Masonry brick/stone repair We guarantee your satisfaction and we won’t leave until the job is done right. We pride ourselves on the quality work we provide, while delivering great customer service! Check out our services offered and call or click to schedule a free estimate today.
"1) 4/24/23 - DeGain visited our house to inspect our areas of concern and all the brickwork on the house. Note-brickwork was only on the lower part of the house. Our primary concern was the brickwork facing the front porch, which was the area I first pointed out to Degain.. 2) 4/25/23 - Degain mails an invoice. Item 01 of the invoice is for "Repointing Loose Brick An Holes" for $350. Other items were on the invoice, but they are not in dispute. 3) 4/26/23 - I told DeGain to proceed with the work on the invoice. 4) 5/16/23 - Since we were out of town, DeGain texts me to advise me that all the work was completed. 5) 5/16/23 - I voluntarily sent a check to DeGain for the brickwork, power washes, and poly sand, since I would not return home until 5/26/23 and did not want DeGain to wait for compensation for completed work. 6) 5/26/23 - I returned home an inspected the work completed by DeGain and discovered that the brickwork facing on the porch was not completed. 7) 5/16/23- I took a picture of the uncompleted brickwork facing the front porch and asked DeGain to schedule a date to complete the work. 8) 5/31/23 - DeGain texted back an asks if a 7/17/23 would work and I agree with the date. 9) 7/16/23 - Since were out of town again I texted DeGain to verify that Degain was going to complete the work and giving instructions on how to access our outside water. NO RESPONSE FROM DEGAIN. 10) 7/29/23 - We return home and find that the brickwork was still not completed. A text was sent to DeGain to complete the work as soon as possible. NO RESPONSE FROM DEGAIN. 11) 8/4/23 - I asked DeGain of $250 for the unfinished work. NO RESPONSE FROM DEGAIN 12) 8/11/23 - I sent a text to the DeGain and advised him that I have no choice but to refer the matter to Angi's. NO RESPOSE FROM DEGAIN 13) 8/12/23 - I ask Degain if they intend tomrespond. NO RESPONSE FROM DEGAIN. 14) 9/3/23 - I sent DeGain a partial chronology and advise him that ifwe don't settle this issue quickly, then I will take all necessary steps to resolve this issue. 15) 9/3/23 - DeGain finally responds asking why I'm so upset. He also says that the word "porch" was not on the invoice and therefore he had completed the brick work by repairing i the three bricks for $350. 16) I responded to DeGain that a) He visually inspected the brick work on the front porch and agreed that it needed repair, before the invoice was created. b) I did not ask him to work on the cement front porch, which needed no repair. Rather he was to do "Repointing, Loose brick, An Holes the vast majority was on the bricks facing the front porch. c) If DeGain believed that the brick work facing the front porch was not included, then why did Degain agree to complete the work on 7/16/23, based on a picture of the uncompleted work on the bricks facing the front porch. d) If the brick work facing the front porch was not included a price of $350 to replace the three bricks not facing the front porch is totally unreasonable. NO RESPONSE FROM DEGAIN. 9/7/23 - I contacted Angi's to get an understanding of the Appeal process, but did not file a formal complaint to see if I can resolve the issue with DeGain. 9/14/23 - I sent an email to DeGain advising them that I have contacted Angi's and made one final offer to resolve the issue. NO REPSONSE FROM DEGAIN 10/4/23 - Filed formal complaint with Angi's. Please note that I have the following: 1) A summary chronology with key pictures, documents, etc. 2) A detailed chronology which lists every written interaction with Degain, 3)Hard copies of emails, text screen shots, etc. to substantiate almost all elements o he chronologies. Please let me know where to send them if necessary. Please note that the ratings below are for the brickwork that was never completed only."
Dave K on October 2023
Masonry brick/stone repair We guarantee your satisfaction and we won’t leave until the job is done right. We pride ourselves on the quality work we provide, while delivering great customer service! Check out our services offered and call or click to schedule a free estimate today.
"1) 4/24/23 - DeGain visited our house to inspect our areas of concern and all the brickwork on the house. Note-brickwork was only on the lower part of the house. Our primary concern was the brickwork facing the front porch, which was the area I first pointed out to Degain.. 2) 4/25/23 - Degain mails an invoice. Item 01 of the invoice is for "Repointing Loose Brick An Holes" for $350. Other items were on the invoice, but they are not in dispute. 3) 4/26/23 - I told DeGain to proceed with the work on the invoice. 4) 5/16/23 - Since we were out of town, DeGain texts me to advise me that all the work was completed. 5) 5/16/23 - I voluntarily sent a check to DeGain for the brickwork, power washes, and poly sand, since I would not return home until 5/26/23 and did not want DeGain to wait for compensation for completed work. 6) 5/26/23 - I returned home an inspected the work completed by DeGain and discovered that the brickwork facing on the porch was not completed. 7) 5/16/23- I took a picture of the uncompleted brickwork facing the front porch and asked DeGain to schedule a date to complete the work. 8) 5/31/23 - DeGain texted back an asks if a 7/17/23 would work and I agree with the date. 9) 7/16/23 - Since were out of town again I texted DeGain to verify that Degain was going to complete the work and giving instructions on how to access our outside water. NO RESPONSE FROM DEGAIN. 10) 7/29/23 - We return home and find that the brickwork was still not completed. A text was sent to DeGain to complete the work as soon as possible. NO RESPONSE FROM DEGAIN. 11) 8/4/23 - I asked DeGain of $250 for the unfinished work. NO RESPONSE FROM DEGAIN 12) 8/11/23 - I sent a text to the DeGain and advised him that I have no choice but to refer the matter to Angi's. NO RESPOSE FROM DEGAIN 13) 8/12/23 - I ask Degain if they intend tomrespond. NO RESPONSE FROM DEGAIN. 14) 9/3/23 - I sent DeGain a partial chronology and advise him that ifwe don't settle this issue quickly, then I will take all necessary steps to resolve this issue. 15) 9/3/23 - DeGain finally responds asking why I'm so upset. He also says that the word "porch" was not on the invoice and therefore he had completed the brick work by repairing i the three bricks for $350. 16) I responded to DeGain that a) He visually inspected the brick work on the front porch and agreed that it needed repair, before the invoice was created. b) I did not ask him to work on the cement front porch, which needed no repair. Rather he was to do "Repointing, Loose brick, An Holes the vast majority was on the bricks facing the front porch. c) If DeGain believed that the brick work facing the front porch was not included, then why did Degain agree to complete the work on 7/16/23, based on a picture of the uncompleted work on the bricks facing the front porch. d) If the brick work facing the front porch was not included a price of $350 to replace the three bricks not facing the front porch is totally unreasonable. NO RESPONSE FROM DEGAIN. 9/7/23 - I contacted Angi's to get an understanding of the Appeal process, but did not file a formal complaint to see if I can resolve the issue with DeGain. 9/14/23 - I sent an email to DeGain advising them that I have contacted Angi's and made one final offer to resolve the issue. NO REPSONSE FROM DEGAIN 10/4/23 - Filed formal complaint with Angi's. Please note that I have the following: 1) A summary chronology with key pictures, documents, etc. 2) A detailed chronology which lists every written interaction with Degain, 3)Hard copies of emails, text screen shots, etc. to substantiate almost all elements o he chronologies. Please let me know where to send them if necessary. Please note that the ratings below are for the brickwork that was never completed only."
Dave K on October 2023
At Fishers Design we know all about the waiting list of people trying to get things done that's why when we say we're going to be there we are no excuses. We take pride in our skills and detail in our work. Most of the time we find customers that become life long friend. How can we assist you with your next project?
At Fishers Design we know all about the waiting list of people trying to get things done that's why when we say we're going to be there we are no excuses. We take pride in our skills and detail in our work. Most of the time we find customers that become life long friend. How can we assist you with your next project?
Hello! We stand out by being available in a short times notice in almost any region. If you are looking for any type of cleaning work in prep of the spring season reach out to [email protected] for 50% off.
Hello! We stand out by being available in a short times notice in almost any region. If you are looking for any type of cleaning work in prep of the spring season reach out to [email protected] for 50% off.
You buy it we build it, we assemble outdoor furniture, play structures, sheds, gazebos. Our company is insured and provides on-site assembly services. Servicing residential and business customers in Macomb, Oakland, and Wayne Counties. The mission of our company is to build long-term relationships with our clients by providing quick yet professional services and exceptional client support.
You buy it we build it, we assemble outdoor furniture, play structures, sheds, gazebos. Our company is insured and provides on-site assembly services. Servicing residential and business customers in Macomb, Oakland, and Wayne Counties. The mission of our company is to build long-term relationships with our clients by providing quick yet professional services and exceptional client support.
Landscape design and installation with ecology and sustainability at the center. We specialize in combining native species with fruit and nut trees to create a perennial food forest that feeds you and the bees. We design our perennial systems in accordance with ecological principals using permaculture and agroforestry practices.
Landscape design and installation with ecology and sustainability at the center. We specialize in combining native species with fruit and nut trees to create a perennial food forest that feeds you and the bees. We design our perennial systems in accordance with ecological principals using permaculture and agroforestry practices.
We do everything from foreclosure cleanouts to staining decks to mowing yards to cleaning windows
We do everything from foreclosure cleanouts to staining decks to mowing yards to cleaning windows
We strive to satisfy all of our customers and will go the extra mile to make sure you're completely satisfied. Our team of skilled electrician provide quality workmanship and excellent customer service to ensure your home is well-maintained and fully functional. (Philippians 4:13❤) I can do all things through Him, who strengthens me.
"The tech was professional. On time came in and completed the task with in a reasonable time and left the area clean."
Paula J on June 2025
We strive to satisfy all of our customers and will go the extra mile to make sure you're completely satisfied. Our team of skilled electrician provide quality workmanship and excellent customer service to ensure your home is well-maintained and fully functional. (Philippians 4:13❤) I can do all things through Him, who strengthens me.
"The tech was professional. On time came in and completed the task with in a reasonable time and left the area clean."
Paula J on June 2025
Mowing and trimming lawns
Mowing and trimming lawns
Helping homeowners and cottagers find awesome outdoor products that enrich their lives, and provide value and equity to their homes!
Helping homeowners and cottagers find awesome outdoor products that enrich their lives, and provide value and equity to their homes!
The average cost of an outdoor kitchen is around $15,500. However, since outdoor kitchens are highly customizable, you could spend anywhere from $5,000 to over $50,000 for your setup. Some important factors that can affect your pricing include the size of the kitchen, the materials you use—specifically for the countertop—the type of grill you want, and any add-on products you want coupled with your installation.
No, even if you have a vague idea of what you want, it’s a good idea to reach out to a contractor that specializes in outdoor kitchens for assistance. Professionals who have constructed kitchens for other homeowners can not only help you think about the functionality and convenience of your outdoor space—which many homeowners neglect—but they can also help you choose high-quality, durable materials that meet your budget and match the rest of your outdoor space. In fact, it’s often better to contact a contractor and get the ball rolling before you have a solidified plan for your outdoor kitchen.
Yes, outdoor kitchens usually deliver around a 50% ROI in terms of home value. This is lower than some home improvement projects, but combined with the utility you enjoy yourself, most homeowners find it well worth the investment. The specific bump in property value you’ll see from your outdoor kitchen depends on the size and quality, as well as how much usable yard space it takes up.
In many cases, you will not need permits to install an outdoor kitchen because it’s not usually considered a permanent structure and doesn’t require a foundation. If you run natural gas lines to a grill, plumbing lines to an outdoor sink, or electrical lines for lighting and power, your contractor will likely need to pull permits.
However, every municipality is different, so you should defer to a professional outdoor kitchen contractor to confirm which portions of your outdoor kitchen project require building permits.