Top-rated backsplash installation pros.

Get matched with top backsplash installation pros in Bryant, AL

Enter your zip and get matched with up to 5 pros

Need a pro for your backsplash installation project in Bryant, AL?

Select your specific project to find the pro for you.

TRUSTED BY BRYANT, AL HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon59
    Verified backsplash installation services reviews

Find Backsplash installation pros in Bryant

Avatar for Precision Tile, Trim and Flooring
Precision Tile, Trim and Flooring
5.0(
9
)

Serving Bryant, AL and surrounding areas

Approved

Free estimates

Warranties offered

Small jobs welcome

"Ryan has completed several projects for us everything from a full bathroom remodel to new flooring, sheetrock installation and repair, floor leveling, mounting big‑screen TVs, and installing ceiling fans. He truly can do it all, and his pricing is always fair. What really sets Ryan apart is his honesty and integrity. He’ll tell you when something doesn’t need to be done or if there’s a more cost‑effective way to approach a project. That kind of transparency is rare, and why we trust him with every job. He is reliable, skilled, and genuinely trustworthy. I highly recommend Ryan!"
Custom tile shower
Tile shower
Completed Projects
Completed Projects
Completed Projects

+7

1 neighbors recently requested a quote
Avatar for A-1 PLUS REMODELING LLC
A-1 PLUS REMODELING LLC
5.0(
21
)

Serving Bryant, AL and surrounding areas

In business since 1995

Free estimates

Emergency services offered

"A-1 Plus Remodeling recently repaired the drywall in our bathroom. It required sanding and a complete skim coat. Rommel was punctual and did an excellent job for a reasonable price. He provided a detailed estimate of the work to be done and did exactly as quoted. The quote for the same work from another company was much higher. The skim coat was perfectly smooth and the final result was beautiful. I am definitely keeping his name and number for future work."
Painting - Interior Project and LVP floor
Basement remodel.
Painting - Interior Project
Remodeling - Kitchen & Bathroom Project
Painting - Interior Project

+182

Response time2 days
Recommended by100%of homeowners
Avatar for Dream Baths Of Alabama
Dream Baths Of Alabama
4.1(
74
)

Serving Bryant, AL and surrounding areas

In business since 1992

Free estimates

"Great.  I had this work done just over a year ago (should have submitted review sooner).
Estimate.  Charlie examined bathroom, had plenty of samples of options to review, and provided firm fixed quote.  There were some material issues that I'll note below.  At no time did the final cost change.
Timeline.  Installation began about a month or so after I accepted the quote and paid half down for material.  I think Charile was ready in about 2 weeks, but I had business travel.  Working together to find a common acceptable period for installation was easy.
Installation.  The first day Charlie showed up with a crew of 4 to take care of the electrical work (did have another ceiling fan installed) and demolition.  Following that, there were 2 full time workers on site.  They worked long hours, well over 8 hour days.  Normall, the job would have taken about a week.  I'll give more detail on the one issue below that drew the task out longer.  The guys were good about taking care not to impact the rest of the house (carpet, etc.).  After install, they did a good job cleaning up.
During the install, there were a few minor options ... how to frame the door, orientation of tile, the color of the tile, etc.  The crew provided options and good advice (I'm no kind of interior decorator).  The part of the service was excellent.
Quality.  I have done basic carpentry and electrical work.  I believe the quality of the work to be good to excellent, both what you see and what was done "behind the dry wall."  The work that you can see is excellent.
Material.  I was a little worried about the material used for the walls as opposed to tile.  I'm pleased to say I'm more than happy with the "acrylic" (I think that's correct) walls as well as base and door.
Only issue.  The base received was not the correct one.  The second base received had a quality issue.  They guys pointed this out to me.  I'm sure it cost them money out of their pocket / profit to spend the extra time on site.  My take away from this was the guys were MY quality advocates and did what was necessary to ensure the highest quality product was used and the job was done right the first time!  Things happen.  The question is how well does your contractor support you.  While I wasn't crazy about the delay (about 3 days, not major for me).  I was thrilled the issue was immediately brought to my attention and resolved even though it took extra effort on their part.
Overall job outcome.  I feel what was quoted was provided.  Very satisfied.
1 year review ... I remain satisfied.  I have had zero issues.  Other than the glass doors (which are famous for requiring cleaning when used for bath doors - this was noted before installation).  Is the biggest maintenance job.  Caring for the bath itself has required average to minimal effort.
Give Dream Bath / Charlie a call before you have your bathroom remodeled!
"
Dream Baths

+15

Recommended by82%of homeowners
Avatar for Maven Group LLC
Maven Group LLC
4.7(
13
)

Serving Bryant, AL and surrounding areas

In business since 2014

Free estimates

Emergency services offered

"I couldn’t be happier with the patio and sidewalk that the Maven Group installed at my home. It has a stamped concrete finish. They were very professional and helpful in guiding me through the decisions with the project. The patio and sidewalk look great and they left things in great shape when they left - pressure washed and repaired any tracks from the equipment (seeded and strawed). As an added bonus- my point-of-contact initially as well as the crew performing the work were all very nice and helpful. For reference: I should say that they actually removed and replaced a patio and sidewalk that another company did an unbelievably poor job on (and on that note: I would NOT recommend Austin Stamp Crete, Color Scapes, Inc., or Grant Parker DBA as either). So having such a bad experience with the first installation by another company, I was overly cautious with this one and had LOTS of questions. Everyone at Maven was very patient with all my questions. I recieved a recommendation for the Maven Group from a friend and would also recommend them to anyone else needing concrete work so am writing this review. I just wish I had found them sooner!"
Recommended by100%of homeowners
Avatar for Steinwinter Construction LLC
Steinwinter Construction LLC
4.2(
9
)

Serving Bryant, AL and surrounding areas

In business since 2001

Emergency services offered

"They showed up as promised ready to work. Took about 3 hours to install electric roof vent fan and blow in some additional insulation. Professional, courteous, and knowledgeable. Would use them again for future projects."
Handyman Services Project
Flooring
Flooring
Handymen Project
Front step , 4x4 coulums

+113

Recommended by87%of homeowners
Avatar for RJB Renovations LLC
RJB Renovations LLC
5.0(
4
)

Serving Bryant, AL and surrounding areas

In business since 2020

Free estimates

Warranties offered

"I had a whole house that needed lvp put down and the old floor tore up. RJB Renovations came in and got to work. One day they had all 3500 sq ft of flooring up and three days later the new floor was already installed. I'll definitely be calling them back for outer projects!!"
Response time9 hrs
...
Showing 1-10 of 59
Backsplash Installation questions, answered by experts

Replacing tile flooring can take a few days for a pro, but larger rooms will need more time. It takes eight to 12 hours for a tiling pro to remove old grout and tiles across 100 square feet. Then, it will take about four hours to prep the subfloor for tiles and another eight to 10 hours for a pro to install new tiles. Your tiling project may take up to a week, depending on the size of the room.

Tile shouldn’t be set tight against the tub. Bathtubs can expand when filled, and they can shift slightly with the weight of occupants. For this reason, it’s important to leave a slight gap between the bathtub and the first row of tile. Aim for a narrow gap of approximately 1/16 of an inch, filled with caulk, to allow for this expansion and movement while still allowing for tile shower waterproofing.

Regardless of the material, basic square tiles will never go out of style. Neutral colors like white, grey, beige, and black will always be in demand in residential and commercial settings. Certain designs, like herringbone and hexagonal patterns, are considered timeless. Porcelain and porcelain-like tiles will also never go out of style.

Most professional shower tile installations take between six and eight hours, depending on the size and complexity. Most projects get completed in a single workday. DIY-ing the project takes around three to four days or roughly 16 hours. However, this will vary based on the skill level of the person completing the work.

Yes, it would be best if you waterproofed your shower walls before tiling. The cement backing board behind the tile is not waterproof; it’s only water-resistant. On top of your tile backing board, be sure to use a waterproof shower membrane before you start installing your shower tiles.

The Bryant, AL homeowners’ guide to backsplash installation services

From average costs to expert advice, get all the answers you need to get your job done.