Top-rated excavation pros.

Get matched with top excavation pros in Lincoln, MO

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Lincoln, MO?

Select your specific project to find the pro for you.

Find Excavation pros in Lincoln

Avatar for Kuhl-Rock Construction
Kuhl-Rock Construction
New to Angi

Serving Lincoln, MO and surrounding areas

Approved

In business since 2021

Free estimates

Small jobs welcome

leader in providing our customers with the highest quality service in an honest, efficient, and professional way. Our pledge is to create successful relationships with our customers, employees and community by building trust, treating every project with the utmost integrity and exceeding expectations. We look forward to working with you!

Response time1 day
Chism Excavating, LLC - Home Facebook
5.0(
1
)

Serving Lincoln, MO and surrounding areas

In business since 2000

Free estimates

Small jobs welcome

We are a locally owned and operated company that values honesty and integrity in all aspects of our business. Our major focus is on the quality our work and producing outstanding results. We are committed to creating a level of value unmatched by any of our competitors. We look forward to building lasting relationships with our clients and guarantee your satisfaction!

Recommended by100%of homeowners
...
Showing 1-10 of 51
Excavating questions, answered by experts

You can dig 60 to 80 linear feet by hand per day depending on the depth. Digging a 100-foot trench by hand will take you two work days, but it can take longer if you have heavy or rocky soil. If you’re digging a deep trench or one that’s over 100 feet, consider renting a mechanical trencher, such as a walk-behind or ride-on, or calling a pro for help. 

The time it takes to build a pool—and dig out the area—varies based on the pool size and type. A professional excavator will take between four and eight hours to dig a pool. The process will take longer if they encounter large boulders or tree roots. Keep in mind that this is a small part of the process in the long run. You will need between eight and 12 weeks to build a pool from start to finish, including the time to apply for permits.

In the United States, a depth of 36 inches (three feet) for underground water lines is the accepted industry standard. This depth varies from location to location based on local conditions. In areas with colder winters, they may be buried deeper to prevent frozen well water pipes : This is usually at least six inches below the frost level. The International Plumbing Code calls for a minimum of 12 inches below grade.

Skunk digging looks like a series of small, cone-shaped holes on a lawn or around the perimeter of a home, porch, deck, or shed. The holes that skunks dig when searching for grubs tend to be no more than four inches in diameter and may be up to four inches deep.

Digging out a basement takes anywhere from a few days to a few months. Most projects take at least two to five weeks, but it could take several months if you encounter obstacles. This project takes longer if you need to brace or raise your home before the excavation. Digging out a basement in new construction can take as little as three days.

The Lincoln, MO homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.