Top-rated backsplash installation pros.

Get matched with top backsplash installation pros in Fort Mitchell, AL

Enter your zip and get matched with up to 5 pros

Need a pro for your backsplash installation project in Fort Mitchell, AL?

Select your specific project to find the pro for you.

TRUSTED BY FORT MITCHELL, AL HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon87
    Verified backsplash installation services reviews

Find Backsplash installation pros in Fort Mitchell

Avatar for Floorworks LLC
Floorworks LLC
5.0(
8
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For Business

Serving Fort Mitchell, AL and surrounding areas

In business since 2000

Free estimates

Credit card accepted

"Great from start I was helped with choice of flooring in the store I was able to compare the coloring with my furniture and it is beautiful. The workers was polite they refused my offer for breakfast got right to work I had a bed that had to be unassembled no problem completed the job in a very timely manner. Reassemble the bed ,some one checked the work then they Cleaned everything afterwards and left unused pieces with me."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+17

Recommended by100%of homeowners
Avatar for Dream Baths Of Alabama
Dream Baths Of Alabama
4.1(
74
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For Business

Serving Fort Mitchell, AL and surrounding areas

In business since 1992

Free estimates

"Great.  I had this work done just over a year ago (should have submitted review sooner).
Estimate.  Charlie examined bathroom, had plenty of samples of options to review, and provided firm fixed quote.  There were some material issues that I'll note below.  At no time did the final cost change.
Timeline.  Installation began about a month or so after I accepted the quote and paid half down for material.  I think Charile was ready in about 2 weeks, but I had business travel.  Working together to find a common acceptable period for installation was easy.
Installation.  The first day Charlie showed up with a crew of 4 to take care of the electrical work (did have another ceiling fan installed) and demolition.  Following that, there were 2 full time workers on site.  They worked long hours, well over 8 hour days.  Normall, the job would have taken about a week.  I'll give more detail on the one issue below that drew the task out longer.  The guys were good about taking care not to impact the rest of the house (carpet, etc.).  After install, they did a good job cleaning up.
During the install, there were a few minor options ... how to frame the door, orientation of tile, the color of the tile, etc.  The crew provided options and good advice (I'm no kind of interior decorator).  The part of the service was excellent.
Quality.  I have done basic carpentry and electrical work.  I believe the quality of the work to be good to excellent, both what you see and what was done "behind the dry wall."  The work that you can see is excellent.
Material.  I was a little worried about the material used for the walls as opposed to tile.  I'm pleased to say I'm more than happy with the "acrylic" (I think that's correct) walls as well as base and door.
Only issue.  The base received was not the correct one.  The second base received had a quality issue.  They guys pointed this out to me.  I'm sure it cost them money out of their pocket / profit to spend the extra time on site.  My take away from this was the guys were MY quality advocates and did what was necessary to ensure the highest quality product was used and the job was done right the first time!  Things happen.  The question is how well does your contractor support you.  While I wasn't crazy about the delay (about 3 days, not major for me).  I was thrilled the issue was immediately brought to my attention and resolved even though it took extra effort on their part.
Overall job outcome.  I feel what was quoted was provided.  Very satisfied.
1 year review ... I remain satisfied.  I have had zero issues.  Other than the glass doors (which are famous for requiring cleaning when used for bath doors - this was noted before installation).  Is the biggest maintenance job.  Caring for the bath itself has required average to minimal effort.
Give Dream Bath / Charlie a call before you have your bathroom remodeled!
"
Dream Baths

+15

Recommended by82%of homeowners
Avatar for Do It All Davison
Do It All Davison
4.6(
11
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For BusinessTile: Natural Stone (Granite, Marble, Slate, Quartz, etc) - Install

Serving Fort Mitchell, AL and surrounding areas

In business since 2017

Free estimates

Offers commercial services

"I didnâ t know the best way to describe all the work that Mr. Davison has done for me. He has came in and replaced a front door, installed new windows, and sheetrocked for me. Heâ s come in time of me panicking to get the house in order. Heâ s picked up supply orders Iâ ve made last minute (I procrastinated ordering a front door). Heâ s always consistent with showing up. He works proficiently and has updated me with progress photos when I havenâ t been home to see the work being done. I feel like his work and his cost is honest. He charges for the love of the job and not to pull one over on you. He has been trustworthy and respectful to my wishes and visions of my home remodel."
New Fence
New Fence
New Fence
New Fence
Repaired Fence

+12

Response time7 hrs
Recommended by90%of homeowners
...
Showing 1-10 of 88
Backsplash Installation questions, answered by experts

When working on your bathroom floor tiling, you should always tile the floor first and then refit the toilet afterward. This has both practical and visual advantages—the tile will have a better seal, and the installation will look cleaner.

On the other hand, when you try to cut the tiles to fit around the toilet, you’re putting yourself at a disadvantage. It’s a lot more work, it’s hard to be precise, and mistakes or miscalculations can lead to future moisture damage to the tiling, grout, and subfloor.

You can technically install tile over tile, but we don’t suggest it. Installing tile over any surface that isn’t a completely flat and prepared subfloor will result in a shoddy overall job, uneven flooring, tiles that don’t adhere, extra weight, gaps, cracks, and room for moisture and dirt to enter. For the best results, only install new tile on a flat, sanded surface like subflooring or concrete that is prepared for tile.

If you have asbestos tile and would rather tile over it than remove it, or if your existing tile is completely flat and bonded tightly to the floor, you may be able to tile over existing tile. But experts recommend thinking twice before you do.

You can often find many types of peel and stick tile at big-box home improvement stores. Other places to shop for this type of material include home decor websites, other types of big-box stores, and even directly from the manufacturer. It’s a good idea to order a tile sample first to see how you like the look and feel before installing it.

Add a T-shaped spacer to each corner of a tile when placing it. You’ll want to nudge the tiles closer together so the spacers are touching each corner. When you’re done installing your tile, you can remove each spacer, wash them, and use them for your next project.

Tile floor installation usually takes about 16 hours of active work along with a couple of days of drying time between tile and grout applications.

The amount of time it takes your installer will depend on many factors, including the square footage of the space, the tile material type, and if they need to make intricate tile cuts.

The Fort Mitchell, AL homeowners’ guide to backsplash installation services

From average costs to expert advice, get all the answers you need to get your job done.