Top-rated excavation pros.

Get matched with top excavation pros in Lexington, SC

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Lexington, SC?

Select your specific project to find the pro for you.

TRUSTED BY LEXINGTON, SC HOMEOWNERS

  • Average homeowner rating star icon4.7
    Average homeowner rating
  • Verified reviews icon34
    Verified excavation services reviews

Find Excavation pros in Lexington

Avatar for Javier Ramos Landscaping, LLC
Javier Ramos Landscaping, LLC
4.9(
8
)
Landscape - Minor Grading or Resloping

Serving Lexington, SC and surrounding areas

Approved

In business since 2018

Free estimates

Warranties offered

"Javier Ramos Landscaping LLC did a fantastic job installing the new sprinkler system. The newly laid sod was peeled back and the trenches were all hand dug. Javier put the system under the driveway without the need to cut it. It took Javier and his crew 1 day to complete the sprinkler system. The lawn was back to normal and no sign of the trenching exists. I would highly recommend Javier Ramos Landscaping LLC."
Response time7 hrs
Recommended by85%of homeowners
...
Showing 1-10 of 199
Excavating questions, answered by experts

Sewer lines can be buried anywhere from 18 inches to 8 feet deep, with a common average depth between 18 and 30 inches. The exact depth depends on local factors like climate and soil type. In colder regions, pipes must be buried deeper (below the frost line) to prevent freezing, sometimes as deep as 8 feet. The digging depth can also impact the cost of sewer line replacement. To find the specific depth for your property, you can check the building plans for your system, which should be on file with your city or local sanitation department since permits are required for installation.

Completion time ranges from days to weeks, contingent on project size, environmental conditions, and regulatory approvals.

The time it takes to build a pool—and dig out the area—varies based on the pool size and type. A professional excavator will take between four and eight hours to dig a pool. The process will take longer if they encounter large boulders or tree roots. Keep in mind that this is a small part of the process in the long run. You will need between eight and 12 weeks to build a pool from start to finish, including the time to apply for permits.

Yes, you can excavate in the winter, but it might make the job harder. Frozen ground is harder to dig, and snow or ice can make the work site more hazardous. A contractor may need special equipment and techniques, such as ground-thawing methods, to break through frozen soil. Although winter excavation is possible, it may take longer and be more costly than excavating during warmer months.

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

The Lexington, SC homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.