Top-rated above ground pool installation pros.

Best above ground pool installation pros near Arco, ID

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Arco, ID?

Select your specific project to find the pro for you.

Top-Rated Above ground pool installation pros in Arco - Updated Nov 2026

Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,689
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Arco, ID and surrounding areas

In business since 1971

Credit card accepted

"One oven doesn't work at all ( my choice, see above), the "working" oven was never calibrated properly so using it is hit or miss. It's time to call American Home Shield to see about replacing the entire unit. I'm waiting to finish other home projects before calling them. I don't know if I'll request Greenway again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Install Above Ground Pools FAQs, answered by experts

In-ground pools lose water naturally due to wind, heat, and humidity. They also lose water from the kiddos' cannonball competitions. But be mindful of the water level. If it drops too low and the pump draws in air instead of water, it will likely be damaged and require repair or replacement.

Installing an infinity pool takes up to 12 weeks. It can take as long as 20 weeks if you have a complex design, are building a pool in an inaccessible area, or face weather-related construction delays. Either way, this is a big job that requires a lot of time and labor to get it right. Pool construction is not a job that should be rushed, as poor installation can lead to expensive recurring repair costs. 

Shock can clear a cloudy pool if the problem is insufficient free chlorine or an accumulation of chloramines from “spent” chlorine. However, it can make the issue worse if a high level of chlorine or a pH imbalance is the root cause of the problem. Test your pool water before treating the cloudiness to ensure you’re making the right call.

Building a pool yourself will take at least eight to 12 weeks. After all, this is the building timeline after hiring a pool contractor who knows how to draw up plans, analyze your landscape, and apply for proper permits. If you choose to tackle any part of the process alone, assume building a pool will take two to three months at a minimum.

The most expensive part of building a pool is typically the excavation and labor, which can account for 25% to 50% of the total project cost. This is particularly true for inground pools that require significant excavation, potentially including the rental of large equipment, and extensive construction labor. In contrast, above-ground pools are generally less expensive as they typically do not require excavation and can be installed much more quickly. Concrete in-ground pools are among the most labor-intensive options.

The Arco, ID homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.