Top-rated excavation pros.

Get matched with top excavation pros in Urbana, MO

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Urbana, MO?

Select your specific project to find the pro for you.

Find Excavation pros in Urbana

Avatar for Southern Contracting, LLC
Southern Contracting, LLC
5.0(
36
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+2 more

Serving Urbana, MO and surrounding areas

Approved

In business since 2016

Free estimates

Emergency services offered

"Ivan and his team did an outstanding job installing our fence. They were professional, proficient and made me feel like their priority by getting my fence installed in no time. Will highly recommend to anyone and plan on using for future projects! Thanks Ivan!"
6ft chain-link
6' chain-link fence
Privacy fence start
Wrapping up
Interior

+17

Response time1 day
1 neighbors recently requested a quote
Recommended by94%of homeowners
Avatar for TH Excavation
TH Excavation
New to Angi
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping - For Business

Serving Urbana, MO and surrounding areas

Approved

In business since 2021

Free estimates

Offers commercial services

We invite you to experience a tradition of customer satisfaction that will exceed your greatest expectations. Our professionalism and quality workmanship will accurately reflect your taste and liestyle. From conception to completion, we work with you until the job is done. We are ethical, honest, and easy to communicate with.\nCall us today you'll be pleased you did. Thank you.\n

Top soil around sidewalk
1 neighbors recently requested a quote
Stamper Land Services
New to Angi
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+2 more

Serving Urbana, MO and surrounding areas

Approved

In business since 2022

Free estimates

Credit card accepted

Stamper Land Services is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. We have accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business. Full house cleaning, with a 3 hour minimum on service requests.

2 neighbors recently requested a quote
Avatar for Down & Dirty Land Clearing LLC
Down & Dirty Land Clearing LLC
5.0(
11
)
Building Site - Preparation and ClearingExcavation - Major Grading or ReslopingBuilding Site - Preparation and Clearing - For Business+1 more

Serving Urbana, MO and surrounding areas

In business since 2019

Free estimates

Credit card accepted

"For the past two years, Tim and Down & Dirty Land Clearing have done my site work, excavating, and trail making. Excellent workmanship and a clear commitment to safety every step of the way. Tim genuinely cares about doing the job right. I will continue my relationship with Down & Dirty and can comfortably recommend them."
Resort building
Resort building
Resort building
Resort building
Resort building

+5

5 neighbors recently requested a quote
...
Showing 1-10 of 62
Excavating questions, answered by experts

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

You can dig 60 to 80 linear feet by hand per day depending on the depth. Digging a 100-foot trench by hand will take you two work days, but it can take longer if you have heavy or rocky soil. If you’re digging a deep trench or one that’s over 100 feet, consider renting a mechanical trencher, such as a walk-behind or ride-on, or calling a pro for help. 

Digging out a basement takes anywhere from a few days to a few months. Most projects take at least two to five weeks, but it could take several months if you encounter obstacles. This project takes longer if you need to brace or raise your home before the excavation. Digging out a basement in new construction can take as little as three days.

In most areas, you will need a permit for excavation work, even for projects that only involve grading or yard leveling. Permit requirements depend on your local government and the scope of the project, but they are especially common for significant digging or work that could affect utilities or public property. These permits help protect the local topography and prevent drainage issues. An experienced excavation company will typically know whether permits are needed and can often handle the process of pulling and closing them for you. You can also verify permit requirements by contacting your local building department and describing your project.

Hard soil could be a sign of overly dry dirt, either from poor drainage or drought. It's important to test the nutrient levels, density, and drainage capacity of your soil to see if it's absorbing water properly. Begin by adding a light layer of water and observing how long the soil retains moisture. If you experience a good deal of runoff, you may need to aerate your lawn, apply a wetting agent, or hire a professional for a closer look.

The Urbana, MO homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.