Top-rated subcontractors.

Best subcontractors near Milford, VA

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Milford, VA?

Select your specific project to find the pro for you.

TRUSTED BY MILFORD, VA HOMEOWNERS

  • Average homeowner rating star icon4.7
    Average homeowner rating
  • Verified reviews icon319
    Verified subcontracting services reviews

Top-Rated Subcontractors in Milford - Updated Nov 2026

Avatar for C & E General Contractor LLC
C & E General Contractor LLC
New to Angi
Major Home Repairs (General Contractor)

Serving Milford, VA and surrounding areas

Approved

Small jobs welcome

C & E General Contractor has been in business for more than 7 years. Servicing the Richmond and surroundies cities. We offer siding replacement, roof replacement, bath and kitchen remodeling, floor replacement, demolition, window and door installation, decks and painting.

14 neighbors recently requested a quote
Avatar for MJL Contractors, Inc
MJL Contractors, Inc
4.7(
34
)
Major Home Repairs (General Contractor)

Serving Milford, VA and surrounding areas

In business since 1985

Free estimates

Credit card accepted

"The project has taken more time than anticipated due to material and subcontractor availability. The framing work was outstanding. Wall board work was also outstanding. Electrical work was very good, but the location of a bathroom fixture and chair lift power plug had to be moved because they were too low. The tile work in the bathroom (shower and floor), computer room (floor), entrance (floor) was outstanding, but I'd rather call it amazing. The plumbing work was very good, but parts availability delayed completion. Finishing work done by MJL was outstanding!!! Anthony is a master at detail. The rigor of MJL inspection of work by the subcontractors was very thorough and when issues were identified were recorded and worked off. Communication and follow up is a big deal for home improvement projects in this challenging environment of material, parts, and workforce shortages. MJL excelled in communication. We rated punctuality as good but would have rated them very good if there was an option. We highly recommend them. We have since booked two additional projects with MJL, a screened in porch and a garage redo. They start in late July. We expect both projects to go very well."
Recommended by96%of homeowners
Avatar for Fall Hill Contractor
Fall Hill Contractor
5.0(
13
)
Major Home Repairs (General Contractor)

Serving Milford, VA and surrounding areas

In business since 2017

Free estimates

Emergency services offered

"Seth is knowledgeable, professional and pleasant to work with. He offered suggestions and explanations that were very helpful. The entire crew was polite and diligent, and the work was well done. We are totally satisfied and will definitely call him again if we need other work done!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+8

Recommended by100%of homeowners
Apex General Contracting
4.6(
12
)
Major Home Repairs (General Contractor)

Serving Milford, VA and surrounding areas

In business since 2011

Free estimates

Emergency services offered

"The project went well. The time frame had to change because of an emergency with the lead carpenter and another time for weather Apex was very communicative about it. The work was done quickly and well. And most importantly, Carlos, the owner, consulted me on everything from what posts and railings I wanted to problem solving an issue. I found this very refreshing as most contractors just decide what is easiest for them and go with it, without talking to you."
1
2
-
-
-

+9

Recommended by100%of homeowners
...
Showing 1-10 of 79
Subcontractors FAQs, answered by experts

It usually takes around four to six months to build and install a modular home, although your timeline could go up to around eight months if there are delays in the manufacturing or permitting process. Heavy site preparation and foundation pouring can extend that timeline if you need them, as can customizations you want for your modular home. Your modular home company should be able to provide an estimate for the construction timeline before you sign any contracts or agree to any work.

The average build timeline for a home is between six and 12 months, with timelines pushing toward the upper end of that range if you’re creating a custom design or need a lot of land preparation before getting started. Hiring a general contractor or a custom homebuilder will help speed up the process, as you’ll see fewer delays between different parts of the build process getting done.

Villa exterior features often include large windows, arched doorways, patios, terraces, greenery, and gardens. Common exterior colors for villas are whites and off-whites, soft browns, and clay tones. 

Drawing your own floor plans is acceptable for many kinds of projects, including interior design and room layout. You can use floor plan software to create the plans but keep in mind that the floor plan will only be as accurate as the measurements you take and enter into the software.

Above all, the downside to building a new house is a longer timeline. You need several months to finish the build, depending on the supply chain and labor availability in the meantime. Building a home compared to buying one is also more expensive, both in the building process and when it comes to mortgage rates and property taxes.

The Milford, VA homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.