Top-rated contractors.

Get matched with top contractors in De Forest, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your contractor service project in De Forest, WI?

Select your specific project to find the pro for you.

TRUSTED BY DE FOREST, WI HOMEOWNERS

  • Average homeowner rating star icon4.7
    Average homeowner rating
  • Verified reviews icon63
    Verified contractor services reviews

Find Contractors in De Forest

Avatar for Steele Home Remodeling LLC
Steele Home Remodeling LLC
4.7(
34
)

Serving De Forest, WI and surrounding areas

Approved

In business since 2011

Free estimates

Warranties offered

"Everything about Phill and Fritz were easy which you cannot always say about working with a contractor. Work was fast, quality was excellent, price was fair. Will definitely use them again!"
Peaceful soaking tub with gold fixtures
Elegant and simple design
Double Bathroom Remodel
Mediterranean style kitchen
Living / Entertainment space

+52

1 neighbors recently requested a quote
Recommended by93%of homeowners
Avatar for Catalyst Custom Construction
Catalyst Custom Construction
4.6(
10
)

Serving De Forest, WI and surrounding areas

Approved

In business since 2015

Free estimates

Warranties offered

"Not once during our entire basement finishing process did I question our decision to work with Mike Hessling at Catalyst (formerly Apex). The entire process took just over a month to go from a completely unfinished basement to a brand new, beautiful, rec room, office, and 3/4 bathroom. Mike even dealt with all the curve balls we threw him along the way, switching colors midway through painting, adding an additional cabinet here. He is the kind of contractor you dream of. He's hands-on, there first thing every morning doing so much of the work himself! And the coordination with all the subcontractors was amazing. Everyone knew when and where to be and what exactly needed to get done. To top it all off, he came in right on budget as quoted (which was very fair). Mike's brother Adam was also key in the build, working hard with Mike or on his own."
Bathroom remodel
Newly remodeled from that black shower. Such a great refresh.
A beautiful bath in a new house
Additional Photos
New House!

+30

Response time3 days
7 neighbors recently requested a quote
Recommended by87%of homeowners
Avatar for VM Contracting LLC
VM Contracting LLC
4.6(
16
)

Serving De Forest, WI and surrounding areas

"Exceeded all expectations. Reached out to 7 Madison area interior contractors at the top of Yelp / Google in late July to get a quote for closet removal along with the possible addition of flooring work. Of the 7 contractors, 5 responded and came out to survey the job. Only 2 got back with rough quotes, a 3rd wanted ~$1k to come up with a quote. VM Contracting's quote and start date matched my rough budget and timeline expectations for the job, whereas some other quotes exceeded VM's by nearly 8x and could not begin work until 2-3 months later. Went ahead with VM and was not disappointed. They started work within ~2 weeks and I was so pleased with the closet work, that we expanded the scope to vinyl flooring & trim across the entire 1st floor. Again, the cost and timeliness were excellent. Would go to VM for any future work without hesitation."
Additional Photos
Recommended by92%of homeowners
A O Handy
4.1(
133
)

Serving De Forest, WI and surrounding areas

In business since 2002

Free estimates

Emergency services offered

"I was very impressed with the quality of the workmanship and their openness of my thoughts on the project. They were extremely thorough in explaining what was going to be done and why. They needed to set up scheduling for the chimney repair with my neighbors; they took care of arranging this with my neighbors all on their own. He did a very thorough follow up after the service."
Recommended by87%of homeowners
Avatar for GF Company
GF Company
4.6(
152
)

Serving De Forest, WI and surrounding areas

In business since 1974

Free estimates

Credit card accepted

"I would like to say that we would use GF Company in the future.
The Positive:
 The sales representative, Ken Jr., was astounding.  His knowledge of his field was excellent and I enjoyed talking with him.  He was also very thorough with his estimate and writing down in great detail what we wanted to have done.  I hope we get him as our sales representative when it is time to do our roof or our windows.
The work was done exactly as Ken Jr. had written on the estimate.  For the most part the work matches the current look of the shed and it has already filled the water barrel.  
The Negatives:
It was difficult to communicate with GF Company.  We had originally received a quote from Rick a year before the work was done and we contacted GF Company many times to speak with him about getting the work done, but none of our phone calls were returned.  Finally we asked for someone new and we got Ken Jr. sent to us.
After we paid our half-down deposit, we were told that we would get a call in about three weeks to find a date for the work to be done.  After about 5 weeks we tried contacting GF Company.  One phone call had us speaking with a lady on the phone who said that someone would call us back soon, but that never happened.
We never received a call to tell us when the work would be done as we wanted to have someone home to make sure things were done to our specifications.  Several days after our phone call was not returned, we received a text message from our neighbor telling us that someone was doing work on our property, but my wife and I were both at work and by time we got home the work was done.  Since Ken Jr. did such a great job with writing down what we wanted, we did not have any issues with what was done.
It appears that one of the items created on site for our downspout on the shed was likely spray painted on site.  The paint job has already faded, but we can find some paint to paint it again.
Overall, it sounds like we had a bad experience, but we did not.  The work that was done was done well and the sales representative we worked with was very knowledgeable.  We would use GF Company again and recommend them, but encourage folks to have patience with communication.
"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+19

Recommended by93%of homeowners
Avatar for Alpha Remodeling
Alpha Remodeling
5.0(
5
)

Serving De Forest, WI and surrounding areas

In business since 2019

Free estimates

Offers commercial services

With over 10 years of experience the contracting industry, we are the experts you need to take care of your home or business. We handle everything from remodeling to deck replacements. We will treat your home as we would treat our own. Give Alpha Building & Design LLC a call today, we look forward to working with you!

Response time3 days
Recommended by100%of homeowners
...
Showing 1-10 of 60
Unfinished Carpentry questions, answered by experts

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

Framing with metal studs can be significantly faster than using wooden studs, provided you have some experience working with the material. While you can use virtually instant pneumatic nailers with wood, metal requires installing screws. However, because metal is lighter, straighter, usually comes cut-to-length, and doesn't require sorting for the best pieces, you can save significant time using metal instead of wood.

Most of the time, you’ll want to use screws on your subfloor rather than nails. Nails can actually weaken plywood, whereas screws can easily penetrate without damage. They also form a more secure connection because of their shape, preventing squeaky floors and tightly holding the subfloor in place. That said, some contractors do prefer nails depending on the type of floor covering because they allow for more flexibility.

In framing, studs are placed at 16-inch intervals to coincide with the typical spacing of wall materials such as drywall or plywood. This spacing is called "on-center" and is necessary for maintaining structural stability and efficient use of materials. The 16-inch spacing also helps to distribute the weight evenly across the building's structure. For those looking to cut material costs and improve energy efficiency, 24-inch stud spacing can be employed through a method called "advanced framing". This requires careful planning and adherence to local building codes to ensure structural integrity.

Removing a load-bearing wall is best handled by professionals. However, if you have the skill set and decide to DIY the project, you will still need at least one additional person to assist you. Aside from helping with demolition, you'll need another hand to install the new support beam.

The De Forest, WI homeowners’ guide to contractor services

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"