Top-rated subcontractors.

Get matched with top subcontractors in Appling, GA

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Appling, GA?

Select your specific project to find the pro for you.

TRUSTED BY APPLING, GA HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon2.5k+
    Verified subcontracting services reviews

Find Subcontractors in Appling

Avatar for Mike's Painting & Pressure Washing
Mike's Painting & Pressure Washing
4.7(
28
)
Major Home Repairs (General Contractor)

Serving Appling, GA and surrounding areas

In business since 1996

Emergency services offered

Credit card accepted

"I would highly recommend this business.  We had them come and restain the deck and at first just powerwash the house.  They scheduled the work right away.  After doing the pressure washing, there were some areas with paint chips under the soffit.  Mike offered to repaint those for free.  During this, they noticed areas of the soffit that were rotten, so we had them repair those areas of the wood.  They also fixed a few screens that were damaged during the pressure washing for free.  
Everything turned out great, and we are very happy we had this work done.  Mike and Crystal are very professional and easy to work with.  I will be having them do some more work on our house in the near future.
"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+161

Recommended by91%of homeowners
Avatar for Luis Construction
Luis Construction
5.0(
5
)
Major Home Repairs (General Contractor)

Serving Appling, GA and surrounding areas

"They installed my vinyl floors in one morning and did an amazing job! They were efficient, polite, and high quality work, will definitely work with them again."
Response time3 days
Response rate100%
Recommended by100%of homeowners
Avatar for Spencer Meyn Construction
Spencer Meyn Construction
5.0(
4
)
Major Home Repairs (General Contractor)

Serving Appling, GA and surrounding areas

In business since 2013

Emergency services offered

"Spencer was great to work with. I had several projects that needed to be completed in preparation of selling my home. He gave a thorough quote. Communiation was excellent. He kept all of his time commitments. And the work was great. Highly recommend!!!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+72

Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Major Home Repairs (General Contractor)

Serving Appling, GA and surrounding areas

In business since 2006

Credit card accepted

"The man I talked to was very professional and timely. However, he explained that this particular job was beyond the scope of what their company does. I would certainly use them on another 'issue'.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 46
Subcontractors questions, answered by experts

It usually takes around four to six months to build and install a modular home, although your timeline could go up to around eight months if there are delays in the manufacturing or permitting process. Heavy site preparation and foundation pouring can extend that timeline if you need them, as can customizations you want for your modular home. Your modular home company should be able to provide an estimate for the construction timeline before you sign any contracts or agree to any work.

Costs depend on desk size, labor, included features like drawers or motorized height adjustments, and required wall anchoring.

Adequate storage, workspaces, and energy-efficient systems are key considerations.

The longest part of building a custom home is the design phase. It takes multiple professionals and a ton of work to bring your vision for your dream home to life while sticking to a homebuilding budget and also ensuring everything is built to code. Expect the design phase for a custom home build to take six months to a year.

While it’s never too early to start planning for a major home improvement project like a home addition, give yourself at least a month or two to plan and design your addition, find a contractor, and get the permits in order. For larger projects like a second-story addition that require designing with an architect, plan on three to four months of preparation.

The Appling, GA homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.