Top-rated basement remodelers.

Get matched with top basement remodelers in Mascot, TN

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Mascot, TN?

Select your specific project to find the pro for you.

TRUSTED BY MASCOT, TN HOMEOWNERS

  • Average homeowner rating star icon4.7
    Average homeowner rating
  • Verified reviews icon17
    Verified basement remodels reviews

Find Basement remodelers in Mascot

Avatar for MAG Construction
MAG Construction
3.0(
2
)
Basement - Remodel

Serving Mascot, TN and surrounding areas

Approved

In business since 2018

Free estimates

Warranties offered

MAG Construction is a homebuilder with a passion for the southern lifestyle and a focus on responsible building standards.\n\nAt MAG Construction, we are a proud leader of interior and exterior remodeling, and outdoor kitchens in Knoxville, Tennessee and the surrounding towns, counties and areas. We are among the fastest growing construction & remodeling companies in Knoxville, TN.

Bathroom Vanity
Pool house from the back of the house
Patio/Roof Addition
Kitchen 2
Pool house from front of house

+42

7 neighbors recently requested a quote
Avatar for AAA Basement Waterproofing
AAA Basement Waterproofing
4.8(
83
)
Basement - Remodel

Serving Mascot, TN and surrounding areas

In business since 1995

Free estimates

Emergency services offered

"My experience started out great, from the first call to the evaluation. I was able to get an appointment within the same week. Even called back to let me know an opening had become available. During the evaluation I felt AAA Basement was being honest with me about what was needed. No Services were needed, but I was a list of things to work on to prevent mold from developing. The list was explained thoroughly and discussed the need for a Dehumidifier. We have since put in the dehumidifier and things are going great.
"
Full Interior Encap Sys
Full Interior Crawl Drainage Sys
Before Crawl Drainage System
Before Sub-Floor System
After Sub-Floor System

+5

Recommended by100%of homeowners
Avatar for Stefaniak Construction
Stefaniak Construction
4.7(
13
)
Basement - Remodel

Serving Mascot, TN and surrounding areas

In business since 2017

Free estimates

Credit card accepted

"Dillon gave a fair price for storm damage to an old structure. He was upfront with schedule and updated with delays. Final result was very satisfactory. All workers were professional. I will contact Stefaniak for future construction needs. So happy with results!"
Custom fireplace
Installed new door where window was built stairs and finishing up stain
We started to tear the chimney down
Custom fireplace
Outside after we stained everything

+55

Recommended by100%of homeowners
Avatar for Wood Construction & Remodeling
Wood Construction & Remodeling
4.5(
17
)
Basement - Remodel

Serving Mascot, TN and surrounding areas

In business since 2016

Free estimates

Credit card accepted

"A-plus! My bathroom remodel turned out beautifully! Excellent communication and professionalism throughout the process - from demolition to finish! Jake and Joe showed up on time and projects were completed as estimated. Worksite was kept tidy and cleaned at the end of each day. They had great ideas and resources to keep my remodel within budget. Thanks so much!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+14

Recommended by84%of homeowners
Avatar for Honesty & Fidelity Transportation
Honesty & Fidelity Transportation
5.0(
30
)
Basement - Remodel

Serving Mascot, TN and surrounding areas

In business since 2014

Free estimates

Emergency services offered

"I hired two helpers for 2 hours on October 17,2020. The two helpers (names unknown) arrived at my home (127 Gado Way, Loudon) and immediately started unloading the Penske truck with the contents being moved into my garage. Some of these boxes and some bare items were very heavy and awkward. After this with plenty of the 2 hours remaining we took the truck to a nearby storage unit where they helped load all items then return to my home and unload into the garage. The two men hired worked vigorously without complaint during the entire operation taking no breaks except to drink a bit of water. I would recommend these two workers anytime for any type of assistance. Please extend our thanks to these two men again for us, John & Linda Sutton"
Baby Grand Piano Movers
Auto Hauling
Safe Movers
Upright Piano Movers
Trusted Men Muscle Movers

+31

Recommended by100%of homeowners
...
Showing 1-10 of 85
Basement Remodel questions, answered by experts

Although it’s not required, air ventilation in a finished basement can help improve the air quality, prevent moisture and mold issues, keep musty odors away, and also maintain the air quality throughout the rest of your home. Proper ventilation will help maintain the value of your investment in finishing your basement. Try basement ventilation methods like installing vents or a dehumidifier for best results.

Renovation enhances functionality, increases home value, and can add new space for personal or family needs. It typically modernizes older unfinished basements for new uses.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

You should always use high-quality lumber for your framing in order to ensure it will last the test of time and resist moisture. Use 2-foot by 4-foot lumber that is pressure-treated for your framing.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

The Mascot, TN homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.