Top-rated backsplash installation pros.

Get matched with top backsplash installation pros in Pittsview, AL

Enter your zip and get matched with up to 5 pros

Need a pro for your backsplash installation project in Pittsview, AL?

Select your specific project to find the pro for you.

TRUSTED BY PITTSVIEW, AL HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon18
    Verified backsplash installation services reviews

Find Backsplash installation pros in Pittsview

Avatar for Floorworks LLC
Floorworks LLC
5.0(
8
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For Business

Serving Pittsview, AL and surrounding areas

In business since 2000

Free estimates

Credit card accepted

"Great from start I was helped with choice of flooring in the store I was able to compare the coloring with my furniture and it is beautiful. The workers was polite they refused my offer for breakfast got right to work I had a bed that had to be unassembled no problem completed the job in a very timely manner. Reassemble the bed ,some one checked the work then they Cleaned everything afterwards and left unused pieces with me."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+17

Recommended by100%of homeowners
Avatar for Dream Baths Of Alabama
Dream Baths Of Alabama
4.1(
74
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For Business

Serving Pittsview, AL and surrounding areas

In business since 1992

Free estimates

"Great.  I had this work done just over a year ago (should have submitted review sooner).
Estimate.  Charlie examined bathroom, had plenty of samples of options to review, and provided firm fixed quote.  There were some material issues that I'll note below.  At no time did the final cost change.
Timeline.  Installation began about a month or so after I accepted the quote and paid half down for material.  I think Charile was ready in about 2 weeks, but I had business travel.  Working together to find a common acceptable period for installation was easy.
Installation.  The first day Charlie showed up with a crew of 4 to take care of the electrical work (did have another ceiling fan installed) and demolition.  Following that, there were 2 full time workers on site.  They worked long hours, well over 8 hour days.  Normall, the job would have taken about a week.  I'll give more detail on the one issue below that drew the task out longer.  The guys were good about taking care not to impact the rest of the house (carpet, etc.).  After install, they did a good job cleaning up.
During the install, there were a few minor options ... how to frame the door, orientation of tile, the color of the tile, etc.  The crew provided options and good advice (I'm no kind of interior decorator).  The part of the service was excellent.
Quality.  I have done basic carpentry and electrical work.  I believe the quality of the work to be good to excellent, both what you see and what was done "behind the dry wall."  The work that you can see is excellent.
Material.  I was a little worried about the material used for the walls as opposed to tile.  I'm pleased to say I'm more than happy with the "acrylic" (I think that's correct) walls as well as base and door.
Only issue.  The base received was not the correct one.  The second base received had a quality issue.  They guys pointed this out to me.  I'm sure it cost them money out of their pocket / profit to spend the extra time on site.  My take away from this was the guys were MY quality advocates and did what was necessary to ensure the highest quality product was used and the job was done right the first time!  Things happen.  The question is how well does your contractor support you.  While I wasn't crazy about the delay (about 3 days, not major for me).  I was thrilled the issue was immediately brought to my attention and resolved even though it took extra effort on their part.
Overall job outcome.  I feel what was quoted was provided.  Very satisfied.
1 year review ... I remain satisfied.  I have had zero issues.  Other than the glass doors (which are famous for requiring cleaning when used for bath doors - this was noted before installation).  Is the biggest maintenance job.  Caring for the bath itself has required average to minimal effort.
Give Dream Bath / Charlie a call before you have your bathroom remodeled!
"
Dream Baths

+15

Recommended by82%of homeowners
...
Showing 1-10 of 63
Backsplash Installation questions, answered by experts

It’s best to start with tiling the shower floor before moving on to the walls for the most visually-pleasing results. When taking on any tiling project, you’ll want the wall tiles to “sit” neatly on the floor tiles rather than overlapping them. Finishing your floor tiles first will allow you to place your wall tiles without any gaps, holes, or awkward intersections.

The tile spacing you should use will depend on the tile and where you’re installing it. Choosing the right tile spacers to maintain a consistent gap between your tiles is tricky. Generally, tile spacing shouldn’t be less than 2 millimeters on walls and 3 millimeters on floors because of stress relief requirements. Getting it wrong can result in uneven tiles and early repairs.

Tile installation can be expensive because it requires more time and labor to install than many other materials. For example, laminate flooring can click and lock into place, and carpet comes in large rolls that you can secure to the floor. On the other hand, tiles need to be cut, laid individually, grouted, and left to cure.

No, painting shower tile doesn’t last and is better reserved as a temporary solution to refreshing the look of old tiles. Shower tile paint may last around one to five years, depending on how well you prep the surface before painting, the type of paint you use, the type of tile in your shower, and how often you use the shower.

Installing kitchen countertop tiles on a mold and moisture-resistant cement backer board is one of the best options. When fitted correctly on top of a plywood base, it’s stable and long-lasting. Old-fashioned cement board is economical, cuts neatly and easily with a circular or jigsaw, and screws into plywood without any difficulty.

The Pittsview, AL homeowners’ guide to backsplash installation services

From average costs to expert advice, get all the answers you need to get your job done.