Top-rated basement remodelers.

Best basement remodelers near Jacksboro, TN

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Jacksboro, TN?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in Jacksboro - Updated Nov 2026

Avatar for Edward Perry Builder
Edward Perry Builder
5.0(
8
)
Basement - Remodel

Serving Jacksboro, TN and surrounding areas

Approved

In business since 1988

Free estimates

Emergency services offered

"Edward Perry did an outstanding job remodeling my bathroom, and I couldn’t be happier with the results. From start to finish, he was professional, reliable, and detail-oriented, making sure every aspect of the project was done right. His craftsmanship is excellent—the tile work is flawless, the fixtures were installed perfectly, and the entire space looks modern and refreshed. He kept the area clean during the process, communicated clearly, and stayed on schedule, which I really appreciated. I would highly recommend Edward to anyone looking for quality remodeling work."
Full Kitchen Remodel
Full Kitchen Remodel
Full Kitchen Remodel
Full Kitchen Remodel
Full Kitchen Remodel

+3

Response time7 hrs
Response rate100%
1 neighbors recently requested a quote
Avatar for AAA Basement Waterproofing
AAA Basement Waterproofing
4.8(
83
)
Basement - Remodel

Serving Jacksboro, TN and surrounding areas

In business since 1995

Free estimates

Emergency services offered

"Jeff told me the foundation settling was very minor for a house built in the 1970's.  No water problems in basement.  He did recommend I have the gutters replaced, with 6" gutters, and to make sure water is draining away from house.  Also, he asked me to contact him if the foundation settled more in the future.  He did not do any work other than give me a free evaluation.  Jeff was very professional and honest. I will definitely use his company if I have anymore foundation or drainage issues.
"
Full Interior Encap Sys
Full Interior Crawl Drainage Sys
Before Crawl Drainage System
Before Sub-Floor System
After Sub-Floor System

+5

Recommended by100%of homeowners
Avatar for Stefaniak Construction
Stefaniak Construction
4.7(
13
)
Basement - Remodel

Serving Jacksboro, TN and surrounding areas

In business since 2017

Free estimates

Credit card accepted

"Dillon gave a fair price for storm damage to an old structure. He was upfront with schedule and updated with delays. Final result was very satisfactory. All workers were professional. I will contact Stefaniak for future construction needs. So happy with results!"
Custom fireplace
Installed new door where window was built stairs and finishing up stain
We started to tear the chimney down
Custom fireplace
Outside after we stained everything

+55

Recommended by100%of homeowners
Showing 1-10 of 44
Basement Remodel FAQs, answered by experts

If you have the woodworking experience to build a bar from scratch and you have the time, DIYing the work is a no-brainer and can save a few thousand dollars. However, if you’re looking to include a sink, additional lighting fixtures, or high-end bar tops and cabinets, it’s usually a better idea to call in a pro. It will cost more, but the finished product will likely be worth it.

You should plan on waiting at least a year and ideally two to three years after construction before finishing your basement. This will give the foundation time to settle in response to the weight of your home and the expansion of the surrounding soil. You can then repair your foundation and seal any cracks as needed before finishing it to reduce your risk of future leaks or other issues.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Create a checklist, reimagine the space use, set a realistic budget, choose materials and aesthetic details, and get professional support for guidelines and troubleshooting.

It is common for a contractor to ask for a down payment before starting a project, especially for jobs that require purchasing materials and equipment or hiring a crew. The deposit amount can range from 10% to 50% of the total job cost. While a request for up to 50% is not unusual, a contractor should not ask for more than that, and you should never pay for a project in full before the work has begun. To protect yourself, always discuss payment terms before starting and have a written contract that outlines the project timeline and expectations. Additionally, be sure to hire reputable contractors and check their licensing and insurance before the project begins.

The Jacksboro, TN homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.