Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Floyd, VA

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Floyd, VA?

Select your specific project to find the pro for you.

Find Above ground pool installation pros in Floyd

Avatar for Main Street Solar
Main Street Solar
5.0(
6
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Floyd, VA and surrounding areas

In business since 2008

Free estimates

Credit card accepted

"Andrew and his company did an amazing job with our solar system install.  They met with us, explained our options, and delivered exactly the system we were looking for.  He was always prompt, courteous, and professional.  The system looks great on our home.  The install is very clean(which was one of my wife's big concerns).  The attention to detail that they paid to our project was amazing.  They went above and beyond what was required.
I can't say yet how much electricity our system will generate since it was just installed.
I will definitely call Andrew again when I am ready to expand our system further or add Solar water heating for our pool.

"
Professional service
Clean Installations!
Built for a life time!
Recommended by100%of homeowners
Avatar for James Pools Repair & Services LLC
James Pools Repair & Services LLC
5.0(
3
)
Above Ground Swimming Pool or Accessories - Repair or ServiceSwimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Floyd, VA and surrounding areas

In business since 2015

Free estimates

Emergency services offered

Intex Commercial Pools, Pool Repairs ,Closing ,Opening ,installs ,Clean\nSpa Repair , Cleaning ,Closing, hot tub repair\n\nI try my best to make every customer happy I care about satisfication and saving money I have kids I take care of that look up to me so I grind my butt off for them everyday to show them that hard work plays off Im all about helping families make memories and putting a smile on kids faces\n\nI been in business for 2 years now I been doing this for 6 year total I'm your man for anything guaranteed satisfied 100%

Recommended by100%of homeowners
Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,688
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Floyd, VA and surrounding areas

In business since 1971

Credit card accepted

"One oven doesn't work at all ( my choice, see above), the "working" oven was never calibrated properly so using it is hit or miss. It's time to call American Home Shield to see about replacing the entire unit. I'm waiting to finish other home projects before calling them. I don't know if I'll request Greenway again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Avatar for First Choice Contracting
First Choice Contracting
4.3(
6
)
Swimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Floyd, VA and surrounding areas

In business since 2016

At First Choice Contracting, we pride ourselves in "Building Peace of Mind" for our customers. Whether we are working on large commercial flat roofs or small residential shingle roofs, we give you the quality, price, and attention to detail that every project deserves. Our services include: shingle roofs, metal roofs, flat roofs, solar panel installations, large remodel projects for both residential and commercial buildings, and property maintenance contracts. Please give us a shout for any of your roofing or remodel needs.

Additional Photos
Recommended by83%of homeowners
Jose's Construction
5.0(
1
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Floyd, VA and surrounding areas

In business since 2016

Free estimates

Offers commercial services

Jose's Construction, is committed to excellence every aspect of our business. We uphold a standard of integrity bound by fairness, honesty and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers interests, and make their concerns the basis of our business.

Response time2 hrs
Recommended by100%of homeowners
Install Above Ground Pools questions, answered by experts

Your pool should only lose around 1/4 of an inch of water per day, give or take. More wind, sunlight, and heat will cause this number to increase, while rainy or cloudy days will decrease the amount of water that evaporates.

The process involves selecting a site, preparing the ground, setting up a supportive frame, and securely installing the liner and water filtration system.

An easy way to know whether your sand filter has enough sand is to check how full the filter is and what the sand looks and feels like. The filter container should be two-thirds to three-quarters full of sand. Look for interior marks indicating the ideal sand level. If you put your hand into the sand, it should flow through your fingers without clumping. The filter pressure gauge is also an easy indicator—the right amount of sand leads to normal pressure, while too much or too little sand can cause high or low pressure.

Yes, zero-entry pools are also referred to as beach-entry pools because the gentle slope leading to the water mimics the natural slope of a sandy shore leading to a lake or ocean. You can bring in sand or pebbles to truly capture the beach-like feel of a zero-entry pool.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

The Floyd, VA homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.