Top-rated drywall pros.

Get matched with top drywall pros in Hauser, ID

Enter your zip and get matched with up to 5 pros

Need a pro for your drywall service project in Hauser, ID?

Select your specific project to find the pro for you.

TRUSTED BY HAUSER, ID HOMEOWNERS

  • Average homeowner rating star icon4.7
    Average homeowner rating
  • Verified reviews icon148
    Verified drywall services reviews

Find Drywall pros in Hauser

Pend Oreille Builders LLC
4.5(
1
)
Drywall - InstallDrywall - Repair

Serving Hauser, ID and surrounding areas

Approved

In business since 2023

Free estimates

Credit card accepted

Pend Oreille Builders LLC We take great pride in our experience, expertise, quality, and customer service that we provide to meet the consumer's needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on service, safety, and quality, regardless of how large or small the job.\n\n\n\n\n

Recommended by100%of homeowners
Avatar for True Forge Remodeling LLC
True Forge Remodeling LLC
5.0(
4
)
Drywall - Repair

Serving Hauser, ID and surrounding areas

Approved

In business since 2025

Free estimates

Credit card accepted

"I have been looking for someone reliable, knows what they are doing and affordable for a very long time. Ivan is that guy. I will continue to use his services, I highly recommend Ivan and his company!!!!"
19 neighbors recently requested a quote
Avatar for JMG Handyman Services LLC
JMG Handyman Services LLC
4.5(
8
)
Drywall - RepairDrywall - Repair - For Business

Serving Hauser, ID and surrounding areas

Approved

In business since 2024

Free estimates

Credit card accepted

"John and his team replaced our shower in our master bath and the job was done great and efficient! I would definitely hire him again for any of my other home repair needs!! The job was done in less than 3 days and they kept everything clean. Great job! Highly recommended!"
Response time1 day
4 neighbors recently requested a quote
...
Showing 1-10 of 125
Drywall questions, answered by experts

To hide drywall edges, you need to properly apply drywall tape and multiple layers of joint compound. These materials hide the seams between drywall sheets and fill the holes from drywall screws, leaving behind a smooth, flat finish to paint over. Apply joint compound smoothly, and finish the job by sanding the walls to make sure you fully hide drywall edges and other imperfections.

If you don’t have studs in the area where you want to install your TV mount, you may still be able to install a TV mount on drywall. The easiest way to install a mount on drywall is by using drywall anchors—but not just any plastic anchors. Choose molly bolts or toggle anchors, which have a weight capacity of around 50 pounds. For added support, consider pairing drywall anchors with a wall mounting plate. Extra heavy TVs may need to be mounted via the ceiling joists or beams.

Most repairs take 1-3 days, depending on drying times for joint compound and paint touch-ups.

You should wait at least 24 hours for drywall mud to dry before sanding or applying another coat. However, the exact drying time depends on several factors, including the thickness of the application, room temperature, humidity, and the type of compound used. Thicker layers, or projects in high humidity, may require 48 hours or more. Lightweight compounds tend to dry faster than heavier, all-purpose ones. You'll know the mud is ready when it feels completely dry and firm to the touch and has changed to a consistent light color. Sanding too early can cause smudging or gouges, so patience is essential for a smooth finish.

While every home has its own unique needs, ceiling drywall installation typically follows a staggered or stepped pattern to enhance structural integrity and reduce the visibility of seams. Starting from one corner, sheets are placed perpendicular to the ceiling joists, with the ends of adjacent sheets meeting along the center of the joist. The next row begins with a half sheet, ensuring joints don't align vertically. This alternating pattern, combined with proper taping and mudding, creates a seamless appearance and strengthens the ceiling structure, minimizing the risk of cracks over time.

The Hauser, ID homeowners’ guide to drywall services

From average costs to expert advice, get all the answers you need to get your job done.