimes handle demolition, you can also look specifically for local demolition contractors. Demolition experts need to understand structural integrity, the equipment needed for safe demolition, and the permits required for demolition.

Hard soil could be a sign of overly dry dirt, either from poor drainage or drought. It's important to test the nutrient levels, density, and drainage capacity of your soil to see if it's absorbing water properly. Begin by adding a light layer of water and observing how long the soil retains moisture. If you experience a good deal of runoff, you may need to aerate your lawn, apply a wetting agent, or hire a professional for a closer look.

Concrete blocks are the cheapest way to base a shed. However, the space in between allows critters to go under, burrow, and even damage your shed’s frame. For a more pest-proof option, consider building a shed base with gravel or paver stones. Both options are fairly affordable and easy enough for a DIY project. For gravel, you can build a wooden frame to contain the loose material.

You can bury underground electrical wire six inches deep—but only if you use a rigid metal electrical conduit. For rigid, non-metallic conduits, bury the wire at least 12 inches deep. If using an underground feeder cable rated for direct burial, you'll need to place it at least 18 inches deep, as it has no conduit for extra protection.

The Lowry City, MO homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.