Get matched with top backsplash installation pros in Flat Rock, AL

Flat Rock homeowners rate backsplash installation pros in our network

4.7

(22 reviews)

Top-rated backsplash installation pros.

Need a pro for your backsplash installation project in Flat Rock, AL?

Select your specific project to find the pro for you.

Find Backsplash installation pros in Flat Rock

Avatar for Precision Tile, Trim and Flooring
Precision Tile, Trim and Flooring
5.0(
9
)

Serving Flat Rock, AL and surrounding areas

Approved

Free estimates

Warranties offered

Small jobs welcome

"Ryan has completed several projects for us everything from a full bathroom remodel to new flooring, sheetrock installation and repair, floor leveling, mounting big‑screen TVs, and installing ceiling fans. He truly can do it all, and his pricing is always fair. What really sets Ryan apart is his honesty and integrity. He’ll tell you when something doesn’t need to be done or if there’s a more cost‑effective way to approach a project. That kind of transparency is rare, and why we trust him with every job. He is reliable, skilled, and genuinely trustworthy. I highly recommend Ryan!"
Custom tile shower
Tile shower
Completed Projects
Completed Projects
Completed Projects

+7

1 neighbors recently requested a quote
Wilber Flooring
5.0(
1
)

Serving Flat Rock, AL and surrounding areas

Approved

In business since 2015

Free estimates

Offers commercial services

Wilber Floors is committed to excellence every aspect of our business. We uphold a standard of integrity bound by fairness, honesty and responsibility in all of our jobs. We are a locally owned and operated business with more than 5 years of experience serving AL and surrounding areas. There is no job too big, or too small for our team. Call today and let us put our experience to work for you!\n

Recommended by100%of homeowners
Avatar for Dream Baths Of Alabama
Dream Baths Of Alabama
4.1(
74
)

Serving Flat Rock, AL and surrounding areas

In business since 1992

Free estimates

"Great.  I had this work done just over a year ago (should have submitted review sooner).
Estimate.  Charlie examined bathroom, had plenty of samples of options to review, and provided firm fixed quote.  There were some material issues that I'll note below.  At no time did the final cost change.
Timeline.  Installation began about a month or so after I accepted the quote and paid half down for material.  I think Charile was ready in about 2 weeks, but I had business travel.  Working together to find a common acceptable period for installation was easy.
Installation.  The first day Charlie showed up with a crew of 4 to take care of the electrical work (did have another ceiling fan installed) and demolition.  Following that, there were 2 full time workers on site.  They worked long hours, well over 8 hour days.  Normall, the job would have taken about a week.  I'll give more detail on the one issue below that drew the task out longer.  The guys were good about taking care not to impact the rest of the house (carpet, etc.).  After install, they did a good job cleaning up.
During the install, there were a few minor options ... how to frame the door, orientation of tile, the color of the tile, etc.  The crew provided options and good advice (I'm no kind of interior decorator).  The part of the service was excellent.
Quality.  I have done basic carpentry and electrical work.  I believe the quality of the work to be good to excellent, both what you see and what was done "behind the dry wall."  The work that you can see is excellent.
Material.  I was a little worried about the material used for the walls as opposed to tile.  I'm pleased to say I'm more than happy with the "acrylic" (I think that's correct) walls as well as base and door.
Only issue.  The base received was not the correct one.  The second base received had a quality issue.  They guys pointed this out to me.  I'm sure it cost them money out of their pocket / profit to spend the extra time on site.  My take away from this was the guys were MY quality advocates and did what was necessary to ensure the highest quality product was used and the job was done right the first time!  Things happen.  The question is how well does your contractor support you.  While I wasn't crazy about the delay (about 3 days, not major for me).  I was thrilled the issue was immediately brought to my attention and resolved even though it took extra effort on their part.
Overall job outcome.  I feel what was quoted was provided.  Very satisfied.
1 year review ... I remain satisfied.  I have had zero issues.  Other than the glass doors (which are famous for requiring cleaning when used for bath doors - this was noted before installation).  Is the biggest maintenance job.  Caring for the bath itself has required average to minimal effort.
Give Dream Bath / Charlie a call before you have your bathroom remodeled!
"
Dream Baths

+15

Recommended by82%of homeowners
Avatar for Maven Group LLC
Maven Group LLC
4.7(
13
)

Serving Flat Rock, AL and surrounding areas

In business since 2014

Free estimates

Emergency services offered

"I couldn’t be happier with the patio and sidewalk that the Maven Group installed at my home. It has a stamped concrete finish. They were very professional and helpful in guiding me through the decisions with the project. The patio and sidewalk look great and they left things in great shape when they left - pressure washed and repaired any tracks from the equipment (seeded and strawed). As an added bonus- my point-of-contact initially as well as the crew performing the work were all very nice and helpful. For reference: I should say that they actually removed and replaced a patio and sidewalk that another company did an unbelievably poor job on (and on that note: I would NOT recommend Austin Stamp Crete, Color Scapes, Inc., or Grant Parker DBA as either). So having such a bad experience with the first installation by another company, I was overly cautious with this one and had LOTS of questions. Everyone at Maven was very patient with all my questions. I recieved a recommendation for the Maven Group from a friend and would also recommend them to anyone else needing concrete work so am writing this review. I just wish I had found them sooner!"
Recommended by100%of homeowners
Avatar for Stiles Roofing & Construction
Stiles Roofing & Construction
4.9(
7
)

Serving Flat Rock, AL and surrounding areas

In business since 1999

Free estimates

Emergency services offered

"Ron Stiles and his crew do an amazing job. We have been using them for over 10 years. I would highly recommend anybody needing a roof repair or a roof replacement to call them. Their awesome!!!"
Roofing Project
Roofing Project
Additional Photos
Additional Photos
Additional Photos

+9

Recommended by100%of homeowners
Avatar for Steinwinter Construction LLC
Steinwinter Construction LLC
4.2(
9
)

Serving Flat Rock, AL and surrounding areas

In business since 2001

Emergency services offered

"They showed up as promised ready to work. Took about 3 hours to install electric roof vent fan and blow in some additional insulation. Professional, courteous, and knowledgeable. Would use them again for future projects."
Handyman Services Project
Flooring
Flooring
Handymen Project
Front step , 4x4 coulums

+113

Recommended by87%of homeowners
...
Showing 1-10 of 65
Backsplash Installation questions, answered by experts

Glass tile can cost as much as or more than other durable tile types. When choosing the right tile for you, knowing the advantages and disadvantages of each can help you make an informed decision. The pros and cons of glass tile include:

Pros

  • Light-reflecting to add brightness

  • Waterproof and mold-resistant

  • Made from recyclable materials 

Cons

  • High cost compared to similar and more durable materials

  • Usually requires professional installation

  • More easily scratched compared to materials like ceramic and porcelain

As long as you follow the instructions on your peel-and-stick tile packaging, it should not damage your walls. A possible instance when you may accidentally damage your walls is if you install tiles improperly using additional adhesives that aren’t recommended.

Also, you can damage your walls if you’re not careful when removing tile. For example, you could accidentally make holes in the drywall with a paint scraper if you don’t heat the adhesive long enough before trying to pry it off.

You should always use caulk instead of grout where the tile meets the wall. This will help your tile installation look great and last a long time. When you accidentally use grout for the corner seams, you end up making the tiles too rigid. So as the wall shifts over time, your tiles have no wiggle room. This can lead to tile damage, which will eventually require you to do at least a partial reinstallation.

A cement backer board is not needed for laying tile on concrete. Sometimes referred to as a cementitious backer unit, or CBU, backer board should be used if the subfloor is plywood or OSB. The backer board provides a base on which to install the tiles that isn’t as likely to be damaged by any accidental water seepage as natural materials would be.

Once cracks appear, it is hard to stop tiles from cracking more. If the cause of the problem is improper subflooring, underlying concrete, improper tile joint sizes, mold growth, or structural issues, the only way to stop floor tiles from cracking is to redo the entire floor, fixing the underlying issues first. If cracks occur after impact damage, hiring a professional tile contractor to replace the cracked tiles, fix loose floor tiles, and restore the grout around them can prevent further damage. It is also important to keep your tile and grout clean and maintained to prolong its life.

The Flat Rock, AL homeowners’ guide to backsplash installation services

From average costs to expert advice, get all the answers you need to get your job done.