Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Floyd, VA

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Floyd, VA?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Floyd

Extreme Design Group Inc.
5.0(
6
)

Serving Floyd, VA and surrounding areas

In business since 2001

Free estimates

Credit card accepted

"My wife and I built a house in 2019 and was undecided on if we wanted to hard surface our driveway so we decided to hold off. As we moved into spring/summer 2020 we decided to move forward with hard surfacing our driveway. After receiving 2 asphalt quotes I reached out to Chris with Extreme Design and he not only provided a competitive quote for asphalt he also provided a concrete quote. My wife and decided to go with concrete, and we are happy with that decision. Chris and his team showed up on time, had the proper equipment and seasoned man power and delivered an awesome driveway for us. If we ever need any other hard surfacing done we will be calling Chris and team!!!"
Concrete - Pouring & Repair Project
Driveways - Concrete Project
Concrete - Pouring & Repair Project
Recommended by100%of homeowners
Avatar for Green, Greene, and Greener
Green, Greene, and Greener
4.0(
8
)

Serving Floyd, VA and surrounding areas

In business since 2001

Free estimates

Credit card accepted

"They are excellent. They were so good, we ended up hiring them to put in hardwood floors, they painted all of upstairs, remodeled the entire kitchen, and they replaced some tile in our ceiling. We have been hiring them over the course of two years and they have been excellent. We highly recommend them to our friends all the time and we will be hiring them again."
Before
Before
After
After
Additional Photos

+15

Recommended by85%of homeowners
Rocky Mount Paving Company, Inc
4.0(
1
)

Serving Floyd, VA and surrounding areas

In business since 1968

Free estimates

With over 49 years of experience in the paving industry, we are the experts you need to take care of your home or business. We handle everything from excavation to asphalt paving to parking lot striping. We will treat your home as we would treat our own. Give Rocky Mount Paving Company, Inc, a call today, we look forward to working with you!

Response time1 day
Recommended by100%of homeowners
David J. Emge Paving
5.0(
1
)

Serving Floyd, VA and surrounding areas

In business since 1994

Free estimates

Credit card accepted

David J Emge Paving is the premier professional company offering residential services to our clients in the Chester area. We are known to pay exquisite attention to detail while making your satisfaction our number one priority.\n\nPlease call us today to schedule your appointment with Virginia's true professionals at work for you!

Response time2 days
Recommended by100%of homeowners
Showing 1-10 of 11
Asphalt Driveways questions, answered by experts

To maintain their strength, asphalt driveways and parking lots need to be sealcoated once every two to five years. You may also need to reapply paint striping every few years as it fades to ensure drivers can safely navigate the parking lot.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

Yes, with colored finishes and decorative stamping for a personalized touch.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

Concrete is typically the best material for a driveway if you’re looking for longevity, cost-effectiveness, and ease of maintenance. But, it’s not ideal for areas with annual freeze-frost cycles, nor is it the most attractive option—although you can get it stamped or painted. If your location is consistently below freezing, asphalt may be a better choice.

The Floyd, VA homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"