Install Above Ground Pools questions, answered by experts

Technically, you can fill in a pool yourself—with the caveat that filling in a pool requires the ability to drain the pool properly and move a substantial amount of dirt, which aren’t beginner DIY skills. If you want to fill in a pool, you’re better off hiring a local pool removal professional.

A swimming pool pump has to have water in it to run properly. If the pump isn’t primed and tries to run when it’s dry, the components will overheat which can cause the pump to seize up and can even damage the PVC pipes that carry the water into and out of it. Essentially, running a pump that isn’t primed can lead to having to replace the entire pump.

The process involves designing the pool, obtaining necessary permits, excavating, installing plumbing and electrical components, configuring the pool's structure and lining, and finally completing landscaping and decking for integrated aesthetics.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

Remodel costs vary, often 50-70% of new construction costs, depending on remodeling depth and choices for feature additions or modifications.

The Roberts, ID homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.