Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Mackay, ID

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Mackay, ID?

Select your specific project to find the pro for you.

Find Above ground pool installation pros in Mackay

Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,688
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Mackay, ID and surrounding areas

In business since 1971

Credit card accepted

"One oven doesn't work at all ( my choice, see above), the "working" oven was never calibrated properly so using it is hit or miss. It's time to call American Home Shield to see about replacing the entire unit. I'm waiting to finish other home projects before calling them. I don't know if I'll request Greenway again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Install Above Ground Pools questions, answered by experts

Yes, they provide full-service inspections, identifying and resolving any potential equipment problems.

An in-ground swimming pool enhances property value by adding a luxurious aesthetic and functional feature. It appeals to potential homebuyers who value outdoor entertainment and relaxation spaces, thus raising market desirability.

The best paver for your pool deck depends on your budget, style, and how much maintenance you’re willing to invest. Granite is one of the best low-cost pavers for pool decks. It’s very slip-resistant and durable, too, making it a top pick. Travertine is a high-quality material that resists freeze-thaw cycles, looks stunning, and won’t get hot in the summer. The only downside to travertine is that it costs more than granite.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

There are several affordable ways to chill your pool. A pool cover can help prevent the temperature of your pool from rising during the sun. You can also run your filter at night to help aerate the water. The next most wallet-friendly option is a DIY pool chiller or fountain that uses evaporation to cool your pool.

The Mackay, ID homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.